Laserfiche WebLink
SD1 <br />Job # <br />Sheet No.: <br />Scale <br />Date <br />Pr <br />o <br />j <br />e <br />c <br />t <br /> <br />f <br />o <br />r <br />: <br />DE <br />T <br />A <br />C <br />H <br />E <br />D <br /> <br />A <br />D <br />U <br />13 <br />1 <br />3 <br /> <br />E <br />N <br />G <br />L <br />I <br />S <br />H <br /> <br />S <br />T <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />6 <br />Pl <br />a <br />n <br /> <br />C <br />h <br />e <br />c <br />k <br /> <br /># <br />: <br />__ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />_ <br />SEAL: <br />SHEET DESCRIPTION : <br />01/27/2024 <br />S2413 <br />Co <br />n <br />t <br />a <br />c <br />t <br />: <br />FOUNDATION <br />DETAILS <br />SINGLE LAYER INTERSECTION & CORNER <br />L <br />L <br />L <br />L <br />L <br />L <br />L L <br />L <br />L = 30 BAR DIAM. MIN. IN CONCRETE. <br />40 BAR DIAM. MIN. IN MASONRY. <br />DOUBLE LAYER INTERSECTION & CORNER <br />CONCRETE FOOTING INTERSECTION <br />REINF. MAY BE CONT. OR <br />ADD BARS WITH SAME SIZE <br />& SPACING AS <br />WALL/FOOTING REINF. <br />BEND <br />LAP SPLICE <br />STIRRUP <br />TIE OR HOOK <br />NOTES: <br />CROSSTIE <br />WIRE TIE END <br />D D <br />90° BEND <br />R <br />180° BEND <br />R12 <br />" <br />4 db <br />2 12" MIN. <br />6 d <br />b <br />4" M <br />I <br />N <br />. <br />6db <br />3" M <br />I <br />N <br />. <br />* INCREASE LENGTH BY 30% FOR TOP BARS (HORIZONTALBARS SO PLACED THAT MORE THAN 12" OF FRESH CONC.IS CAST IN THE MEMBER BELOW, EXCLUDE WALLS) <br />DE <br />T <br />A <br />I <br />L <br />I <br />N <br />G <br />DI <br />M <br />E <br />N <br />S <br />I <br />O <br />N <br />DE <br />T <br />A <br />I <br />L <br />I <br />N <br />G <br />DI <br />M <br />E <br />N <br />S <br />I <br />O <br />N <br />6 d <br />b <br />4" M <br />I <br />N <br />. <br />12 <br /> <br />d <br />b F <br />O <br />R <br /> <br /># <br />6 <br /> <br />T <br />H <br />R <br />U <br /> <br /># <br />8 <br />3" <br /> <br />M <br />I <br />N <br />" <br />D= 4db FOR #3 THRU #5 <br />D= 6db FOR #6 THRU #8 <br />8db <br />8db <br />48 db <br />R= 3db FOR #3 THRU #8R= 4db FOR #9 THRU #11R= 5db FOR #14 THRU #18 <br />1. PUT CROSSTIE W/ EACH STIRRUP ALT. 135° <br />BENDS (90° FOR CIRCULAR TIE) <br />2. ALL BENDS SHALL BE MADE COLD <br />TYP. REBAR DETAIL <br />1' <br />- <br />0 <br />" <br /> <br />M <br />I <br />N <br />. <br />6" <br /> <br />M <br />I <br />N <br />. <br />SEE PLAN <br />(3" MIN.) <br />℄ POST & PAD <br />WOOD POST <br />F.G. <br />SEE PLAN <br />(3" MIN.) <br />OPT. CONC. SLAB <br />PAD & REINF. <br />SEE PLANS <br />SIMP. COLUMN <br />BASE CB/ CBSQ <br />(U.N.O.) PER PLAN <br />12" 12" THRU STIRRUP <br />#3 MIN. "V" BAR BENT <br />ALT. COND. <br />12" 12" THRU STIRRUP <br />#3 MIN. "V" BAR BENT <br />COLUMN BASE <br />D <br /> <br /> <br /> <br />W <br />2" <br />MI <br />N <br />. <br />PORCH SLAB <br />SLOPE TO DRAIN <br />6" <br />MIN. <br />F.G. <br />6" <br />MI <br />N <br />. <br />NOTE: <br />INFORMATION NOT SHOWN.SEE DETAIL #3 FOR LEGEND ANDFACE OF STUDS <br />#3 X 24" DOWELS @ 24" O.C. <br />HOUSE FOOTING TO PORCH SLAB <br />NOTE: <br />SEE DETAIL #3 FOR LEGEND & INFORMATION NOT SHOWN <br />CONC. SLAB <br />SHOT PIN SEE SHEET <br />S-0 <br />NON-BEARING INTERIOR WALL <br />SO <br />I <br />L <br />: <br /> <br />8 <br />" <br /> <br />M <br />I <br />N <br />. <br />CO <br />N <br />C <br />. <br />: <br /> <br />4 <br />" <br /> <br />M <br />I <br />N <br />. <br />12" <br />7" <br />MI <br />N <br />. <br />EM <br />B <br />E <br />D <br />1. 