My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2102 N Louise St - Misc. Permit
PBA
>
Building
>
Permits
>
L
>
Louise St
>
2102 N Louise St
>
Misc.
>
2102 N Louise St - Misc. Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2021 11:05:41 AM
Creation date
6/29/2021 8:07:13 AM
Metadata
Fields
Template:
Misc. Permit
Full Address
2102 N Louise St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/0/ fTwc <br />Planning & Buildin g Agency <br />Bu ilding Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M.19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.sa n ta -a n a, org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-o1 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerinq NO to anv of the ouestions , plan check shall be required. <br />Project Address:).t ol Louise 3|'. <br />Contractor Company Name: <br />Contractor License Number: <br />VtJ irt I So lon^' <br />YES - NO,da <br />,ce <br />3{a <br />4ta5da <br />uCu <br />1 1 6 <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that lhe plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Wlll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a Californja <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />enalty of perjury under the laws of the State of Califoi'ola Uar Signature <br />7 <br />8 <br />I <br />tr <br />10 tr <br />I certify und <br />Print Name: <br />Phone Number <br />Email Address <br />tr <br />tr <br />Revr 11/19/2015 <br />5LL ?qL- (L?cs Da <br />- <br /><,,r', k q, d rru.l l 6 t/,v,",f <a <br />te <br />f , LOY^ <br />a that t t ove is true:
The URL can be used to link to this page
Your browser does not support the video tag.