Laserfiche WebLink
COVER PAGE <br />AUTHORITIES HAVING JURISDICTION <br />BUILDING : CITY OF SANTA ANA <br />UTILITY : SCE <br /> NEW PHOTOVOLTAIC SYSTEM 37.92 KW DC <br /> 1323 E. ST. GERTRUDE PL, SUITE B SANTA ANA, CA 92705, USA <br />GENERAL NOTES VICINITY MAP <br />SATELLITE VIEW <br />SHEET INDEX <br />1.1.1 PROJECT NOTES: <br />1.1.2 THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE <br />CALIFORNIA ELECTRIC CODE (CEC) ARTICLE 690, ALL MANUFACTURERS’S <br />LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES <br />AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION’S (AHJ) <br />APPLICABLE CODES. <br />1.1.3 THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED <br />AND PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION <br />1.1.4 GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE IS <br />IN ACCORDANCE WITH CEC 690.41(B) <br />1.1.5 ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE <br />INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED <br />AND LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC <br />690.4: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 <br />CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 <br />COMBINER BOX(ES): UL 1703 OR UL 1741 ACCESSORY <br />1.1.6 MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED <br />TEMP COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE <br />CALCULATED ACCORDING TO CEC 690.7. <br />1.1.7 ALL INVERTERS, PHOTOVOLTAIC MODULES,PHOTOVOLTAIC <br />PANELS, AND SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A <br />PHOTOVOLTAIC POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR <br />THE APPLICATION PER 690.4 (D). SHALL BE INSTALLED ACCORDING TO <br />ANY INSTRUCTIONS FROM LISTING OR LABELING [CEC 110.3]. <br />1.1.8 ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL <br />BUILDING CODE. IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. <br />ALL PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE <br />CEC AND AHJ. <br />1.2.1 SCOPE OF WORK: <br />1.2.2 PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND <br />SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. <br />PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING <br />ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE <br />EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS <br />DETAILED IN THIS DOCUMENT <br /> ATTACHMENT TYPE: UNIRAC RM 5 RACKING <br /> MSP UPGRADE: NO <br />PROJECT INFORMATION <br />PROJECT <br />NAME: CENDOYA WAREHOUSE BLDG <br />SCOPE OF WORK <br />SYSTEM SIZE : STC : 96 X 395W= 37.92 kW DC <br /> PTC : 96 X 363.2W = 34.87 kW DC <br /> AC SIZE: 33 kW AC <br /> (96) JINKO SOLAR JKM395M-72HL-TV MODULES <br /> (1) SMA SUNNY TRIPOWER CORE1 STP50-US-41 INVERTER <br /> (96) SMA JMS - F RAPID SHUTDOWN DEVICE <br />DESIGN SPECIFICATION <br />OCCUPANCY: - GROUP B <br />CONSTRUCTION: - TYPE V-B <br />ZONING: - CITY OF SANTA ANA <br />GROUND SNOW LOAD - 0 PSF <br />WIND EXPOSURE - B <br />WIND SPEED - 100 MPH <br />RISK CATEGORY -II <br />APPLICABLE CODES & STANDARDS <br />BUILDING: CBC 2022, CRC 2022, CMC 2022 <br />ELECTRICAL: CEC 2022, CEBC 2022 <br />FIRE: CFC 2022 <br />RE <br />V <br /> <br />SHEET TITLE <br />DA <br />T <br />E <br />DE <br />S <br />C <br />R <br />I <br />P <br />T <br />I <br />O <br />N <br /> <br />RE <br />V <br />I <br />S <br />I <br />O <br />N <br />S <br /> <br />SI <br />G <br />N <br />A <br />T <br />U <br />R <br />E <br /> <br />W <br />I <br />T <br />H <br /> <br />S <br />E <br />A <br />L <br /> <br />PR <br />O <br />J <br />E <br />C <br />T <br /> <br />N <br />A <br />M <br />E <br /> <br />& <br /> <br />A <br />D <br />D <br />R <br />E <br />S <br />S <br />DRAWN DATE <br />DRAWN BY <br />08/16/2023 <br />JK <br />SHEET NUMBER <br />REVIEWED BY JVK <br />T-001 <br />CE <br />N <br />D <br />O <br />Y <br />A <br /> <br />W <br />A <br />R <br />E <br />H <br />O <br />U <br />S <br />E <br />BL <br />D <br />G <br />13 <br />2 <br />3 <br /> <br />E <br />. <br /> <br />S <br />T <br />. <br />GE <br />R <br />T <br />R <br />U <br />D <br />E <br /> <br />P <br />L <br />, <br /> <br />S <br />U <br />I <br />T <br />E <br />B <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br />92 <br />7 <br />0 <br />5 <br />, <br /> <br />U <br />S <br />A <br />A. <br />0 <br /> <br />01 <br />/ <br />2 <br />5 <br />/ <br />2 <br />0 <br />2 <br />3 <br />PE <br />R <br />M <br />I <br />T <br /> <br />P <br />L <br />A <br />N <br /> <br />TURNKEY SOLAR <br />7257 N MAPLE AVE #108 <br />FRESNO, CA 93720, USA <br />PHONE NO: (559) 321-8130 <br />LICENSE NO - 991046 <br />GREENTECH <br />RENEWABLES <br />B. <br />0 <br /> <br />07 <br />/ <br />1 <br />4 <br />/ <br />2 <br />0 <br />2 <br />3 <br /> <br />AH <br />J <br /> <br />R <br />E <br />V <br />I <br />S <br />I <br />O <br />N <br /> <br />CONTRACTOR <br />08 <br />/ <br />1 <br />6 <br />/ <br />2 <br />0 <br />2 <br />3 <br /> <br />C. <br />0 <br /> <br />AH <br />J <br /> <br />R <br />E <br />V <br />I <br />S <br />I <br />O <br />N <br /> <br />CONTRACTOR INFORMATION: <br />CONTRACTOR NAME: TURNKEY SOLAR <br />PROJECT MANAGER: LIZ BATZ <br />EMAIL: LIZ@TURNKEYENERGY.COM <br />PH: (559) 321-8130 <br />1.3.1 WORK INCLUDES: <br />1.3.2 PV RACKING SYSTEM INSTALLATION - UNIRAC RM 5 RACKING <br />1.3.3 PV MODULE AND INVERTER INSTALLATION - JINKO SOLAR <br />JKM395M-72HL-TVMODULE / SMA SUNNY TRIPOWER CORE1 <br />STP50-US-41INVERTER/SMA JMS - F RAPID SHUTDOWN DEVICE <br />1.3.4 PV EQUIPMENT ROOF MOUNT <br />1.3.5 PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX <br />1.3.6 PV LOAD CENTERS (IF INCLUDED) <br />1.3.7 PV METERING/MONITORING (IF INCLUDED) <br />1.3.8 PV DISCONNECTS <br />1.3.9 PV GROUNDING ELECTRODE & BONDING TO (E) GEC <br />1.3.10 PV FINAL COMMISSIONING <br />1.3.11 (E) ELECTRICAL EQUIPMENT RETROFIT FOR PV <br />1.3.12 SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE <br />COVER PAGET-001 <br />G-001 <br />A-101 SITE PLAN <br />RESOURCE DOCUMENTS <br />ELECTRICAL PLAN <br />ELECTRICAL CALCULATIONS <br />A-102 <br />E-602 <br />R-001 - R-005 <br />NOTES <br />PLACARDE-604 <br />WARNING LABELSE-603 <br />LINE DIAGRAME-601 <br />ATTACHMENT PLANA-103 <br />STRUCTURAL PLANA-104 <br />APN: 014-331-23 <br />B.0 <br />B.0 <br />Bldg# 101115120 <br />Issued 10/11/23 <br />Elec# 20179667 <br />Issued 10/12/23 <br /> <br />Approvals: <br />BLDG: JLo <br />ELEC: MSmith <br />PLNG: CSantana <br />1323 E St Gertrude Unit B - <br />101115120 & 20179667 <br />10/12/2023