Laserfiche WebLink
8" THK MAT SLAB ON GRADE <br />W/ #5 @ 12" O.C. E.W. <br />OVER 15 MIL VAPOR BARRIER <br />OVER COMPACT FILL <br />12 <br />" <br />TY <br />P <br />3 <br />- <br />TYP @ <br />COLUMNS <br />6" <br />6" <br />18" <br />6" <br />6" <br />6" <br />6" <br />6" <br />6" <br />18" <br />6" <br />TYP <br />6" <br />18 <br />" <br />TY <br />P <br />18 <br />" <br />TY <br />P <br />18" <br />6" <br />6" <br />6" <br />6" <br />18" <br />18 <br />" <br />18" <br />COLUMNS & A.B. <br />PER MFR <br />2 <br />-TYP <br />18 <br />" <br />18" <br />SCALE: 1/4" = 1'-0" <br />FOUNDATION PLAN1 <br />SCALE: NTS <br />TYPICAL FOUNDATION DETAIL AT FRAME ANCHORAGE 3 <br />SCALE: NTS <br />TYPICAL FOUNDATION DETAIL 2 <br />SLAB ON GRADE <br />PER PLAN <br />1 <br />1 <br />/ <br />2 <br />" <br />CL <br />R <br />FLOOR FINISH <br />PER ARCHT'L <br />0" <br /> <br />M <br />I <br />N <br />8" <br /> <br />M <br />A <br />X <br />3" <br /> <br />C <br />L <br />R <br />TY <br />P <br />12" TYP <br />18 <br />" <br /> <br />M <br />I <br />N <br />T.O. SLAB <br />EXTERIOR WALL <br />PER MFR <br />SLAB ON GRADE <br />PER PLAN <br />1 <br />1 <br />/ <br />2 <br />" <br />CL <br />R <br />FLOOR FINISH <br />PER ARCHT'L <br />0" <br /> <br />M <br />I <br />N <br />8" <br /> <br />M <br />A <br />X <br />3" <br /> <br />C <br />L <br />R <br />TY <br />P <br />18" <br />18 <br />" <br /> <br />M <br />I <br />N <br />T.O. SLAB <br />EXTERIOR WALL <br />PER MFR <br />6" <br />MIN <br />6" <br />MIN <br />COL W/ BASE PL <br />PER MFR <br />ANCHOR BOLT PER MFR <br />EDGE OF FTG <br />PER <br />DET <br />2 <br />- <br />MAT SLAB THICKNESS <br />PER PLAN <br />(2) #5 CONT T & B <br />#4 @ 12" O.C. <br />EDGE OF FTG <br />PER <br />DET <br />2 <br />- <br />(2) #5 ADDT'L <br />W/ STD HOOK ENDS @ COLUMNS <br />#4 @ 12" O.C. <br />@ COLUMNS <br />5/8" DIA <br />HEAVY HEX HEAD W/ 9" EMBED <br />BASE PL PER MANUFACTURER ON RHINO <br />SHEET F1 OF 2 <br />AND MANUFACTURER TO <br />VERIFY/PROVIDE ANCHOR BOLT LAYOUT <br />file name: <br />drawn by:checked by: <br />drawing no.: <br />ar <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />u <br />r <br />e <br />pl <br />a <br />n <br />n <br />i <br />n <br />g <br />in <br />t <br />e <br />r <br />i <br />o <br />r <br />s <br />tB <br />P <br />/ <br />A <br />r <br />c <br />h <br />i <br />t <br />e <br />c <br />t <br />u <br />r <br />e <br />46 <br />1 <br />1 <br /> <br />T <br />e <br />l <br />l <br />e <br />r <br /> <br />A <br />v <br />e <br />n <br />u <br />e <br />Ne <br />w <br />p <br />o <br />r <br />t <br /> <br />B <br />e <br />a <br />c <br />h <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />6 <br />6 <br />0 <br />ph <br />: <br /> <br />9 <br />4 <br />9 <br />. <br />6 <br />7 <br />3 <br />. <br />0 <br />3 <br />0 <br />0 <br />consultant <br />agency <br />owner <br />date: <br />drawing title: <br />description:date:Rev: <br />tBP project number : <br />architect <br />THIS DRAWING AND THE DESIGNS, DEPICTIONS, IDEAS AND OTHER INFORMATION <br />CONTAINED HEREIN CONSTITUTE UNPUBLISHED WORK OF tBP/ARCHITECTURE AND <br />SHALL REMAIN THE PROPERTY OF tBP/ARCHITECTURE IN PERPETUITY. NO PART <br />THEREOF SHALL BE REPRODUCED, DISCLOSED, DISTRIBUTED, SOLD, PUBLISHED OR <br />OTHERWISE USED IN ANY WAY WITHOUT THE ADVANCED EXPRESS WRITTEN CONSENT <br />OF tBP/ARCHITECTURE. <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />L <br />I <br />F <br />O <br />R <br />N <br />I <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />7 <br />12 <br />0 <br />2 <br /> <br />W <br /> <br />E <br />D <br />I <br />N <br />G <br />E <br />R <br /> <br />A <br />V <br />E <br />MA <br />T <br />E <br />R <br /> <br />D <br />E <br />I <br /> <br />H <br />I <br />G <br />H <br /> <br />S <br />C <br />H <br />O <br />O <br />L <br />21125.00 <br />XX/XX/2023 <br />ph: 714.667.2700 <br />SANTA ANA, CA 92701 <br />20 CIVIC CENTER PLAZA <br />SANTA ANA PLANNING AND BUILDING AGENCY <br /># <br />DA <br />N <br />C <br />E <br /> <br />S <br />T <br />U <br />D <br />I <br />O <br />E N G I N E E R S I N C <br />2151 Michelson Dr. #240 <br />Irvine, CA 92612 <br />Tel. 949.679.0870 <br />Fax. 949.679.9370 <br />Project No.: J898 <br />V C A <br />C I V I LQuality <br />Service <br />Commitment <br />S T R U C T U R A L DBEMBE SBE <br />GENERAL NOTES, <br />PLAN AND DETAILS <br />S-1 <br />1.DETAILS OF CONSTRUCTION NOT SHOWN SHALL BE OF SAME NATURE AS <br />THOSE SHOWN FOR SIMILAR CONDITIONS. REFER TO THE TYPICAL DETAIL <br />SHEETS FOR TYPICAL DETAILS OF CONSTRUCTION. TYPICAL DETAILS APPLY TO <br />ALL CONSTRUCTION UNLESS SPECIFICALLY NOTED OR SHOWN OTHERWISE. <br />WHERE CONDITIONS REQUIRE MODIFICATIONS OF A TYPICAL DETAIL, THE <br />CONTRACTOR SHALL SUBMIT MODIFIED DETAIL FOR APPROVAL BY THE <br />ENGINEER OF RECORD PRIOR TO FABRICATION AND INSTALLATION. DETAILS <br />OF CONSTRUCTION NOT SHOWN SHALL BE OF SAME NATURE AS THOSE SHOWN <br />FOR SIMILAR CONSTRUCTION. <br />2.CONTRACTOR SHALL CONSIDER THE PROJECT SPECIFICATIONS A PART OF THE <br />CONTRACT DOCUMENTS. WHERE INFORMATION IS CONFLICTING, SPECIFIC <br />DETAILS SHALL GOVERN OVER TYPICAL DETAILS WHICH SHALL GOVERN OVER <br />THESE NOTES WHICH SHALL GOVERN OVER SPECIFICATIONS. <br />3.ALL DIMENSIONS ON STRUCTURAL DRAWINGS SHALL BE CHECKED AGAINST <br />ARCHITECTURAL DIMENSIONS. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE <br />OMITTED OR NOT CLEAR, CONTACT THE ARCHITECT (ARCH) OR STRUCTURAL <br />ENGINEER OF RECORD (SEOR). ALL DIMENSIONS RELATED TO EXISTING <br />CONDITIONS SHALL BE FIELD VERIFIED BY THE CONTRACTOR. DIMENSIONS <br />ARE TO THE FACE OF STUDS, AND TO CENTERLINE OF COLUMNS UNO. <br />4.IT IS THE CONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY NOTIFY THE SEOR <br />OF ANY CONFLICTS BETWEEN THE STRUCTURAL DRAWINGS AND OTHER <br />DRAWINGS; OR EXISTING CONDITIONS NOT SHOWN OR DIFFERENT FROM <br />THOSE SHOWN ON DRAWINGS PRIOR TO COMMENCEMENT OF WORK. THE <br />CONTRACTOR IS NOT TO ORDER MATERIAL OR CONSTRUCT ANY PORTION OF <br />THE BUILDING THAT IS IN CONFLICT UNTIL THE CONFLICT IS RESOLVED WITH <br />THE AFFECTED PARTIES. <br />5.THE STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED <br />STRUCTURE. UNLESS OTHERWISE SHOWN THEY DO NOT INDICATE METHOD OF <br />CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURES <br />NECESSARY TO PROTECT THE CONSTRUCTION AND ALL ADJACENT <br />PROPERTIES DURING CONSTRUCTION. SUCH MEASURES SHALL INCLUDE BUT <br />ARE NOT LIMITED TO BRACING, SHORING OF LOADS DUE TO CONSTRUCTION <br />EQUIPMENT, ETC. OBSERVATION VISITS TO THE SITE BY THE ARCHITECT OR <br />SEOR SHALL NOT INCLUDE OBSERVATION OF THE ABOVE ITEMS. <br />6.SUBSTITUTION REQUESTS FOR MATERIALS SPECIFIED ON THE STRUCTURAL <br />DRAWINGS MAY BE CONSIDERED WITH MATERIALS HAVING EQUIVALENT OR <br />GREATER CAPACITY AND PERFORMANCE. CURRENT EVALUATION REPORTS <br />AND PRODUCT INFORMATION SHALL BE PROVIDED TO THE STRUCTURAL <br />ENGINEER DEMONSTRATING THE REQUIRED CAPACITY AND PERFORMANCE OF <br />THE MATERIAL TO BE SUBSTITUTED. WRITTEN APPROVAL FROM THE SEOR <br />SHALL BE OBTAINED PRIOR TO THE SUBSTITUTION OF ANY MATERIAL <br />SPECIFIED ON THE STRUCTURAL DOCUMENTS. <br />7.IT IS THE CONTRACTOR'S RESPONSIBILITY TO COMPLY WITH THE PERTINENT <br />SECTIONS OF THE "CONSTRUCTION SAFETY ORDERS" ISSUED BY THE STATE OF <br />CALIFORNIA, LATEST EDITION, AND ALL OSHA REQUIREMENTS AS THEY APPLY <br />TO THIS PROJECT. THE ARCHITECT, SEOR, AND THE OWNER DO NOT ACCEPT <br />ANY RESPONSIBILITY FOR THE CONTRACTOR'S FAILURE TO COMPLY WITH <br />THESE REQUIREMENTS. <br />8.ALL WORK IS NEW (N) UNLESS INDICATED AS EXISTING (E). <br />9.CONSTRUCTION MATERIALS SHALL BE DISTRIBUTED WHEN PLACED ON THE <br />STRUCTURE SUCH THAT LOADS DO NOT EXCEED DESIGN LIVE LOADS OR <br />RESULT IN AN UNBALANCED CONDITION. <br />GENERAL NOTES: <br />1.CODES: <br />ALL WORK SHALL BE IN CONFORMANCE WITH THE CALIFORNIA <br /> BUILDING CODE (CBC) 2022 EDITION, INCLUDING ALL AMENDMENTS. <br /> ALL STANDARDS USED SHALL BE THE LATEST VERSION APPROVED <br />BY THE CODE ENFORCEMENT AGENCY ON THE DATE OF THE PERMIT <br />ISSUANCE UNLESS SPECIFICALLY NOTED OTHERWISE. <br />2.DESIGN LIVE LOAD <br />3.WIND DESIGN INFORMATION <br />4.SEISMIC DESIGN INFORMATION <br />STRUCTURAL DESIGN CRITERIA: <br />RISK CATEGORY = II Kz = 0.96 Kd =0.85 Kzt = 1.0 <br />BASIC WIND SPEED V = 95 MPH (3 SEC GUST)EXPOSURE = C <br />INTERNAL PRESSURE COEFF. = +/- 0.18 <br />I = 1.0 RISK CATEGORY = II SITE CLASS = D <br />SS = 1.29 S1 = 0.46 SDS = 0.86 SD1 = 0.56 <br />SEISMIC DESIGN CATEGORY = D <br />LOAD <br />ROOF 20 PSF <br />1.REINFORCING GRADES FOR CONCRETE OR