Laserfiche WebLink
McPherson Engineering By: L.Z. <br />Date: 9/6/22 <br />Gravity Loads: <br />DEMAND DECREASED BY 15.19% = OK! <br />Lateral Loads: <br />DEMAND INCREASED  BY 5.02% < 10% = OK! <br />Anchorage: <br />DEMAND OF 462.7LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />9/6/2022  4:50 PM <br />7 of 7 <br />©McPherson Engineering <br />1226 W Walnut St <br />04/10/23