Laserfiche WebLink
U,-SANTA <br />NA,',ri[ffi <br />'! <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Centsr Plaza <br />P.o. Box 198t (M-19) <br />Santa Ana, CA 52702 <br />(714) 647-s800 <br />www.santa-ana.org <br />Ftvise4 - Fll"rl"rl b.\ pb^t <br />DISABLED ACCESS COMPLIANCE <br />DOCUMENTATION FORM <br />F,'1. <br />ACC-01 CBC 2016 <br />A. PURPOSE OF THIS DOCUMENTATION: (check one) <br />I finding of unreasonable hardship for projects UNDER the valuation threshold* <br />ffi Finoing of unreasonable hardship for projects OVER the valuation threshold. <br />E Certifcation of Full Compliance with the 2016 California Building Code <br />. Valuation threshold as defined in the 2016 California Building Code, Section 118-202.4 (Exception #8) and <br />Section 202 is $156.162 (as of January 2017\ <br />B. PROJECT INFORMATION TO BE COMPLETED BY PETITIONER: <br />The cost of all construction contemplated in the determination of the valuation of improvement <br />threshold based on the valuation of site and building improvements for the last three-year period. <br />lssuance Date Valuation of lmprovements <br />Nol known by new owner <br />Total <br />2. zook ol Folal Construction Cost or Project Valuation: <br />3. The actual amount to be spent to provide disabled access <br />$ 265,000 <br />$ s88,07s <br />4. Describe the impact of the proposed improvements on financial feasibility of lhe project. <br />New bullding ownership is exceeding the 207. ol construction costs to upgrade accessibility features at entire site <br />Beler lo Table 6 valual ons <br />5. Describe the nature of the use of the facility under construction and its availability to persons with <br />disabilities and the nature of accessibility that would be gained or lost: <br />Existing iacility is an office use park. There is currenlly accessible parking at garage level, with elevator lobby access to <br />buildings, wilh layoul to be updaled to current code. There is an existing accessible path oi lravel ,rom Harbor Blvd. lo the <br />raised podium level which serves main I st floor entrances lo blrrldrngs. <br />Accessibility ,eatu re that would be ga ned' Locat on ol required slandard accessible parking stals at park ng garage <br />level, represent the sho(est roule possible 1o bolh buildings, through lhe elevator lobby Accessib lity feature 10 be <br />lost- D!e 1o required overhead clearance, (8' 2") slandard accessible stalls at parking level will not meet this <br />requirement. The proposed van accessible stall locat on is located outside ol park ng garage level, but does note <br />meet shortest route to building entrances and th s location is also limrted to a single van stall, inslead ol lhe requ red <br />Rev 119/2017 two slalls Pagelol2 <br />Project Address: <br />3100 3130 S. Harbor Blvd <br />Permit Number: <br />10198428 35 <br />ProJect Description: <br />lnlerior tenant improvemenls <br />Floor Number: <br />1-5 <br />Business Name / Owner: <br />Kearny Fleal Estale Co <br />Business Phone Number <br />(310) 203-1861 <br />Legal Property Owner: <br />Kearny Harbor, LLC <br />Phone Number: <br />(310) 203-1861 <br />Total Construction Cost or Project Valuation <br />$ r,345,000 <br />Cost of Providing Complete Disabled Access <br />$ see'ozg ( w tl&,-ul *.-g/ i' 4.a, <br />t_ <br />Permit No.