My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
550 S Harbor Blvd - Misc. Permit
PBA
>
Building
>
Permits
>
H
>
Harbor Blvd
>
550 S Harbor Blvd
>
Misc.
>
550 S Harbor Blvd - Misc. Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2021 11:36:41 AM
Creation date
6/29/2021 8:07:08 AM
Metadata
Fields
Template:
Misc. Permit
Full Address
550 S Harbor Blvd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/o/ for/ 0 <br />E <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box'1988 (M-19) <br />Santa Ana, CA927O2 <br />(714) 647.5800 <br />w\,vu/.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-o1 cBc 2013 <br />Project Address: <br />Contractor Company Name: <br />Gontractor License Number: <br />SOUTHWEST SUN SOLAR, INC <br />1004667 <br />Are the following applicable to the ProPosed project? <br />Will the PV system layout provide the required three-fool wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one rooling layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Wll the PV system be inslatled where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be inslalled with a space of 2" minimum to 10" maximum betlveen <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without uslng any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (wilh pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the slructural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support ion.) <br />I certify under penalty of perjury under the laws of the State of California above is true <br />TRANG CONG PHAIV1 <br />Phone Nurnber 714 582 3909 Date <br />Email Address <br />1 <br />YES NO <br />B tr <br />3 <br />Ettr <br />8tr <br />Etr <br />Etr <br />atr <br />4 <br />6 <br />7 <br />8 <br />I <br />trtr <br />Etr <br />AD <br />10 Etr <br />I <br />*-SNTA <br />NA,"ffi <br />Rev An712015 <br />PERrV rT@SOUTHWESTSUNSOLAR.COTM <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The llcensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of Plans, of <br />minimum 1 1" x 17" size. lf answerinq NO to anv of lhe questions. plan check shall be required. <br />550 S. HARBOR BLVD, SANTA ANA, CA 92704 <br />Print Name:Signature:
The URL can be used to link to this page
Your browser does not support the video tag.