TITLE-24 MANDATORY MEASURES
<br />EQUIPMENT AND SYSTEMS EFFICIENCY
<br />1.ANY APPLIANCE FOR WHICH THERE IS A CALIFORNIA STANDARD ESTABLISHED IN THE
<br />APPLIANCE EFFICIENCY STANDARDS MAY BE INSTALLED ONLY IF THE MANUFACTURER
<br />HAS CERTIFIED TO THE COMMISSION, AS SPECIFIED IN THOSE REGULATIONS, THAT THE
<br />APPLIANCE COMPLIES WITH THE APPLICABLE STANDARD FOR THAT APPLIANCE.
<br />2.PIPING AND DUCTING SYSTEMS SHALL BE INSULATED IN ACCORDANCE WITH THE
<br />SECTIONS 120.3, 120.4, 120.7 OF TITLE 24 ENERGY EFFICIENCY STANDARDS, CHAPTER 6
<br />OF THE 2022 CMC, AND ALL CODES HAVING JURISDICTION.
<br />3.ALL HVAC SYSTEMS SHALL MEET THE EFFICIENCY AND CONTROL REQUIREMENTS PER
<br />SECTION 110.2 AND 120.2 E.E.S.
<br />4.ALL HVAC EQUIPMENT AND APPLIANCES SHALL MEET THE REQUIREMENTS PER SECTION
<br />110.1-110.3, 110.5, 120.1-120.4 TITLE-24 ENERGY STANDARDS.
<br />5.EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH AN AUTOMATIC TIME
<br />SWITCH WITH AN ACCESSIBLE MANUAL OVERRIDE THAT ALLOW OPERATION OF THE
<br />SYSTEM DURING OFF-HOURS FOR UP TO 4 HOURS. THE TIME SWITCH SHALL BE CAPABLE
<br />OF PROGRAMMING DIFFERENT SCHEDULES FOR WEEKDAYS AND WEEKENDS,
<br />INCORPORATE AN AUTOMATIC HOLIDAY "SHUT-OFF" FEATURE THAT TURNS OFF ALL
<br />LOADS FOR AT LEAST 24 HOURS, THEN RESUMES THE NORMALLY SCHEDULED
<br />OPERATION, AND HAS PROGRAM BACKUP CAPABILITIES THAT PREVENT THE LOSS OF
<br />THE DEVICE'S PROGRAM AND TIME SETTING FOR AT LEAST 10 HOURS IF POWER IS
<br />INTERRUPTED.
<br />6.EACH SPACE CONDITIONING SYSTEM SHALL BE INSTALLED WITH CONTROLS THAT
<br />TEMPORARILY RESTART AND TEMPORARILY OPERATE THE SYSTEM AS REQUIRED TO
<br />MAINTAIN A SETBACK HEATING AND COOLING THERMOSTAT SETPOINT.
<br />7.EACH SPACE CONDITIONING ZONE SHALL BE CONTROLLED BY AN INDIVIDUAL
<br />THERMOSTATIC CONTROL THAT RESPONDS TO TEMPERATURE WITHIN THE ZONE.
<br />WHERE USED TO CONTROL HEATING, THE CONTROL SHALL BE ADJUSTABLE DOWN TO
<br />55°F OR LOWER. FOR COOLING, THE CONTROL SHALL BE ADJUSTABLE UP TO 85°F OR
<br />HIGHER. WHERE USED TO CONTROL BOTH HEATING AND COOLING, THE CONTROL SHALL
<br />BE CAPABLE OF PROVIDING A DEAD BAND OR AT LEAST 5°F WITHIN WHICH THE SUPPLY
<br />OR HEATING AND COOLING IS SHUT OFF OF REDUCED TO A MINIMUM.
<br />8.THERMOSTATS SHALL HAVE NUMERIC SETPOINTS IN °F.
<br />9.THERMOSTATS SHALL HAVE ADJUSTABLE SETPOINT STOPS ACCESSIBLE ONLY TO
<br />AUTHORIZED PERSONNEL.
