My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2033 W Chandler Ave - Misc. Permit
PBA
>
Building
>
Permits
>
C
>
Chandler Ave
>
2033 W Chandler Ave
>
Misc.
>
2033 W Chandler Ave - Misc. Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 11:07:09 AM
Creation date
6/29/2021 8:07:12 AM
Metadata
Fields
Template:
Misc. Permit
Full Address
2033 W Chandler Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-,-SANTA <br />A]\IA,"li}Jtr <br />Planning & Buitdino Aoencv <br />Bullding Safety Oi;sio-n <br />20 Civic Centgr ptaza <br />P.O. Box ,t988 (M-r9) <br />Santa Ana. CA 9220i <br />,(7r4) 647-5800 <br />www.santa-ana.org <br />tolqqol) <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />SOL 01 cBc 2013 <br />Solar photovottaic (PV; Che#f st for Detached SINGLE FAMILY RESIDENCES Onfy <br />lnstruct lons: The licensed conhactor of record shall complete all sectio ns,answer the ten questions and <br />mtnl <br />certification section below. A co pv of this form shall be aftache dto each of TWO sets of plans, ofmum 11" x 17" size.a <br />ProjectAddressi Zo3>'LLn"^)k- A.,,u. <br />sign the <br />Contractor Company Name: <br />Contractor License Number: 4 ?5 7r,9 <br />1 <br />YES ilo <br />tr Are the following applicable to the proposed project? <br />',rr the PV system rayout provide the required thre+.foot wide crear access pathwaysper Section 60s.11 of the Califomia Fire bode, <br />";;1" il;;*, on the roof ptan? <br />Will the PV system b6 installed on a roof having only one roofing layer with nooverlays? <br />Will the PVanay be flush mounted to the existing roof so that the plane of themodules (panels) are parallel to the plane of tfre loofa <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV dy.item be installed.where the modules do not overhang any roof edges(such as eaves, gabled ends, ridges and hipsli <br />will the PV system be installed.with a space of 2" minimum to 10" maximum betweenthe underside of modules and the surface of tne roof? <br />$l',jfr"u "^"m be installed without using anv bailast system or counter-weight <br />Will the anchors be installed with a maximum hon:ontal anchor spacing of 6 feetand is this maximum horizontal spacing shown ".;;i;;;;-will the minimum 5/16'rag screw.s be instaled with a minimum of 2-112 inch <br />:[1"f];[jj'nroor rafters (with pre-drilled n"r""l "rJ'i" inil minimum embedmant <br />Are ALL the structural pages of the plans stamped and signed by a Califomialicensed professional engineer? (inctuaing project spe"mJ"ii" olar, pV layout,anchorage spacing, anchorage detair. <br />"n'o-.a'n-uiif,]i"i!'pi lrpport rnformation.) <br />2. <br />3. <br />4. <br />5. <br />tr <br />tr <br />tr <br />tr <br />o <br />tr <br />tr <br />a <br />tr <br />6 <br />7 <br />8 <br />o <br />10. <br />I certify under penalty of perjury under the laws of th 6 Stat6 of California that the above isPrint Name:/,.,rf,>r''(- <br />Phone Number (*z L -fL7o) <br />Signature: <br />Email Address: z <br />Rev:11119t2015 <br />f\L.o trli,,P v,
The URL can be used to link to this page
Your browser does not support the video tag.