Laserfiche WebLink
CODE INFORMATION <br />APPLICABLE CODES, LAWS AND REGULATIONS <br />CODE INFORMATION <br />APPLICABLE CODES, LAWS AND REGULATIONS <br />2022 CALIFORNIA BUILDING CODE (CBC) <br />2022 CALIFORNIA RESIDENTIAL CODE (CRC) <br />2022 CALIFORNIA FIRE CODE (CFC) <br />2022 CALIFORNIA ELECTRICAL CODE (CEC) <br />2022 CALIFORNIA MECHANICAL CODE (CMC) <br />2022 CALIFORNIA PLUMBING CODE (CPC) <br />PROJECT <br />1 <br />4 <br /> <br />1 <br /> <br />4 <br /> <br /> <br />H <br />A <br /> <br />R <br /> <br />B <br /> <br />O <br /> <br />U <br /> <br />R <br /> <br /> W <br /> <br />A <br /> <br />Y <br /> <br /> S <br /> <br />O <br /> <br />U <br /> <br />T <br /> <br />H <br />R <br />I <br /> <br />C <br /> <br />H <br /> <br />M <br /> <br />O <br /> <br />N <br /> <br />D <br /> <br />, <br /> <br /> C <br /> <br />A <br /> <br /> <br /> <br />9 <br />4 <br /> <br />8 <br /> <br />0 <br /> <br />4 <br />( <br />5 <br /> <br />1 <br /> <br />0 <br /> <br />) <br /> <br /> 5 <br /> <br />4 <br /> <br />0 <br /> <br />- <br /> <br />0 <br /> <br />5 <br /> <br />5 <br /> <br />0 <br />C <br />O <br /> <br />R <br /> <br />P <br /> <br />O <br /> <br />R <br /> <br />A <br /> <br />T <br /> <br />I <br /> <br />O <br /> <br />N <br /> <br />, <br /> <br /> <br /> <br />S <br />Y <br /> <br />S <br /> <br />T <br /> <br />E <br /> <br />M <br /> <br />S <br />R E V I S I O N S <br />SO <br />L <br />A <br />R <br /> <br />I <br />N <br />D <br />I <br />V <br />I <br />D <br />U <br />A <br />L <br /> <br />P <br />E <br />R <br />M <br />I <br />T <br /> <br />P <br />A <br />C <br />K <br />A <br />G <br />E <br />GR <br />I <br />D <br />- <br />T <br />I <br />E <br />D <br /> <br />P <br />H <br />O <br />T <br />O <br />V <br />O <br />L <br />T <br />A <br />I <br />C <br /> <br />S <br />Y <br />S <br />T <br />E <br />M <br />REV DESCRIPTION DATE DB <br />DRAWN BY: <br />DATE DRAWN <br />SCALE <br />AL <br />B <br />I <br />N <br />O <br /> <br />G <br />O <br />N <br />Z <br />A <br />L <br />E <br />Z <br />13 <br />1 <br />4 <br /> <br />S <br /> <br />S <br />H <br />A <br />W <br />N <br />E <br />E <br /> <br />D <br />R <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />L <br />I <br />F <br />O <br />R <br />N <br />I <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />4 <br />RP-432118 <br />10 <br />. <br />0 <br />0 <br />5 <br /> <br />k <br />W <br />07-20-2023 <br />R. Bose Soriano <br />ROLAND BOSE SORIANO <br />C <br />A <br /> <br /> <br />L <br />I <br /> <br />C <br /> <br />E <br /> <br />N <br /> <br />S <br /> <br />E <br /> <br /> C <br />- <br />1 <br />0 <br />, <br /> <br />B <br /> <br /> # <br /> <br />8 <br /> <br />9 <br /> <br />0 <br /> <br />8 <br /> <br />9 <br /> <br />5 <br />C <br />A <br /> <br /> <br />L <br />I <br /> <br />C <br /> <br />E <br /> <br />N <br /> <br />S <br /> <br />E <br /> <br /> C <br />- <br />1 <br />0 <br />, <br /> <br />B <br /> <br /> # <br /> <br />8 <br /> <br />9 <br /> <br />0 <br /> <br />8 <br /> <br />9 <br /> <br />5 <br />(N) GRID TIED PHOTOVOLTAIC SYSTEM <br />SOLAR INDIVIDUAL PERMIT PACKAGE <br />ALBINO GONZALEZ <br />1314 S SHAWNEE DR <br />7147090993 <br />SANTA ANA, CALIFORNIA 92704 <br />10.005 kW <br />AHJ: SANTA ANA CITY <br />UTILITY: SOUTHERN CALIFORNIA EDISON CO <br />SATELLITE IMAGE <br />CO <br />V <br />E <br />R <br /> <br />S <br />H <br />E <br />E <br />T <br />PROJECT LOCATION <br />NTS <br />SHEET INDEX <br />SCOPE OF WORK <br />- (N) 10.005 kW PHOTOVOLTAIC SYSTEM <br />- AC kW = MAXIMUM CONTINUOUS OUTPUT POWER X NO. OF MODULES = 384W X 23 = 8.832 kW <br />- (23) SunPower SPR-M-435-H-AC PV MODULES <br />- POINT OF INTERCONNECTION AT MAIN SERVICE PANEL WITH CIRCUIT BREAKER <br />- MAIN PANEL UPGRADE TO (N) 225A/200A <br />- COMP SHINGLE INSET REQUIRED <br />AC = 8.832 kW <br />DC = 10.005 kW <br />NOTES <br />SHEET <br />PVA-0 <br />ARCHITECTURAL DRAWINGS <br />ELECTRICAL DRAWINGS <br />PVE-1 ELECTRICAL SINGLE-LINE DIAGRAM & <br />PVE-2 ELECTRICAL CALCULATION <br />PVE-3 ELECTRICAL DATA & SPECIFICATIONS <br />SPECIFICATIONS <br />PVE-4 <br />PVE-5 BRANCH DIAGRAM <br />STRUCTURAL DRAWINGS <br />PVS-1 STRUCTURAL INFORMATION & <br />PVA-0 COVER SHEET <br />PVA-1 ARRAY LAYOUT <br />EQUINOX GROUNDING DETAILS <br />PV MOUNTING DETAILS <br />The scope of the plans is for the installation of the solar <br />photovoltaic system only and the approval is subject to <br />compliance with all applicable city and state codes and <br />regulations regarding construction. The approval of the plans <br />does not constitute any certification of the accuracy, <br />completeness, or building permit status of the existing buildings <br />and structures as shown. <br />Bldg# 101115919 <br />Approved by JLo <br />Elec# 20180364 <br />Issued 09/01/23 <br />1314 S Shawnee Dr <br />09/05/23