Laserfiche WebLink
(11 <br />) <br />( <br />N <br />) <br /> <br />A <br />P <br />S <br />y <br />s <br />t <br />e <br />m <br />s <br /> <br />D <br />S <br />3 <br />- <br />L <br />Mi <br />c <br />r <br />o <br />i <br />n <br />v <br />e <br />r <br />t <br />e <br />r <br />( <br />s <br />) <br />: <br />(1 <br />1 <br />) <br />( <br />N <br />) <br /> <br />A <br />P <br />S <br />y <br />s <br />t <br />e <br />m <br />s <br /> <br />D <br />S <br />3 <br />- <br />L <br />Mi <br />c <br />r <br />o <br />i <br />n <br />v <br />e <br />r <br />t <br />e <br />r <br />( <br />s <br />) <br />: <br />(1 <br />1 <br />) <br />( <br />N <br />) <br /> <br />J <br />i <br />n <br />k <br />o <br /> <br />S <br />o <br />l <br />a <br />r <br /> <br />J <br />K <br />M <br />3 <br />9 <br />5 <br />M <br />- <br />7 <br />2 <br />H <br />L <br />- <br />V <br />Mo <br />d <br />u <br />l <br />e <br />: <br />DC <br /> <br />S <br />y <br />s <br />t <br />e <br />m <br /> <br />S <br />i <br />z <br />e <br />: <br /> <br />Designed For: <br />AC <br /> <br />S <br />y <br />s <br />t <br />e <br />m <br /> <br />S <br />i <br />z <br />e <br />: <br />Ro <br />s <br />a <br />l <br />e <br />s <br /> R <br />e <br />s <br />i <br />d <br />e <br />n <br />c <br />e <br /> <br />10 <br />1 <br />2 <br /> <br />N <br /> <br />K <br />i <br />n <br />g <br /> <br />S <br />t <br /> <br />(E <br />) <br />4 <br />. <br />7 <br />4 <br /> <br />k <br />W <br /> <br />+ <br /> <br />( <br />N <br />) <br /> <br />4 <br />. <br />3 <br />5 <br /> <br />k <br />W <br /> <br />8. <br />4 <br />5 <br /> <br />k <br />W <br />Sa <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />6 <br /> <br />Signature: <br />Scale: <br />TM <br />PR-6095 <br />12/13/2024 <br />Project ID: <br />Date: <br />Designer: Skyfire Solar Design <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />S <br />DA <br />T <br />E <br /> <br />DI <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br /> <br />1/ <br />1 <br />6 <br />/ <br />2 <br />4 <br /> <br />RE <br />V <br />Se <br />e <br /> <br />S <br />O <br />W <br /> <br />P <br />V <br /> <br />1 <br /> <br />A <br />1/ <br />1 <br />6 <br />/ <br />2 <br />4 <br /> <br />La <br />b <br />e <br />l <br />e <br />d <br /> <br />M <br />a <br />i <br />n <br /> <br />H <br />o <br />u <br />s <br />e <br /> <br />P <br />V <br /> <br />2 <br /> <br />B <br />(N) APSystems DS3-L11 <br />MICROINVERTER <br />11 (N) Jinko Solar JKM395M-72HL-V <br />QTY SOLAR PANEL <br />12 (E) Jinko Solar JKM395M-72HL-V <br />PV 1 COVER SHEET <br />PV 2 SITE PLAN <br />PV 3 PV LAYOUT <br />PV 4 DETAILS & UPLIFT CALCULATIONS <br />PV 5 ONE LINE DIAGRAM <br />PV 5.1 THREE LINE DIAGRAM <br />PV 6 LABELS <br />PV 7 DIRECTORY <br />CS CUT SHEETS <br />EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH <br />THE 2022 CEC, 2022 CRC, 2022 CBC, 2022 CFC, 2022, <br />CALGreen Code, 2022 CES, AND ALL OTHER APPLICABLE <br />REQUIREMENTS OF: <br />JURISDICTION: <br />UTILITY: <br />OCCUPANCY CLASSIFICATION: R3 <br />CONSTRUCTION TYPE: 5B <br />EXISTING BUILDING SQ FT: 3145' <br />TOTAL SOLAR ARRAY SQ FT: 238' <br />CONTAINS FIRE SPRINKLERS: NO <br />NUMBER OF STORIES: 2 <br />1. ALL ELECTRICAL EQUIPMENT THAT IS ENTERED INTO <br />FOR NEW CIRCUITS OR RECONFIGURATION OF <br />CIRCUITRY SHALL BE BROUGHT TO MEET CURRENT <br />CODE REQUIREMENTS. “EXISTING” SHALL BE <br />INTERPRETED AS NOT BEING AFFECTED BY THE WORK <br />WITHIN THE SCOPE OF THIS PERMIT, AN ELECTRICAL <br />PLAN APPROVAL DOES NOT WAIVE ANY REQUIREMENTS <br />OF THE 2022 CEC OR CENC. <br />2. SECTION 705.6 ALL EQUIPMENT SHALL BE APPROVED <br />FOR THE INTENDED USE AND SPECIFICALLY REQUIRES <br />UTILITY-INTERACTIVE INVERTERS USED FOR <br />INTERCONNECTION SYSTEMS BE LISTED AND IDENTIFIED <br />FOR INTERCONNECTION SERVICE. <br />3. A PERMANENT PLAQUE/DIRECTORY DENOTING THE <br />LOCATION