My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1025 N Mirasol St - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Mirasol St
>
1025 N Mirasol St
>
1025 N Mirasol St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 11:53:59 AM
Creation date
6/1/2025 11:53:51 AM
Metadata
Fields
Template:
Plan
Permit Number
20178523
101113588
Full Address
1025 N Mirasol St
Document Relationships
101113588 - Permit
(Permit - Plan)
Path:
\Building\Permits\M\Mirasol St\1025 N Mirasol St
20178523 - Permit
(Permit - Plan)
Path:
\Building\Permits\M\Mirasol St\1025 N Mirasol St
Text box
ID:
1
Creator:
Import Agent
Created:
6/1/2025 11:53 AM
Modified:
5/30/2025 11:35 AM
Text:
http://www.pzse.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sunergy, Inc <br />1 Gamella Street <br />Rancho Mission Viejo, CA, 92694 <br />Subject: Structural Certification for Installation of Solar Panels <br />Job Number: 2022-16827 <br />Client: Adrian Vega - 010003 <br />Address: 1025 Mirasol Street, Santa Ana, CA 92701 <br />Attn.: To Whom It May Concern <br />Design Criteria: <br />● <br />● Ground Snow Load = 0 psf; Roof Snow Load = 0 psf ARRAY 1 <br />● Basic Wind Speed = 110 mph Exposure Category C <br />● Existing Roof Dead Load: ARRAY 1 = 10 psf <br />● Existing Roof Live Load: 20 psf <br />PV System Assembly <br />Installation Requirements <br />Prepared By: <br />PZSE, Inc. - Structural Engineers <br />Roseville, CA <br />If you have any questions on the above, do not hesitate to call. <br />December 20, 2022 <br />PZSE’s scope of work is limited to performing a structural evaluation of loading at the address above. After review, PZSE certifies <br />that the alteration to the existing structure by installation of the PV system meets the requirements of the applicable codes and <br />criteria shown below: <br />The existing structure is adequate to support the PV alteration per 2019 CEBC §502.4 & 503.3 & 502.5 & 503.4. <br /> The PV module assembly including all structural supporting components shall be installed in accordance with the manufacturers <br />specifications and meet or exceed all requirements set forth by the referenced codes above. <br />The PV system shall be mounted flush to the existing roof surface. The contractor shall notify PZSE of any signs of damage to the <br />roof framing prior to commencing the installation. PZSE shall then determine if the existing roof is adequate to support the <br />applied loads. The electrical engineering and system waterproofing shall be addressed by others. <br />Applicable Codes = 2019 CBC, ASCE 7-16, and NDS-18 <br />1025 Mirasol Street <br />Santa Ana, CA 92701 <br />1478 Stone Point Drive, Suite 190, Roseville, CA 95661 <br />T 916.961.3960 F 916.961.3965 W www.pzse.com <br />Experience | Integrity | Empowerment <br />Paul Zacher <br />Digitally signed by Paul Zacher <br />DN: CN=Paul Zacher, <br />O=Structural Engineers, <br />L=Roseville, S=California, C=US <br />Reason: I am the author of this <br />document <br />Date: 2022.12.20 15:39:38-08'00' <br />1025 N Mirasol St <br />01/27/23
The URL can be used to link to this page
Your browser does not support the video tag.