Laserfiche WebLink
J Planning & B uildin g Agency <br />Buildinq safety Division <br />20 C ivic Center Plaza <br />P.0. Box 1988 (M-19) <br />Santa Ana, C A 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />DISABLED ACCESS COMPLIANCE <br />DOCUMENTATION FORM <br />ACC-01 CBC 2019 <br />A. PURPOSE 0F THIS D0CUMENTATION:(checkone) <br />X finOing of unreasonable hardship for projects UNDER the valuation threshold- <br />L_l Finding of unreasonable hardship for prolects OVER the valuation threshold* <br />n Certification of Full Compliance with the 2019 California Building Code <br />* Valuation threshold as defined in the 2019 California Building Code, Section 1'l 8-202.4 (Exception #8) and <br />Section 202 is $170.466.00 (as of January 2020) <br />B. PROJECT INFORI\iIATION TO BE COMPLETED BY PETITIONER: <br />Project Address: <br />2010 - 1/2 lrain St <br />Permit Number <br />101 104316 <br />Projoct Descriptionl <br />R€move portion of inlerior non bearing panition <br />Floor Number: <br />Business Name / Owner: <br />TBD - Tenant space is vacant <br />Legal Property Owner Phone Number <br />Total Conskuction Cost or Project Valuation <br />$ $+,+oo <br />Cost of Providing Complete Disabled Access <br />$ $r,ozo <br />Permit No lssuance Date Valuation of lmprovements <br />Total <br />2. 20o/o ol -|.otal Construction Cost or Project Valuation: <br />3. The actual amount to be spenl to provide disabled access: <br />$ $880 <br />5. Describe the nature of the use of the facility under construction and its availability to persons with <br />disabilities and the nature of accessibility that would be gained or lost: <br />Building willbe vacant during construction. <br />Rev 0210412020 Page 1 of 2 <br />$ $1,070 <br />-,-SANTA <br />NA/l[{* <br />Business Phone Number: <br />1 . The cost of all construction contemplated in the determination of the valuation of improvement threshold <br />based on the valuation of site and building improvements for the last three-year period. <br />4. Describe the impact of the proposed improvements on financial feasibility of the project. <br />Accessible parking space shall be re-striped