Laserfiche WebLink
McPherson Engineering By: C.C. <br />Date: 1/19/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 9.25% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 4.4% < 10% = OK! <br />Anchorage: <br />DEMAND OF 473.6LB. < CAPACITY OF 1702.4LB. = OK! <br />USE (2) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />1/19/2023 10:02 AM <br />7 of 7 <br />©McPherson Engineering <br />1134 S Ross St - <br />10111298802/23/23