MASONRY: <br />2.MAINTAIN MINIMUM CONCRETE COVER FROM FACE OF CONCRETE TO EDGE OF <br />ALL REINFORCEMENT AS FOLLOWS (U.N.O.): <br />(SEE PLAN/ SECTION FOR CONCRETE W/ FIRE RATING.) <br />PROVIDE THE LARGEST COVER REQUIRED FOR ALL APPLICABLE CONDITIONS. <br />WHERE #3 STIRRUPS OR TIES ARE USED, ENSURE THAT THE COVER FOR <br />LONGITUDINAL BARS IS ADEQUATE. <br />3.REINFORCEMENT SHALL BE PLACED IN ACCORDANCE WITH THE CONCRETE <br />REINFORCING STEEL INSTITUTE (CRSI) "MANUAL OF STANDARD PRACTICE". <br />EACH REINFORCING BAR SHALL BE WIRED TO A CROSS BAR AT A MAXIMUM <br />SPACING OF 24" O.C. PROVIDE ALL ACCESSORIES NECESSARY TO SUPPORT <br />REINFORCING IN POSITIONS SHOWN ON THE PLANS. <br />4.SPLICES IN CONTINUOUS REINFORCEMENT AS USED IN WALLS, FOOTINGS, <br />SLABS, ETC., SHALL HAVE A CLASS "B" LAP (1' - 6" MIN) AND THE SPLICES IN <br />ADJACENT BARS SHALL BE NOT LESS THAN 5' - 0" APART. BARS MAY BE WIRED <br />TOGETHER AT SPLICES OR LAPS EXCEPT FOR TOP REINFORCING OF BEAMS <br />AND SLABS OR WHERE SPECIFICALLY DETAILED TO BE SEPARATED. <br />5.ALL DOWELS, ANCHOR BOLTS AND OTHER HARDWARE TO BE SET IN <br />CONCRETE SHALL BE TIED IN PLACE PRIOR TO PLACEMENT OF CONCRETE. NO <br />WET SETTING, STABBING, RODDING OR OTHER MOVEMENT OF EMBEDDED <br />ITEMS SHALL BE PERFORMED DURING PLACEMENT OF CONCRETE. <br />6.BEND REINFORCING BARS COLD. <br />7.STEEL SHALL BE KEPT CLEAN AND FREE OF RUST. <br />8.DOWELS BETWEEN FOOTING AND WALLS OR COLUMNS SHALL BE THE SAME <br />GRADE, SIZE AND SPACING AS THE MAIN REINFORCING U.N.O. <br />9.ALL BARS SHALL BE MARKED SO THEIR IDENTIFICATION CAN BE MADE WHEN <br />THE FINAL IN PLACE INSPECTION IS MADE. <br />10.CHAIRS OR SPACERS FOR REINFORCING SHALL BE NON-FERROUS OR PLASTIC <br />COATED WHEN RESTING ON EXPOSED SURFACES. <br />REINFORCING STEEL NOTES: <br />ALL BARS EXCEPT THOSE TO BE WELDED <br />ALL BARS TO BE WELDED <br />ASTM A615, GRADE 60 <br />ASTM A706, GRADE 60 <br />CONDITION <br />CONCRETE POURED AGAINST EARTH <br />CONCRETE POURED IN FORMS AND <br />EXPOSED TO WEATHER OR EARTH <br />-#6 BARS AND LARGER <br />-#5 BARS AND SMALLER <br />STRUCTURAL SLABS ON GRADE <br />-FROM BOTTOM OF SLAB <br />-FROM TOP OF SLAB <br />OTHER CONCRETE NOT EXPOSED TO WEATHER OR <br />EARTH FOR #11 BARS AND SMALLER <br />COVER <br />3" <br />2" <br />1 1/2" <br />1" <br />2" <br />1 1/2" <br />1.SEE SOIL REPORT BY: <br />REPORT NO.: DATED: <br />SOILS REPORT SHALL BE CONSIDER A PART OF THESE CONSTRUCTION <br />DOCUMENTS. <br />2. <br />3.THE CONTRACTOR SHALL CONFORM TO ALL RECOMMENDATIONS AND <br />CONDITIONS INDICATED IN THE SOIL REPORT. THE GEOTECHNICAL ENGINEER <br />SHALL OBSERVE ALL FOOTING EXCAVATIONS PRIOR TO PLACING CONCRETE. <br />4.SUBSURFACE SOIL PREPARATION: <br />A. ALL EXISTING UNDOCUMENTED FILL SHALL BE REMOVED AND <br /> RECOMPACTED. ALL TOPSOILS SHALL BE REMOVED AS REQUIRED BY <br /> THE GEOTECHNICAL ENGINEER. <br />B. GEOTECHNICAL ENGINEER SHALL BE RETAINED DURING THE <br /> OVEREXCAVATION PROCESS. THE ACTUAL DEPTH OF REMOVAL WILL BE <br /> DETERMINED DURING GRADING OPERATIONS. <br />C. OFFSITE FILL MATERIAL SHALL BE APPROVED BY THE GEOTECHNICAL <br /> ENGINEER PRIOR TO PLACEMENT. <br />5.SPREAD FOOTINGS ARE CENTERED UNDER WALLS AND COLUMNS, UNO. <br />6.FOOTING ELEVATIONS ARE NOTED ON THE PLANS AND DETAILS . IN ANY CASE, <br />FOOTINGS SHALL BEAR ON FIRM UNDISTURBED SOIL OR ENGINEERED FILL <br />OR BEDROCK , IN ACCORDANCE WITH THE SOIL REPORT AND DETAILS SHOWN. <br />7.CONTRACTOR SHALL PROTECT ALL UTILITY LINES, ETC. ENCOUNTERED DURING <br />EXCAVATION AND BACKFILLING. <br />8.FOOTING BACKFILL AND UTILITY TRENCH BACKFILL WITHIN BUILDING AREA <br />SHALL BE MECHANICALLY COMPACTED IN LAYERS WITH THE APPROVAL OF THE <br />GEOTECHNICAL ENGINEER. FLOODING IS NOT PERMITTED. <br />9.ALL TRENCHES SHALL COMPLY WITH APPLICABLE OSHA REQUIREMENTS. <br />10.ALL EXCAVATIONS SHALL BE PROPERLY BACKFILLED WITH NON-EXPANSIVE <br />SOIL BUT NOT BEHIND RETAINING WALLS BEFORE CONCRETE OR MASONRY <br />ATTAINS ITS FULL DESIGN STRENGTH. <br />11.SEE ARCHITECT'S PLANS FOR LOCATIONS OF SLAB SLOPES, DEPRESSIONS, <br />CURBS, DRAINS, NON-STRUCTURAL PARTITIONS AND OTHER EMBEDDED ITEMS <br />NOT SHOWN ON THE STRUCTURAL PLANS. <br />12.ALL GRADING, FOUNDATION FOOTINGS, AND DRAINAGE PLANS SHALL BE <br />REVIEWED BY THE GEOTECHNICAL ENGINEER UPON SUBMITTAL. A CERTIFIED <br />LETTER BY THE GEOTECHNICAL ENGINEER IS REQUESTED STATING THAT THE <br />RECOMMENDATIONS CONTAINED WITHIN THE SOILS REPORT HAVE BEEN <br />INCORPORATED INTO THE PROJECT PLANS AND SPECIFICATIONS PRIOR TO <br />CONSTRUCTION. <br />FOUNDATION AND SLAB ON GRADE NOTES: <br />ALLOWABLE FTG VERTICAL BEARING PRESSURE <br />DEAD LOAD + LIVE LOAD = ......................................................................1500 PSF <br />DEAD LOAD + LIVE LOAD + LATERAL LOAD = .......................................2000 PSF <br />ALLOWABLE FTG LATERAL BEARING PRESSURE IS 250 PSF PER FT OF DEPTH <br />ALLOWABLE FTG COEFFICIENT OF FRICTION FOR SLIDING: 0.30 <br />GPI GEOTECHNICAL PROFESSIONAL INC <br />3204.I 10/20/2023 <br />1.CONCRETE SHALL BE MIXED, PLACED AND CURED IN ACCORDANCE WITH ACI <br />318, 2019 EDITION, AND PROJECT SPECIFICATIONS. <br />2.CONCRETE SHALL NOT BE DROPPED THROUGH REINFORCING STEEL (AS IN <br />WALLS) SO AS TO CAUSE SEGREGATION OF AGGREGATES. IN SUCH CASES, <br />HOPPERS AND VERTICAL CHUTES OR TRUNKS SHALL BE USED. CHUTES OR <br />TRUNKS SHALL BE OF VARIABLE LENGTHS SO THAT FREE UNCONFINED FALL <br />OF CONCRETE SHALL NOT EXCEED SIX FEET. A SUFFICIENT NUMBER OF <br />CHUTES OR TRUNKS SHALL BE USED TO ENSURE THE CONCRETE IS KEPT <br />LEVEL AT ALL TIMES. <br />3.CONSTRUCTION JOINTS SHALL BE CLEANED AND ROUGHENED BY REMOVING <br />THE ENTIRE SURFACE TO EXPOSE CLEAN AGGREGATE SOLIDLY EMBEDDED IN <br />THE MORTAR MATRIX. SLUSH