Laserfiche WebLink
Pl.nnlng E Bulldlng Ag.ncy <br />Bulldlng Sdltty DlvElon <br />Al Clvlc Crnt r Phra <br />P.O, Bd l9tt ([491 <br />Santa Ana, CA 92702 <br />Fr.l 6.7{E00 <br />wwwsanta{n1o]! <br />DISABLED ACCESS COMPLIANCE <br />DOCUMENTANON FORM <br />ACC-01 CBC 2019 <br />A" PURPOSE OF THIS DOCUMENTATION: lcneck one; <br />! Findir€ of unreasonable hardship for projects UNDER the valuation threshold' <br />E Finding of unreasonable hardship for projects OVER the valuataon threshold* <br />I CertiRcation ot Full Compliance with the 2019 California Building Code <br />* Valuation threshold as defined in the 2019 California Building Code, Section 11&202.4 (Exception rE) and <br />Section 202 is a'l7o.aA,O (as of January 2020) <br />B. PROJECT INFORMATION TO BE COMPLETED BY PETITIONER: <br />Proieci Address: <br />'1761 East Saint Andrew Place, Santa Ana <br />Permit Number: <br />lo I lo 9eo 6];o-t <br />fI38S ft"p?8{8h$"t i"crudrng new tury complranr M/w resrrooms nr 2. new T24 <br />lighting flr I & 2. new pod.r. ncw finishes <br />Floq Number <br />1&2 <br />Business Name / Owner <br />Deutsche Bank <br />Business Phqre Number <br />LegEl Property Orner: <br />Lincoln Property Company <br />Phq|e Numberi <br />949.333.2116 <br />Total Constructiql Cc6t or Proiect Valuatio.r$ s 873,126.00 <br />C6t of Proridng Cqnplete Dsabled Access <br />o <br />'1. The cost of all construction contemplated in the determination of the valuation of improvement thleshold <br />based on the valuation of site and building improvements for the last three-year period. <br />Permit No lssuance Date Valuation of lmprovements <br />Total <br />2. 2oo/o of Folal Construction Cost or Project Valuation: <br />3. The aclual anlount to be spent to provide disabled access <br />4. Descrabe the impact of the proposed improvements on financial feasibility ot the project <br />5. Describe the nature of the use of the facilrty under construction and its availability to persons with <br />disabilities and the nature of accessibility thatwould be gained or lost: <br />The facility is an offlce workplace currently occupied at 20% capacrty due to the pandemic. The <br />proposed scope of work includes construction of additional fully accessible plumbing flxtures that <br />exceed minimum plumbing requirernerits. Refer to sheets A0.004, A0.005, A0.020-023, A2.201 tor <br />existing aM new accessible features throughout the area of work. There is rE accessihility that will <br />be lost by this scope. <br />Rev 02/0412020 Page 1 of 2 <br />$ <br />*-SNIA <br />NA.ffi <br />l <br />q