My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
106 E 4th St - Plan
PBA
>
Building
>
ProjectDox
>
F
>
Fourth St
>
106 E Fourth St
>
106 E 4th St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 11:53:51 AM
Creation date
6/1/2025 11:53:45 AM
Metadata
Fields
Template:
Plan
Permit Number
20180879
101116506
Full Address
106 E Fourth St
Document Relationships
101116506 - Permit
(Permit - Plan)
Path:
\Building\Permits\F\Fourth St\106 E Fourth St
20180879 - Permit
(Permit - Plan)
Path:
\Building\Permits\F\Fourth St\106 E Fourth St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Structural Calculations for a Roof Mounted Solar Photovoltaic System for: <br />George Hansen <br />106 E 4th St <br />Santa Ana, CA 92701 <br />Applicable Codes: <br />2022 California Building Code, 2022 California Electric Code, <br />2022 California Mechanical Code, American Society of Civil Engineers <br />Standard ASCE 7-16 Minimum Design Loads for Buildings and Other <br />Structures, American Wood Council 2018 National Design Specification <br />for Wood Construction, Local Municipal Code, and all other codes which <br />are adopted by reference or enacted by law. <br />Assumed Design Parameters: <br />The existing structure has been built under a building permit and is in its <br />original condition. The existing roof structure is capable of its code <br />required live load and the ability of the roof structure to support live loads <br />has not been substantially reduced by the age of the structure, termites or <br />mold, or unauthorized modifications to the existing structure. Solar Energy <br />Contractor shall make an inspection of the existing roof framing system <br />prior to installation of the roof mounted solar energy system to verify that <br />the existing roof is capable of supporting minimum roof live loads. <br />Assumed Design Parameters: <br />All 2x members are grade Douglas Fir #2 or better <br />All 4X members are grade Douglas Fir #1 or better <br />All Roof Connectors are Simpson Strong-Tie or Equal <br />All Concrete Foundations are f'c = 2500 psi or stronger <br />Sht # 1 of 7 <br />2023-4620 Effect Energy George Hansen August 24, 2023 <br /> Loyd W. Martin Professional Engineer, Inc. <br />9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 <br /> Email: loydwmartin@gmail.com www.loydwmartin.com <br />Original Structure was built to the Type-V Wood Framed Standards of the <br />Applicable Building Code at the time of Construction. <br />106 E 4th St - 101116506 <br />& 2018087910/10/2023
The URL can be used to link to this page
Your browser does not support the video tag.