WITH A COAT OF NEAT CEMENT BEFORE <br />PLACING CONCRETE. SEE PLANS AND DETAILS FOR LOCATION AND TYPE OF <br />CONSTRUCTION JOINT. LOCATIONS OF ADDITIONAL CONSTRUCTION JOINTS <br />NOT SHOWN ON THESE PLANS SHALL BE SUBMITTED FOR APPROVAL BY THE <br />EOR PRIOR TO PLACING ANY CONCRETE. <br />4.STRUCTURAL CONCRETE SHALL MEET THE FOLLOWING DESIGN CRITERIA: <br />a.MAXIMUM DRY WEIGHT OF LIGHTWEIGHT CONCRETE SHALL BE <br /> 110 PCF . <br />b.SLUMP MEASURED PRIOR TO SUPERPLASTICIZER, WHERE OCCURS. <br />5.CONCRETE MIX DESIGN AND TESTING SHALL MEET THE REQUIREMENTS OF <br />THE BUILDING CODE, AND SPECIFICATIONS. ALL CONCRETE MIXES SHALL BE <br />DESIGNED BY A RECOGNIZED TESTING LAB STAMPED AND SEALED BY A <br />LICENSED CALIFORNIA CIVIL ENGINEER AND SUBMITTED TO THE SEOR FOR <br />REVIEW PRIOR TO CONCRETE PLACEMENT. STRUCTURAL CONCRETE MIXES <br />SHALL CONSIST OF 5 SACK MINIMUM U.N.O. <br />6.AGGREGATES IN NORMAL WEIGHT CONCRETE SHALL CONFORM TO ASTM C-33 <br />(HARDROCK). <br />7.COMPRESSIVE STRENGTH TEST REPORTS SHALL BE SUBMITTED TO THE <br />BUILDING DEPARTMENT AND THE SEOR. <br />8.PORTLAND CEMENT SHALL BE AS NOTED ABOVE FOR ALL CONCRETE <br />CONFORMING TO ASTM C150, LOW ALKALI. MILL TESTS WITH CERTIFICATES OF <br />COMPLIANCE SHALL BE SUBMITTED. <br />9.FLY ASH OR OTHER POZZOLANS CONFORMING TO ASTM C618 CLASS N OR F <br />MAY BE USED AS A PARTIAL SUBSTITUTION FOR PORTLAND CEMENT UP TO A <br />MAXIMUM OF 15% TOTAL CEMENTITIOUS MATERIALS BY WEIGHT IF THE MIX <br />DESIGN IS PROPORTIONED PER ACI 318, SECTION 26.4.3. <br />10.CONCRETE MIXING OPERATIONS, ETC. SHALL CONFORM TO ASTM C94. <br />11.LEAN CONCRETE, WHERE SPECIFICALLY INDICATED, SHALL CONTAIN 2 SACKS <br />OF CEMENT PER CUBIC YARD OF CONCRETE. <br />12.DRYPACK OR NONSHRINK GROUT SHALL HAVE A MINIMUM 28 DAY <br />COMPRESSIVE STRENGTH OF 2 TIMES THE SUPPORTING CONCRETE <br />STRENGTH, AND SHALL BE OF FIVE STAR GROUT, SIKA GROUT 212, OR <br />APPROVED EQUAL WITH VALID CODE REPORT (LARR,ICC,ESR,IAPMO ER). <br />FOR THICK GROUT LAYERS FOLLOW MANUFACTURER'S GUIDELINES TO ATTAIN <br />THE REQUIRED STRENGTH, WHICH MAY INCLUDE THE ADDITION OF PEA <br />GRAVEL. <br />13.DO NOT USE ANY CONCRETE OR GROUT CONTAINING CHLORIDES. WATER <br />USED IN MIX SHALL BE CLEAN AND POTABLE. <br />14.PRIOR TO ERECTING ANY ELEMENTS THAT LOAD THE FOUNDATION, <br />CONCRETE MUST REACH AN UNCONFINED COMPRESSION STRENGTH OF 2000 <br />PSI MINIMUM AS DETERMINED BY TESTING OR PREVIOUSLY DOCUMENTED <br />DATA FOR THE MIX DESIGN USED UNDER SIMILAR CONDITIONS, AND MUST BE <br />ALLOWED TO CURE FOR A MINIMUM OF 3 DAYS. <br />15.FOR INTERIOR SLABS-ON-GRADE AND ALL OTHER SLABS RECEIVING ADHERED <br />FLOORING FINISHES (I.E., GLUED, ETC.), THE MAXIMUM W/C RATIO SHALL NOT <br />EXCEED 0.45. CURING COMPOUNDS USED ON CONCRETE THAT IS TO RECIEVE <br />FINISHES SHALL BE COMPATIBLE WITH TILE AND ADHESIVES OR GROUTS IN <br />ACCORDANCE