Laserfiche WebLink
McPherson Engineering By: F.A. <br />Date: 12/19/22 <br />Gravity Loads: <br />DEMAND DECREASED BY 15.13% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 7.32% < 10% = OK! <br />Anchorage: <br />DEMAND OF 439.7LB. < CAPACITY OF 1106.6LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 3.3IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />12/19/2022 1:45 PM <br />7 of 7 <br />©McPherson Engineering <br />1106 E Buffalo Ave <br />Unit #201/17/23