<br />10.HEAT PUMPS SHALL BE INSTALLED WITH CONTROLS TO PREVENT ELECTRIC RESISTANCE
<br />SUPPLEMENTARY HEATER OPERATION WHEN THE HEATING LOAD CAN BE MET BY THE
<br />HEAT PUMP ALONE. ELECTRIC RESISTANCE SUPPLEMENTARY HEATING OPERATION IS
<br />PERMITTED DURING TRANSIENT PERIODS, SUCH AS START-UPS AND FOLLOWING ROOM
<br />THERMOSTAT SETPOINT ADVANCE, WHEN CONTROLS ARE PROVIDED WHICH USE
<br />PREFERENTIAL RATE CONTROL, INTELLIGENT RECOVERY, STAGING, RAMPING, OR
<br />SIMILAR CONTROL MECHANISMS DESIGNED TO PRECLUDE THE UNNECESSARY
<br />OPERATION OF SUPPLEMENTARY HEATING DURING THE RECOVERY PERIOD.
<br />SUPPLEMENTARY HEATER OPERATION IS ALSO PERMITTED DURING DEFROST.
<br />11.GRAVITY OR AUTOMATIC DAMPERS INTERLOCKED AND CLOSED ON FAN SHUTDOWN
<br />SHALL BE PROVIDED ON THE OUTSIDE AIR INTAKES AND DISCHARGES OF ALL SPACE
<br />CONDITIONING AND EXHAUST SYSTEMS.
<br />12.ALL GRAVITY VENTILATING SYSTEMS SHALL BE PROVIDED WITH AUTOMATIC OR READILY
<br />ACCESSIBLE MANUALLY OPERATED DAMPERS IN ALL OPENINGS TO THE OUTSIDE,
<br />EXCEPT FOR COMBUSTION AIR OPENINGS.
<br />13.ALL BALANCING: ALL SPACE CONDITIONING AND VENTILATION SYSTEMS SHALL BE
<br />BALANCED TO THE QUANTITIES SPECIFIED IN THESE PLANS, IN ACCORDANCE WITH AND
<br />PERFORMED BY A COMPANY CERTIFIED BY THE NATIONAL ENVIRONMENTAL BALANCING
<br />BUREAU (NEBB) PROCEDURAL STANDARDS (1983), OR ASSOCIATED AIR BALANCE
<br />COUNCIL (AABC) NATIONAL STANDARDS (1986).
<br />14.OUTSIDE AIR CERTIFICATION: THE SYSTEM SHALL PROVIDE THE MINIMUM OUTSIDE AIR
<br />AS SHOWN ON THE MECHANICAL DRAWINGS, AND SHALL BE MEASURED AND CERTIFIED
<br />BY THE INSTALLING LICENSED C-20 MECHANICAL CONTRACTOR.
<br />15.THE AIR CONDITIONING SYSTEM SHALL BE ENERGIZED 1 HOUR IMMEDIATELY PRIOR TO
<br />OCCUPANCY TO PROVIDE THE MINIMUM REQUIRED VENTILATION RATE.
<br />CALGREEN MANDATORY MEASURE NOTES
<br />1.FOR NEW BUILDING 10,000 SQUARE FEET AND OVER, BUILDING COMMISSIONING SHALL
<br />BE INCLUDED IN THE DESIGN AND CONSTRUCTION PROCESSES OF THE BUILDING
<br />PROJECT TO VERIFY THAT THE BUILDING SYSTEMS AND COMPONENTS MEET THE
<br />OWNER'S OR OWNER REPRESENTATIVE'S PROJECT REQUIREMENTS. THE
<br />COMMISSIONING REQUIREMENTS SHALL INCLUDE OWNER'S PROJECT REQUIREMENTS
<br />(OPR), BASIS OF DESIGN (BOD), COMMISSIONING MEASURES, COMMISSIONING PLAN,
<br />FUNCTIONAL PERFORMANCE TESTING, DOCUMENTATION AND TRAINING AND A FINAL
<br />COMMISSIONING REPORT. (CALGREEN SECTION 5.410.2)
<br />2.PROVIDE TESTING AND ADJUSTING OF SYSTEMS IN ACCORDANCE WITH CALGREEN
<br />SECTION 5.410.4.
