Laserfiche WebLink
McPherson Engineering By: T.C. <br />Date: 3/10/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 8.03% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 1.37% < 10% = OK! <br />Anchorage: <br />DEMAND OF 503.5LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 4FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />3/10/2023 10:57 AM <br />7 of 7 <br />©McPherson Engineering <br />1227 E 14th St <br />04/13/23