Laserfiche WebLink
McPherson Engineering By: F.A. <br />Date: 2/1/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 8.11% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 3.52% < 10% = OK! <br />Anchorage: <br />DEMAND OF 485.5LB. < CAPACITY OF 1106.6LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 3.3IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />2/1/2023 11:30 AM <br />7 of 7 <br />©McPherson Engineering <br />1109 W Alton Ave <br />02/09/23