<br />3.THE PERMANENT HVAC SYSTEM SHALL ONLY BE USED DURING CONSTRUCTION IF
<br />NECESSARY TO CONDITION THE BUILDING OR AREAS OF ADDITION OR ALTERATION
<br />WITHIN THE REQUIRED TEMPERATURE RANGE FOR MATERIAL AND EQUIPMENT
<br />INSTALLATION. IF THE HVAC SYSTEM IS USED DURING CONSTRUCTION, USE RETURN
<br />AIR FILTERS WITH A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 8, BASED ON
<br />ASHRAE 52.2-1999. REPLACE ALL FILTERS IMMEDIATELY PRIOR TO OCCUPANCY, OR, IF
<br />THE BUILDING IS OCCUPIED DURING ALTERATION, AT THE CONCLUSION OF
<br />CONSTRUCTION. (CALGREEN SECTION 5.504.1)
<br />4.AT THE TIME OF ROUGH INSTALLATION, DURING STORAGE ON THE CONSTRUCTION SITE
<br />AND UNTIL FINAL STARTUP OF THE HEATING, COOLING AND VENTILATING EQUIPMENT,
<br />ALL DUCT AND OTHER RELATED AIR DISTRIBUTION COMPONENT OPENINGS SHALL BE
<br />COVERED WITH TAPE, PLASTIC, SHEET METAL OR OTHER METHODS ACCEPTABLE TO
<br />THE ENFORCING AGENCY TO REDUCE THE AMOUNT OF WATER, DUST AND DEBRIS,
<br />WHICH MAY ENTER THE SYSTEM. (CALGREEN SECTION 4.501 OR 5.504.3)
<br />5.ALL PAINTS, ADHESIVES, SEALANTS AND CAULKS SHALL MEET THE REQUIREMENTS OF
<br />CALGREEN SECTION 4.504.2 OR 5.504.4.
<br />6.IN MECHANICALLY VENTILATED BUILDINGS, PROVIDE REGULARLY OCCUPIED AREAS OF
<br />THE BUILDING WITH AIR FILTRATION MEDIA FOR OUTSIDE AND RETURN AIR THAT
<br />PROVIDES AT LEAST A MINIMUM EFFICIENCY REPORTING VALUE (MERV) OF 13. MERV 13
<br />SHALL BE INSTALLED PRIOR TO OCCUPANCY, AND RECOMMENDATIONS FOR
<br />MAINTENANCE WITH FILTERS OF THE SAME VALUE SHALL BE INCLUDED IN THE
<br />OPERATIONS AND MAINTENANCE MANUAL. (CALGREEN SECTION 5.504.5.3)
<br />7.FOR BUILDINGS OR ADDITIONS EQUIPPED WITH DEMAND CONTROL VENTILATION, CO2
<br />SENSORS AND VENTILATION CONTROLS SHALL BE SPECIFIED AND INSTALLED IN
<br />ACCORDANCE WITH THE REQUIREMENTS OF THE CALIFORNIA ENERGY CODE.
<br />(CALGREEN SECTION 5.506.2)
<br />8.HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT SHALL NOT CONTAIN ANY
<br />CHLOROFLUOROCARBONS (CFCs). (CALGREEN SECTION 5.508.1.1)
<br />9.HVAC, REFRIGERATION AND FIRE SUPPRESSION EQUIPMENT SHALL NOT CONTAIN ANY
<br />HALONS. (CALGREEN SECTION 5.508.1.2)
<br />10.LOW-RISE RESIDENTIAL: EACH BATHROOM SHALL BE MECHANICALLY VENTILATED. FANS
<br />SHALL BE ENERGY STAR COMPLIANT AND BE DUCTED TO TERMINATE OUTSIDE THE
<br />BUILDING. UNLESS FUNCTIONING AS A COMPONENT OF A WHOLE HOUSE VENTILATION
<br />SYSTEM, FANS MUST BE CONTROLLED BY A HUMIDITY CONTROL. HUMIDITY CONTROLS
<br />SHALL BE CAPABLE OF ADJUSTMENT BETWEEN A RELATIVE HUMIDITY RANGE OF LESS
<br />THAN OR EQUAL TO 50% TO A MAXIMUM OF 80%. A HUMIDITY CONTROL MAY UTILIZE
<br />MANUAL OR AUTOMATIC MEANS OF ADJUSTMENT. (CALGREEN SECTION 4.506)
<br />tk1sc project number: B2305501.000
<br />drawn by:checked by:
<br />drawing no.:
<br />ar
<br />c
<br />h
<br />i
<br />t
<br />e
<br />c
<br />t
<br />u
<br />r
<br />e
<br />pl
<br />a
<br />n
<br />n
<br />i
<br />n
<br />g
<br />in
<br />t
<br />e
<br />r
<br />i
<br />o
<br />r
<br />s
<br />tB
<br />P
<br />/
<br />A
<br />r
<br />c
<br />h
<br />i
<br />t
<br />e
<br />c
<br />t
<br />u
<br />r
<br />e
<br />46
<br />1
<br />1
<br />
<br />T
<br />e
<br />l
<br />l
<br />e
<br />r
<br />
<br />A
<br />v
<br />e
<br />n
<br />u
<br />e
<br />Ne
<br />w
<br />p
<br />o
<br />r
<br />t
<br />
<br />B
<br />e
<br />a
<br />c
<br />h
<br />,
<br />
<br />C
<br />A
<br />
<br />9
<br />2
<br />6
<br />6
<br />0
<br />ph
<br />:
<br />
<br />9
<br />4
<br />9
<br />.