WITH MANUFACTURER'S DATA AND BE APPROVED BEFORE USE. <br />16.MAINTAIN CONCRETE ABOVE 50 DEGREES FAHRENHEIT AND IN A MOIST <br />CONDITION FOR A MINIMUM OF 7 DAYS AFTER PLACEMENT UNLESS <br />OTHERWISE ACCEPTED BY SEOR. <br />17.SEE ARCHITECT'S PLANS FOR LOCATIONS OF SLAB SLOPES, DEPRESSIONS, <br />CURBS, DRAINS, NON-STRUCTURAL PARTITIONS AND OTHER EMBEDDED ITEMS <br />NOT SHOWN ON THE STRUCTURAL PLANS. <br />18.EXPOSED CORNERS OF SLABS, BEAMS, WALLS, COLUMNS, ETC. SHALL BE <br />FORMED WITH 3/4" CHAMFER, U.N.O. <br />STRUCTURAL CONCRETE NOTES: <br />LOCATION <br />MIN 28-DAY <br />COMP <br />STRENGTH <br />FOUNDATIONS <br />STEM WALLS, PILASTER 4000 PSI NWC 1 1/2"0.45 4"II / V <br />CONC <br />TYPEa <br />MAX <br />AGGR. <br />SIZE <br />MAX <br />W/C <br />RATIO <br />MAX <br />SLUMPb CEMENT <br />TYPE <br />4000 PSI NWC 1"0.50 6"II / VALL OTHER STRUCTURAL <br />CONCRETE NO NOTED.. <br />1.THE OWNER SHALL EMPLOY ONE OR MORE SPECIAL INSPECTORS TO PROVIDE <br />INSPECTIONS DURING CONSTRUCTION. THE SPECIAL INSPECTOR SHALL BE A <br />QUALIFIED PERSON WHO SHALL DEMONSTRATE COMPETENCE, TO THE <br />SATISFACTION OF THE BUILDING OFFICIAL, FOR INSPECTION OF THE PARTICULAR <br />TYPE OF CONSTRUCTION OR OPERATION REQUIRING SPECIAL INSPECTION. <br />2.SPECIAL INSPECTIONS ARE NOT REQUIRED WHERE THE WORK IS DONE ON THE <br />PREMISES OF A FABRICATOR REGISTERED AND APPROVED TO PERFORM SUCH <br />WORK WITHOUT SPECIAL INSPECTION. APPROVED FABRICATORS MUST SUBMIT A <br />CERTIFICATE OF COMPLIANCE FOR OFFSITE FABRICATIONS SUCH AS STRUCTURAL <br />STEEL, PRECAST CONCRETE, GLUED LAMINATED TIMBER, ETC. <br />3.ALL INSPECTIONS SHALL BE PERFORMED BY INDEPENDENT SPECIAL INSPECTORS. <br />JOB SITE VISITS BY THE STRUCTURAL ENGINEER OR BUILDING OFFICIAL DO NOT <br />CONSTITUTE AND ARE NOT A SUBSTITUTE FOR INSPECTIONS BY A SPECIAL <br />INSPECTOR. <br />4.ALL INSPECTION REPORTS SHALL BE SUBMITTED TO BUILDING OFFICIAL AND SEOR. <br />THE FINAL REPORTS BY THE SPECIAL INSPECTOR(S) MUST CERTIFY THAT THE <br />ENTIRE STRUCTURAL SYSTEM COMPLIES WITH THE APPROVED PLANS AND <br />SPECIFICATIONS. <br />5.IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO SEE THAT THESE <br />INSPECTIONS ARE PERFORMED. <br />6.WORK REQUIRING SPECIAL INSPECTION SHALL BE INSPECTED BY THE SPECIAL <br />INSPECTOR WHO IS PRESENT IN THE AREA WHERE THE WORK IS PERFORMED AND <br />AT THE COMPLETION OF WORK. CONTINUOUS INSPECTION CONSISTS OF FULL-TIME <br />INSPECTION; PERIODIC INSPECTION CONSISTS OF PART-TIME OR INTERMITTENT <br />INSPECTION. <br />7.THE FOLLOWING SPECIAL INSPECTIONS ARE IN ADDITION TO INSPECTIONS BY THE <br />BUILDING OFFICIAL. THIS LIST IS NOT INTENDED TO BE ALL INCLUSIVE. <br />FOR SI: 1 INCH = 25.4 MM <br />a. WHERE APPLICABLE, SEE ALSO SECTION 1705A.11, SPECIAL INSPECTIONS FOR <br />SEISMIC RESISTANCE. <br />b. SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTIONS SHALL BE