My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1228 W Myrtle St - Plan
PBA
>
Building
>
ProjectDox
>
M
>
Myrtle St
>
1228 W Myrtle St
>
1228 W Myrtle St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 11:56:48 AM
Creation date
6/1/2025 11:56:36 AM
Metadata
Fields
Template:
Plan
Permit Number
20180345
101115895
Full Address
1228 W Myrtle St
Text box
ID:
1
Creator:
Import Agent
Created:
6/1/2025 11:56 AM
Modified:
5/30/2025 12:13 PM
Text:
mailto:projects@evengineersnet.com
ID:
2
Creator:
Import Agent
Created:
6/1/2025 11:56 AM
Modified:
5/30/2025 12:13 PM
Text:
http://www.evengineersnet.com/
ID:
3
Creator:
Import Agent
Created:
6/1/2025 11:56 AM
Modified:
5/30/2025 12:13 PM
Text:
http://www.evengineersnet.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Structural Letter for PV Installation <br />Date: 07/17/2023 <br />Job Address: 1228 W MYRTLE ST <br />SANTA ANA, CA 92703 <br />Job Name: ERNESTO RIVAS <br />Job Number: 230717ER <br />Scope of Work <br />Table of Content <br />Sheet <br />2 Cover <br />3 Attachment Uplift checks <br />4 Roof Framing Check <br />5 Seismic Check and Scope of work <br />Engineering Calculations Summary <br />Code 2022 California Building Code (ASCE 7-16) <br />Risk category II <br />Roof Dead Load Dr 10 psf <br />PV Dead Load DPV 3 psf <br />Roof Live Load Lr 20 psf <br />Ground Snow S 0 psf <br />Wind Load (component and Cladding) <br />V 110 mph <br />Exposure C <br />References <br />NDS for Wood Construction <br />Sincerely, <br />Signed 07/17/2023 <br />Eugene Munyanziza, P.E. <br />EV Engineering, LLC <br />projects@evengineersnet.com <br />http://www.evengineersnet.com Exp: 06/30/2024 <br />This Letter is for the existing roof framing which supports the new PV modules as well as the attachment of the PV <br />system to existing roof framing. All PV mounting equipment shall be designed and installed per manufacturer's <br />approved installation specifications. <br />projects@evengineersnet.com <br />http://www.evengineersnet.com <br />1228 W Myrtle St - <br />2018034508/16/23
The URL can be used to link to this page
Your browser does not support the video tag.