<br />6
<br />7
<br />3
<br />.
<br />0
<br />3
<br />0
<br />0
<br />consultant
<br />agency
<br />owner
<br />date:
<br />drawing title:
<br />description:date:Rev:
<br />tBP project number :
<br />architect
<br />THIS DRAWING AND THE DESIGNS, DEPICTIONS, IDEAS AND OTHER INFORMATION
<br />CONTAINED HEREIN CONSTITUTE UNPUBLISHED WORK OF tBP/ARCHITECTURE AND
<br />SHALL REMAIN THE PROPERTY OF tBP/ARCHITECTURE IN PERPETUITY. NO PART
<br />THEREOF SHALL BE REPRODUCED, DISCLOSED, DISTRIBUTED, SOLD, PUBLISHED OR
<br />OTHERWISE USED IN ANY WAY WITHOUT THE ADVANCED EXPRESS WRITTEN CONSENT
<br />OF tBP/ARCHITECTURE.
<br />ph: 714.667.2700
<br />SANTA ANA, CA 92701
<br />20 CIVIC CENTER PLAZA
<br />SANTA ANA PLANNING AND BUILDING AGENCY
<br />#
<br />DA
<br />N
<br />C
<br />E
<br />
<br />S
<br />T
<br />U
<br />D
<br />I
<br />O
<br />SA
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />L
<br />I
<br />F
<br />O
<br />R
<br />N
<br />I
<br />A
<br />
<br />9
<br />2
<br />7
<br />0
<br />7
<br />12
<br />0
<br />2
<br />
<br />W
<br />
<br />E
<br />D
<br />I
<br />N
<br />G
<br />E
<br />R
<br />
<br />A
<br />V
<br />E
<br />MA
<br />T
<br />E
<br />R
<br />
<br />D
<br />E
<br />I
<br />
<br />H
<br />I
<br />G
<br />H
<br />
<br />S
<br />C
<br />H
<br />O
<br />O
<br />L
<br />21125.00
<br />SA
<br />N
<br />T
<br />A
<br />
<br />A
<br />N
<br />A
<br />,
<br />
<br />C
<br />A
<br />L
<br />I
<br />F
<br />O
<br />R
<br />N
<br />I
<br />A
<br />
<br />9
<br />2
<br />7
<br />0
<br />7
<br />12
<br />0
<br />2
<br />
<br />W
<br />
<br />E
<br />D
<br />I
<br />N
<br />G
<br />E
<br />R
<br />
<br />A
<br />V
<br />E
<br />MA
<br />T
<br />E
<br />R
<br />
<br />D
<br />E
<br />I
<br />
<br />H
<br />I
<br />G
<br />H
<br />
<br />S
<br />C
<br />H
<br />O
<br />O
<br />L
<br />21125.00
<br />09/06/2023
<br />11870 Pierce Street, Suite 160
<br />Riverside, California 92505
<br />951.299.4160 www.tk1sc.com
<br />Project Leader - Bill Voller
<br />tk1sc Job #: B2305501.000
<br />Mechanical Lead - Joe Millham
<br />City Submittal 09/06/23-
<br />TITLE 24 COMPLIANCE
<br />FORMS
<br />M0-2
<br />21159.00
<br />1202 W Edinger
<br />Ave10/3/2024
|