Laserfiche WebLink
McPherson Engineering By: T.B. <br />Date: 11/1/22 <br />Gravity Loads: <br />DEMAND DECREASED BY 9.14% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 4.09% < 10% = OK! <br />Anchorage: <br />DEMAND OF 455.6LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />11/1/2022 2:48 PM <br />7 of 7 <br />©McPherson Engineering <br />1101 W 6th St <br />03/21/23