2X STUD WALL <br />2. SHEAR WALL AS OCCURS, SEE PLAN <br />AND SHEAR WALL SCHEDULE <br />3. P.T.D.F. SILL PLATE W/ 5/8"Ø <br />ANCHOR BOLTS PER SHEAR WALL <br />SCHEDULE, (2) BOLTS PER PIECE <br />WITH (1) BOLT LOCATED NOT MORE <br />THAT 12" OR LESS THAN 7db. FROM <br />EACH END AND/OR SPLICE OF THE <br />PIECE. <br />4. (2) #4 BARS, TOP AND BOTTOM <br />5. #3 DOWELS @ 18" O.C <br />6. SLAB PER PLAN <br />7. SUBGRADE AND VAPOR BARRIER <br />PER PLAN <br />8. SCREED @ STUCCO FINISH <br />18 <br />" <br />1 <br />2 <br />3 <br />4 <br />6 <br />5 <br />7 <br />8 <br />7" <br />FO <br />R <br /> <br />2 <br />PO <br />U <br />R <br />S <br />ON <br />L <br />Y <br />FOOTING DETAIL <br />HDU <br />5" MIN. <br />16 <br />" <br />MI <br />N <br />. <br />RE <br />T <br />U <br />R <br />N <br />3" <br />CL <br />R <br />. <br />le <br />1 3/4" <br />MIN. <br />E <br />E <br />le <br />18" <br />18 <br />" <br />1. REBAR PER TABLE, CENTERED @ "HD" <br />(BEND REBAR @ CORNER). FOR COND. <br />B, LOCATE TOP REBAR 3" TO 5" FROM <br />TOP OF CONCRETE. <br />2. EDGE OF DEEPENED SLAB/FTG FOR <br />HOLDOWN @ INT. SHEAR WALL. <br />3. CONCRETE STEM/FOOTING WIDTH (8" <br />MIN. FOR 7/8"Ø BOLT, 6" MIN. FOR <br />5/8"Ø BOLT) ENTIRE EMBED. LENGTH. <br />4. SS BOLTS PER SCHEDULE. <br />5. FTG WIDTH (13" FOR 7/8"Ø BOLT, 9" <br />FOR 5/8"Ø BOLT). <br />6. EXTERIOR FOOTING EDGE. <br />7. CONCRETE CORNER. <br />8. CONCRETE END. <br />9. DEEPEND FOOTING AS REQUIRED TO <br />ENSURE PROPER EMBEDMENT <br />10.USE 16D SINKER NAILS. (0.148"X3 <br />1/4"). <br />NOTES: <br />- SEE PLANS FOR HOLDOWN <br />TYPES. <br />- SEE DETAIL #1 FOR LEGEND <br />& INFORMATION NOT SHOWN. <br />- REFER TO MANUFACTURER <br />SPECIFICATIONS FOR <br />INSTALLATION INFORMATION <br />NOT SHOWN. <br />- WHEN 3-2X MEMBER IS <br />USED FOR HDQ8 & HDU, <br />1/4"Øx4 1/2" SDS SCREWS <br />SHOULD BE USED. <br />SIMPSON <br />HOLDOWN SB BOLTS #4 BAR X 8'-0" <br />CENTERED @ HD*le (in.) <br />IN LIEU OF #4 USE <br />#5 BAR X 8'-0" <br />CENTERED @ HD * <br />HDU2 SS5/8x24 (2) TOP & BOT. (1) TOP & (1) BOT. <br />HDU4 (2) TOP & BOT. (1) TOP & (1) BOT. <br />HDU5 / HTT5 (2) TOP & BOT. (1) TOP & (1) BOT. <br />HDU8 / HDQ8 (2) TOP & BOT. (1) TOP & (1) BOT. <br />* CONT. FOOTING REINFORCEMENT CAN BE COUNTED AS PART OF REBAR REQUIREMENT IFBAR SIZE ARE SAME AS THOSE REQUIRED PER SCHEDULE; OTHERWISE, BARS PERSCHEDULE ARE ADDITIONAL. <br />SB BOLTS INSTALLATION @ <br />SW @ EXT. FOOTING <br />SB BOLT INSTALLATION @ <br />SW @ INT. FTG/SLAB <br />PLAN VIEW SB @ <br />CONC. CORNER <br />PLAN VIEW SB @ <br />CONC. END <br />1 <br />2 <br />53 <br />4 9 <br />6 <br />4 <br />1 <br />7 <br />4 <br />8 <br />5" <br />MIN. <br />3" <br />CL <br />R <br />. <br />24" <br />NOTES: <br />- 4x4 POSTS CAN BE REPLACED <br />W/ 2-2x4 AS LONG AS NAILS ARE <br />MAINTAINED W/ MIN. EDGE <br />DISTANCE AS REQUIRED BY THE <br />MANUF. SPEC. & S.W. EDGE <br />NAILS STAGGERED ON BOTH <br />STUDS. <br />- FOR NON-MONOPOUR <br />FOUNDATIONS, USE (2) #5 <br />DOWELS PER EACH SB BOLT, <br />PLACED WITHIN 2" FROM THE <br />BOLT. <br />HOLD DOWN <br />8"8" <br />E-E SECTION <br />le <br />3" <br />CL <br />R <br />. <br />9 9 <br />SS5/8x24 <br />SS5/8x24 <br />SS7/8x24 <br />24" <br />24" <br />24" <br />1313 N English St <br />8/28/2024