Laserfiche WebLink
-,-SANTA <br />NA <br />Pl.r\\11\c <br />&BUt,Dt\[ <br />lcil0 <br />Plan n ing & Building Agency <br />Building safety D ivision <br />20 Civic Center Plaza <br />P.0. Box 1988 (M-19) <br />Santa Ana, CA92102 <br />(714) 647-5800 <br />www.santa-ana.org <br />DISABLED ACCTSS COMPLIANCT <br />DOCUMENTATION FORM <br />ACC-01 CBC 2019 <br />A. PURPOSE OF THIS DOCUf\i|ENTATION: (check one) <br />X finOing of ,nreasonable hardship for prolects UNDER the valuation threshold. <br />L_.1 Finding of unreasonable hardship for projects OVER the valuation threshold" <br />E Certification of Full Compliance with the 2019 California Building Code <br />. Valuation threshold as defined in the 2019 California Building Code, Section 118-202.4 (Exception #8) and <br />Section 202 is $170,466.0o (as of January 2020) <br />B. PROJECT INFORIVIATION TO BT COMPTETED BY PETITIONER: <br />Permit Numb€rl <br />101104315 <br />Projecl Descrlption: <br />Repair fire damage at floor framing <br />Floor Number <br />Business Name / Owner: <br />TBO - Tenant space is vacant <br />Business Phone Number <br />Phone Number: <br />Total Construction Cost or Project Valuation$ str,tso <br />1 . The cost of all construction contemplated in the determination of the valuation of improvement threshold <br />based on the valuation of site and building improvements for the last three-year period. <br />Permit No lssuance Date Valuation of lmprovements <br />Total: <br />$ $2.630 <br />$ $3,74s <br />4. Describe the impact of the proposed improvements on financial feasibility of the project. <br />Accessible parking space shall be re-asphalt to comply. <br />5. Describe the nature of the use of the facilily under construction and its availability to persons with <br />disabilities and the nature of accessibility that would be gained or lost: <br />Burldrng wrll be vacant duflng conslruction. <br />Rev 02/0412020 Page 1 ol 2 <br />Projecl Address: <br />2010 ftrain Sl. <br />Legal Property Owner: <br />Cost of Providing Completo Disabled Accessl$ $s,zas <br />2. 20ok of fol€l Construction Cost or Project Valuation: <br />3. The actual amount to be spent to provide disabled access: