My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2215 S Standard Ave - Soils Report
PBA
>
Building
>
Soils Reports
>
S
>
Standard Ave
>
2215 S Standard Ave
>
2215 S Standard Ave - Soils Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 9:12:16 AM
Creation date
6/28/2021 9:12:10 AM
Metadata
Fields
Template:
Soils Report
Full Address
2215 S Standard Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Report of Soils lnvestigation <br />2215 South Standard Ave., Proposed Addition <br />Santa Ana Califoruia <br />Page 24 of 27 <br />Job No. 40-0613 <br />April 5. 1999 <br />In addition, it is recommended that all pavement areas conform to the foliowing <br />cfltena <br />L All trench backfills, including utility and sprinkler Iines, should be <br />properly placed and adequately compacted to provide a stable <br />pavement subgrade <br />An adequate drainage system should be provided to prevent <br />surlace water or subsurface seepage from saturating the subgrade <br />soil. <br />Placement and construction of the recommended pavement section <br />should be performed in accordance with the Standard <br />Specifications for Public Works Construction. Class II Base <br />should be used as outlined and should have a minimum R-Value of <br />78 and a minimum sand equivalent of25. Final in-place density of <br />the Class II Aggregate Base should be 95 percent of the minimum <br />dry density per ASTM D-1557. <br />Surface run-off and irrigation water should be directed away from <br />the parking areas to avoid contributing to wet or saturated <br />materials beneath the pavement. <br />5. Pavement sections are prepared assuming that periodic <br />maintenance of pavements rvill be done, including sealing of <br />cracks and other measures <br />I <br />) <br />J, <br />4. <br />J
The URL can be used to link to this page
Your browser does not support the video tag.