Laserfiche WebLink
6. ldentify the accessibility features and equivalent facilities that !ryltt be brought into compliance with <br />the latest edition of Title 24 as a part of this project and an estimate of the cost of each item: <br />(Documentation may be requied) <br />Accessible Features to be Made Accessible Cost of lmprovement <br />tr Door n Landing ! Stairway/Steps E Ramp $ <br />E Path of travel from accessible parking to the building entrance <br />and area of remodel $ <br />E Path of travel to sanitary facilities / public phone / drinking fountain $ <br />E Path of travel from the public way to the building enkance s <br />c. Sanitary facilities ( Floor no. 1 ) Minor Upgrades $$700 <br />d. Public phone(s)$ <br />e Drinking fountain(s)$ <br />f. Parking $ <br />s <br />i. other:$ <br />S $700Total <br />7. ldentify the accessibility features that W|LL NOT comply if a request for unreasonable hardship is <br />granted. Provide an estimated cost of compliance for each item: (Documentation may be requied) <br />Accessible Features Not to be lmproved Cost of lmprovement <br />a. Not all requirements for an accessible restroom have been provided $ 10,000.00 <br />b. Built up curb ramp from parking stall. Need new inset curb $ 15,000.00 <br />$ <br />$ 25,000.00 <br />8. Petitioner must be the legal property owner or his/her legal representative: <br />Print Name Bryan lVontoya Phone No. 949-251-1710 <br />Address 2070 Business Center Drive, lrvine, CA 92612 <br />Signature B rya n Mo ntoya B:ly',t ;31'l#,?i9ill,i).'J,: o"t" 07 .08.2020 <br />Approved by <br />Rev T/9/2017 <br />FOR AGENCY USE ONLY <br />Date <br />Page 2 ol 2 <br />I <br />a. Entrance: <br />b. Path of Travel: <br />g. Signage & Alarms <br />I <br />c. <br />Total: <br />I certify that the above noted information is true and correct. <br />! Legal Property Owner E ArchitecvEngineer E Contractor E Other: