Laserfiche WebLink
Project Information <br />Salem Residence <br />1230 W River Ln, <br />Santa Ana, CA 92706 <br />Date: November 11, 2022 <br />SHEET INDEX <br />PV-1 Plot Plan <br />PV-2.1 Stringing <br />PV-2.2 Single line diagram <br />PV-3 Array Layout <br />PV-4 Signage <br />Sheet <br /> 5-13 Additional Information <br /> Data sheets, <br /> Certifications... <br />SOLAR SOURCE INC 2954 E 14TH <br />ST, LONG BEACH, CA 90804 LIC#: <br />925231, CLASS - C46, C10 Lisense <br />Date 03/31/2023 <br />Existing <br />200A <br />175A <br />24 <br />24 <br />Q.PEAK DUO BLK-G10+ 365 <br />IQ8M-72-2-US <br />COVER <br />PROJECT NOTES <br />PROJECT MAP <br />1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL BE TESTED, LISTED <br />AND IDENTIFIED UL 1703. <br />2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL VENTS <br />3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED. <br />4. SOLAR INVERTER MUST HAVE A MANUFACTURE INSTALLED DISCONNECTING MEANS THAT <br />PREVENTS PARALLEL FEEDING UTILITY LINES DURING POWER OUTAGE. <br />5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT <br />THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE <br />PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS. <br />6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING SHALL BE PROTECTED FROM <br />ANY PHYSICAL DAMAGE. <br />7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT CIRCUITS OVER 150V TO GROUND <br />SHALL NOT BE <br />ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE ENERGIZED. <br />8 .INVERTER IS EQUIPPED W/ INTEGRATED GFDI, THUS PROVIDING GROUND FAULT <br />PROTECTION <br />9. ALL CONDUCTORS SHALL BE COPPER AND 75 DEG RATED <br />10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A RECOGNIZED ELECTRICAL TESTING <br />LABORATORY OR APPROVED BY THE DEPARTMENT. <br />11. CONDUITS SHOULD BE PAINTED TO MATCH EXISTING ROOF AND WALL COLORS <br />12.ALL WORK SHALL BE IN ACCORD WITH THE 2019 CBC, 2019 CEC AND 2017 NEC WITH <br />SPECIAL EMPHASIS ON ARTICLE 690 <br />13. THE OUTPUT OF A UTILITY INTERACTIVE-INVERTER SHALL BE PERMITTED TO BE <br />CONNECTED TO THE SUPPLY SIDE OF THE SERVICE DISCONNECTING <br />MEANS AS PER 230.82(6) <br />14. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED TO PERFORM THE MULTIPLE <br />FUNCTIONS OF DC GROUNDING, AC GROUNDING <br />AND BONDING BETWEEN AC AND DC SYSTEMS AS PER NEC 690.47(C) AND SIZED AS PER SEC <br />250.122 <br />15. EQUIPMENT GROUND CONDUCTOR REQUIRED IN RACEWAYS SIZED PER CEC 250-122. <br />16. PER ART 250.92. NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT SHALL BE <br />EFFECTIVELY BONDED TOGETHER. BOND BOTH ENDS OF RACEWAYS <br />GENERAL NOTES: <br />THIS INSTALLATION SHALL COMPLY WITH THE FOLLOWING CODES: <br />2019 CALIFORNIA ELECTRICAL CODE <br />2019 CALIFORNIA RESIDENTIAL CODE <br />2019 CALIFORNIA BUILDING CODE <br />2019 CALIFORNIA GREEN BUILDING STANDARDS CODE <br />2019 CALIFORNIA ENERGY CODE <br />2019 CALIFORNIA MECHANICAL CODE <br />2019 CALIFORNIA PLUMBING CODE <br />2019 CALIFORNIA FIRE CODE <br />ALL OTHER ORDINANCE ADOPTED BY THE LOCAL GOVERNING AGENCIES <br />project description <br />DC SOLAR PHOTOVOLTAIC SYSTEM <br />NUMBER OF SOLAR ARRAYS <br />TYPE OF INVERTERS <br />MAIN SERVICE PANEL <br />CONDUCTORS TYPE <br />CONDUITS TYPE ON ROOF <br />CONDUITS TYPE FROM EQUIPMENT <br />ROOF TYPE <br />ROOF RAFTERS <br />additional system info <br />AC CEC SOLAR SYSTEM SIZE <br />NUMBER OF SOLAR MODULES <br />NUMBER OF INVERTERS <br />SOLAR PANEL MODEL NUMBER <br />INVERTERS MODEL NUMBER <br />ADDITIONAL DC OPTIMIZER <br />MAIN SERVICE PANEL BUS <br />MAIN SERVICE PANEL MAIN C/B <br />NUMBER OF ROOF STORY <br />MAIN C/B LOCATION <br />PROPERTY DETAILS <br />APN <br />LIVING AREA <br />LOT AREA <br />PROPERTY TYPE <br />TYPE OF CONSTRUCTION <br />OCCUPANCY GROUP <br />code summary <br />additional notes space (if needed) <br />SPACE FOR STAMP <br />AND ADDITIONAL NOTES <br />FROM PLAN CHECK <br />N <br />FROM JUNCTION BOX TO ROOF EAVE <br />EMT TYPE CONDUIT WILL RUN OVER <br />THE ROOF AT 3 1/2" HEIGHT, THEN <br />UNDER THE EAVE TO PV EQUIPMENT <br />Roof access points shall be located in <br />areas that do not require the <br />placement of ground ladders over <br />openings such as window or doors, <br />and located at strong points of <br />building construction in locations <br />where the access point does not <br />conflict with overhead obstructions <br />such as tree limbs, wires, or signs. <br />8.760kW 7.971kW <br />2 <br />1 <br />MICRO <br />THWN-2 <br />EMT <br />EMT <br />00113618 <br />2,465 sqft <br />8,450 sqft <br />RESIDENTIAL <br />V-B <br />R-3 <br />50ATOTAL PV SIZE <br />NON CENTER2"x6" 24"O/C <br />SHINGLE <br />IRONRIDGEMOUNTING SYSTEM <br />N/A <br />BLDG # 101113165 ISS 12/15/22 <br />ELEC # 20178234 ISS 12/15/22 <br /> <br />The scope of the plans is for the installation <br />of the solar photovoltaic system only and <br />the approval is subject to compliance with <br />all applicable city and state codes and <br />regulations regarding construction. The <br />approval of the plans does not constitute <br />any certification of the accuracy, <br />completeness, or building permit status of <br />the existing buildings and structures as <br />shown. <br />1230 W River Ln <br />12/15/22