INCLUDED IN <br />THE RESEARCH REPORT FOR THE ANCHOR ISSUED BY AN APPROVED SOURCE <br />IN ACCORDANCE WITH ACI 355.2 OR SHALL BE APPROVED BY THE BUILDING <br />OFFICIAL PRIOR TO COMMENCEMENT OF THE WORK. <br />c. INSTALLATION OFF ALL ADHESIVE ANCHORS IN THE HORIZONTAL AND UPWARDS <br />INCLINED POSITIONS SHALL BE PERFORMED BY AN ACI/CRSI CERTIFIED <br />ANCHOR INSTALLER <br />STATEMENT OF SPECIAL INSPECTIONS: <br />TABLE 1705.3 <br />REQUIRED VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION <br />VERIFICATION AND INSPECTION CONTI- <br />NUOUS <br />PERI- <br />ODIC <br />REFERENCED <br />STANDARDa CBC <br />REFERENCE <br />1. INSPECTION OF REINFORCING STEEL, <br />INCLUDING PRESTRESSING <br />TENDONS, AND PLACEMENT <br />-X ACI 318: 3.5, <br />7.1-7.7 - <br />---AWS D1.4; <br />ACI 318: 3.5.2 <br />2. INSPECTION OF REINFORCING STEEL <br />WELDING IN ACCORDANCE <br />WITH TABLE 1705A.2.1, ITEM 5B. <br />3.INSPECTION OF ANCHORS TO BE <br />INSTALLED IN CONCRETE PRIOR TO <br />AND DURING PLACEMENT OF CONCRETE <br />WHERE ALLOWABLE LOADS <br />HAVE BEEN INCREASED OR WHERE <br />STRENGTH DESIGN IS USED. <br />X -ACI 318: 8.1.3, <br />21.2.8 <br />1908.5, <br />1909.1 <br />4.INSPECTION OF ANCHORS POST- <br />INSTALLED IN HARDENED CONCRETE.b -X <br />ACI 318: 3.8.6, <br />8.1.3, <br />21.2.8 <br />1909.1 <br />5. VERIFYING USE OF REQUIRED <br />DESIGN MIX.-X ACI 318: CH 4, <br />5.2-5.4 <br />1904.2, <br />1910.2, <br />1910.3 <br />6.AT THE TIME FRESH CONCRETE IS <br />SAMPLED TO FABRICATE SPECIMENS <br />FOR STRENGTH TESTS, PERFORM <br />SLUMP AND AIR CONTENT TESTS, <br />AND DETERMINE THE TEMPERATURE <br />OF THE CONCRETE <br />X - <br />ASTM C172 <br />ASTM C31; <br />ACI 318: 5.6, 5.8 <br />1910.10 <br />7. INSPECTION FOR MAINTENANCE OF <br />SPECIFIED CURING TEMPERATURE <br />AND TECHNIQUES <br />-X ACI 318: <br />5.11-5.13 1910.9 <br />-X ACI 318: 6.1.1 - <br />8. INSPECT FORMWORK FOR SHAPE, <br />LOCATION AND DIMENSIONS OF <br />THE CONCRETE MEMBER BEING <br />FORMED.c <br />TABLE 1705.6 <br />REQUIRED VERIFICATION AND INSPECTION OF SOILS <br />VERIFICATION AND INSPECTION TASK <br />CONTINUOUS <br />DURING <br />TASK LISTED <br />PERIODICALLY <br />DURING <br />TASK LISTED <br />-X <br />-X <br />-X <br />X - <br />-X <br />1.VERIFY MATERIALS BELOW SHALLOW <br />FOUNDATIONS ARE ADEQUATE TO <br />ACHIEVE THE DESIGN BEARING CAPACITY <br />2.VERIFY EXCAVATIONS ARE EXTENDED TO <br />PROPER DEPTH AND HAVE REACHED <br /> PROPER MATERIAL. <br />3.PERFORM CLASSIFICATION AND TESTING <br />OF COMPACTED FILL MATERIALS. <br />4. VERIFY USE OF PROPER MATERIALS, <br />DENSITIES AND LIFT THICKNESSES DURING <br />PLACEMENT AND COMPACTION OF <br />COMPACTED FILL. <br />5.PRIOR TO PLACEMENT OF COMPACTED <br />FILL, OBSERVE SUBGRADE AND VERIFY <br />THAT SITE HAS BEE N PREPARED <br />PROPERLY. <br />Signed <br />11/9/2023 <br />1202 W Edinger <br />Ave10/3/2024