OF ALL ELECTRIC POWER SOURCE <br />DISCONNECTING MEANS ON OR IN THE PREMISES SHALL <br />BE INSTALLED AT EACH SERVICE EQUIPMENT LOCATION <br />AND AT THE LOCATION(S) OF THE SYSTEM <br />DISCONNECT(S) FOR ALL ELECTRIC POWER <br />PRODUCTION SOURCES CAPABLE OF BEING <br />INTERCONNECTED. <br />4. THE OUTPUT OF AN INTERCONNECTED ELECTRIC <br />POWER SOURCE SHALL BE CONNECTED AS SPECIFIED IN <br />705.12(A) or (B) <br />5. THE INSTALLATION OF EQUIPMENT AND ALL <br />ASSOCIATED WIRING AND INTERCONNECTIONS SHALL BE <br />PERFORMED ONLY BY QUALIFIED PERSONS. <br />6. ELECTRICAL CONNECTIONS SHALL BE MADE IN <br />ACCORDANCE WITH CEC 110.14 <br />7. PHOTOVOLTAIC SOURCE CIRCUITS. THE <br />REQUIREMENTS OF ARTICLE 690 PERTAINING TO <br />PHOTOVOLTAIC SOURCE CIRCUITS SHALL NOT APPLY TO <br />AC MODULES. THE PHOTOVOLTAIC SOURCE CIRCUIT, <br />CONDUCTORS, AND INVERTERS SHALL BE CONSIDERED <br />AS INTERNAL WIRING OF AN AC MODULE. <br />8. PHOTOVOLTAIC SOURCE CIRCUIT, PHOTOVOLTAIC <br />OUTPUT CIRCUIT, INVERTER OUTPUT CIRCUIT, AND <br />STORAGE BATTERY CIRCUIT CONDUCTORS AND <br />EQUIPMENT SHALL BE PROTECTED IN ACCORDANCE <br />WITH THE REQUIREMENTS OF ARTICLE 240. <br />9. PV SYSTEM CIRCUITS INSTALLED ON OR IN <br />BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN <br />FUNCTION TO REDUCE SHOCK HAZARD FOR <br />EMERGENCY RESPONDERS IN ACCORDANCE WITH <br />690.12 <br />10. ALL METALLIC RACEWAYS, J-BOXES, SUPPORTS AND <br />MODULES ARE PROPERLY GROUNDED. MODULES <br />SHALL BE GROUNDED SEPARATELY TO ALLOW REMOVAL <br />OF A SINGLE MODULE AND WITHOUT DISRUPTING THE <br />GROUNDING OF OTHER MODULES BY MEANS OF <br />PROPERLY INSTALLED WIRES, LUGS, SCREWS, BOLTS <br />OR OTHER LISTED METHODS. (SHEET METAL SCREWS <br />ARE NOT ALLOWED – 250.8). 2022 CEC 690.43 <br />11. SMOKE ALARMS AND CARBON MONOXIDE ALARMS TO <br />BE PROVIDED AND RETROFITTED INTO THE EXISTING <br />DWELLING. THESE SMOKE ALARMS ARE REQUIRED TO BE <br />IN ALL BEDROOMS, OUTSIDE EACH BEDROOM, AND AT <br />LEAST ONE ON EACH FLOOR OF THE HOUSE. THESE <br />ALARMS MAY BE SOLELY BATTERY OPERATED IF THE <br />PHOTOVOLTAIC PROJECT DOES NOT INVOLVE THE <br />REMOVAL OF INTERIOR WALL AND CEILING FINISHES <br />INSIDE THE HOME, OTHERWISE, THE ALARMS MUST BE <br />HARD WIRED AND INTERCONNECTED. MUST BE IN <br />COMPLIANCE WITH R314-COMBINATION; R315.2-LISTING; <br />R315.2.1-EXISTING; R315.3-LOCATION; R315.7- <br />INTERCONNECTION. <br />12.GROUNDING ELECTRODE CONDUCTOR SHALL BE <br />SIZED PER CEC 250.66. <br />Santa Ana <br />Southern California Edison Co <br />125A BUS(N) <br />100A MAIN BREAKER(N) <br />SUB PANEL B <br />50A 2 POLE PV BREAKER IN SUB PANEL B <br />100A BUS(E) <br />MAIN PANEL A <br />100A MAIN BREAKER(E) <br />POINT OF INTERCONNECTION <br />(N) <br />(N) 60A AC DISCONNECT <br />BALANCE OF SYSTEM <br />1 <br />(N) 100A SOLAR ONLY LOAD CENTER1 <br />ATTACHMENT: K2 Tile Hook <br />MOUNTING HARDWARE, ROOFING, AND FRAMING <br />RAIL: K2 44-X <br />STRUCTURAL <br />ROOFING: Clay Tile <br />FRAMING: 2X4 TRUSS @ 24" O.C. <br />ADDITIONAL MOUNTING HARDWARE, ROOFING, AND FRAMING <br />RAIL: K2 44-X <br />ROOFING: Mod Bit <br />FRAMING: 2X4 TRUSS @ 24" O.C. <br />ATTACHMENT: K2 Big Foot X (ChemLink) <br />VICINITY MAP <br />PAGE INDEX <br />SCOPE OF WORK <br />GENERAL NOTES <br />NTS <br />CO <br />V <br />E <br />R <br /> <br />P <br />A <br />G <br />E <br /> <br />PV 1 <br />STRUCTURAL ONLY <br />01/16/2025 <br />Bldg #: 101122236 <br />Elect#: 20184915 <br />The scope of the plans is for the installation of the solar photovoltaic <br />system only and the approval is subject to compliance with all <br />applicable city and state codes and regulations regarding <br />construction. The approval of the plans does not constitute any <br />certification of the accuracy, completeness, or building permit status <br />of the existing buildings and structures as shown. <br />1012 N King St <br />1/23/2025