Laserfiche WebLink
UP <br />F <br />M <br />UP <br />26 <br />' <br /> - <br /> <br />4 <br /> <br />1 <br />/ <br />2 <br />" <br />4' - 9 1/4" <br />41 <br />' <br /> <br />- <br /> <br />2 <br />" <br />21' - 3 1/2" <br />12' - 3 1/2" 8' - 6" <br />15 SPOTS 2 SPOTS <br />8 SPOTS <br />9 SPOTS <br />9 SPOTS <br />44 <br />' <br /> <br />- <br /> <br />9 <br /> <br />3 <br />/ <br />4 <br />" <br />19' - 8 3/4" <br />46' - 11 1/2" <br />47 <br />' <br /> <br />- <br /> <br />0 <br />" <br />97' - 6" <br />25 <br />' <br /> <br />- <br /> <br />2 <br />" <br />19 <br />' <br /> <br />- <br /> <br />1 <br />0 <br />" <br />2' <br /> <br />- <br /> <br />0 <br />" <br />2' - 6 1/2" <br />47 <br />' <br /> <br />- <br /> <br />3 <br /> <br />1 <br />/ <br />2 <br />" <br /> <br />2' - 9 1/4" <br />12 <br />' <br /> <br />- <br /> <br />2 <br /> <br />1 <br />/ <br />2 <br />" <br />99' - 6" <br />18 <br />' <br /> <br />- <br /> <br />4 <br />" <br />15' - 6 1/2" <br />13' - 6 1/2" <br />7' - 11 1/4" <br />4' <br /> <br />- <br /> <br />0 <br />" <br /> <br />4' <br /> <br />- <br /> <br />0 <br />" <br /> <br />4' <br /> <br />- <br /> <br />0 <br />" <br /> <br />4' <br /> <br />- <br /> <br />0 <br />" <br /> <br />4' <br /> <br />- <br /> <br />0 <br />" <br /> <br />4' <br /> <br />- <br /> <br />0 <br />" <br /> <br />4' <br /> <br />- <br /> <br />0 <br />" <br />5' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" <br />16' - 11 1/2" <br />S24 <br />LIMITS OF WORK <br />A62.4 <br />3 <br />S24 (N) BUILDING MONUMENT SIGNAGE SEE A62.4 FOR DETAILS <br />GENERAL <br />GEN-1 PROJECT INFORMATION & SHEET INDEX <br />ARCHITECTURAL <br />A01.2 SITE IMPROVEMENT PLAN <br />A21.1 EXTERIOR ELEVATIONS <br />A21.2 EXTERIOR ELEVATIONS <br />A62.4 ENTRY SIGNAGE <br />STRUCTURAL <br />S0.1 GENERAL NOTES <br />S0.2 GENERAL NOTES <br />S1.1 TYPICAL DETAILS <br />S2.1 FOUNDATION AND FRAMING PLAN <br />S3.1 FOUNDATION DETAILS <br />S4.1 FRAMING DETAILS <br />THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO SVA ARCHITECTS <br />INC. AND IS FURNISHED IN CONFIDENCE FOR THE LIMITED PURPOSE OF <br />EVALUATION, BIDDING OR REVIEW. THIS DOCUMENT OR ITS CONTENTS MAY <br />NOT BE USED FOR ANY OTHER PURPOSE AND MAY NOT BE REPRODUCED OR <br />DISCLOSED TO OTHERS WITHOUT THE PRIOR WRITTEN CONSENT OF SVA <br />ARCHITECTS INC. ALL RIGHTS RESERVED, © COPYRIGHT 2018. <br />SCALE: <br />REVISIONS: <br />OW <br />N <br />E <br />R <br />: <br /> <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br />: <br /> <br />CL <br />I <br />E <br />N <br />T <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />: <br /> <br />6 HUTTON CENTRE DR, SUITE 1150 SANTA ANA, CA 92707 <br />T 949.809.3380 WWW.SVA-ARCHITECTS.COM <br />DATE ISSUED: <br />PROJECT NO: <br />As indicated <br />11/01/23 <br />A01.0 <br />SITE <br />IMPROVEMENT <br />PLAN - SIGNAGE <br />2022-40123 <br />CI <br />T <br />Y <br /> <br />O <br />F <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />NE <br />W <br />H <br />O <br />P <br />E <br /> <br />L <br />I <br />B <br />R <br />A <br />R <br />Y <br />MO <br />D <br />E <br />R <br />N <br />I <br />Z <br />A <br />T <br />I <br />O <br />N <br />12 <br />2 <br /> <br />N <br />. <br /> <br />N <br />E <br />W <br />H <br />O <br />P <br />E <br /> <br />S <br />T <br />. <br />, <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />3 <br />DESCRIPTION DATE <br />1" = 10'-0" 1SIGNAGE SITE IMPROVEMENT PLAN <br />SIGNAGE SITE PLAN KEYNOTES <br />SCOPE OF WORK: DEMO EXISTING MONUMENT SIGN, INSTALL A NEW FREESTANDING MONUMENT SIGN <br />APPLICABLE CODES ARE: 2022 CBC, 2022 CEC, 2022 ENERGY CODE, AND CITY OF SANTA ANA MUNICIPAL <br />CODE <br />SHEET INDEX <br />Bldg #101117776 <br /> <br />APPROVALS: <br />PLNG - C. Santana <br />BLDG - W. Lee <br />122 N Newhope <br />Street4/16/2025