My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1327 S Joane Way - Plan
PBA
>
Building
>
ProjectDox
>
J
>
Joane Way
>
1327 S Joane Way
>
1327 S Joane Way - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 11:57:12 AM
Creation date
6/1/2025 11:57:02 AM
Metadata
Fields
Template:
Plan
Permit Number
20177827
101112596
Full Address
1327 S Joane Way
Document Relationships
101112596 - Permit
(Permit - Plan)
Path:
\Building\Permits\J\Joane Way\1327 S Joane Way
20177827 - Permit
(Permit - Plan)
Path:
\Building\Permits\J\Joane Way\1327 S Joane Way
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RAIL TO RAIL <br />BONDING #6 BARE <br />COPPER WIRE <br />INV <br />(IF USED) <br />MSP <br />CONTINUOUS <br />GROUND PER SLD <br />JBOX <br />GROUND <br />BUSHINGS <br />REQ. <br />MODULE <br />RAIL <br />SOLAR <br />METER <br />(IF REQ) <br />(A) <br />(1) BOND STRIP GROUNDS RAIL TO <br />RAIL SPLICES - STAR WASHERS USED <br />TO BOND RAIL TO BONDING STRIP <br />(2) SPLICE BAR, SELF-TAP SCREWS <br />JOIN RAILS. BONDING STRIPS USED <br />ON RAILS WITH GROUND LUGS. <br />(1) (2) <br />(3) <br />IF SPLICE BAR HAS INTEGRATED <br />GROUND, BONDING STRIP IS <br />NOT NECESSARY. <br />(3) WHERE NEITHER BONDING STRIP, INTEGRATED <br />GROUNDING SPLICE BAR, OR INTEGRATED <br />GROUNDING MIDCLAMP ARE USED, UL 2703 <br />APPROVED GROUND LUG WITH #6 BARE COPPER <br />SHALL BE USED TO GROUND SPLICED RAILS. <br />USE METHOD (2) <br />(1) <br />(C)RAIL SPLICE GROUNDING <br />(C) <br />#6 BARE <br />COPPER <br />RAIL <br />1 <br />RAIL <br />2 <br />EITHER METHOD 1-3 PER MANUFACTURERS INSTALL INSTRUCTIONS <br />CONDUIT <br />COMPRESSION <br />FITTING <br />LOCK NUT <br />GROUNDING <br />BUSHING <br />WITH LAY-IN LUG <br />ENCLOSURE <br />CONTINUOUS <br />GROUND <br />STRIP <br />INSULATION <br />CONDUIT GROUNDING DETAIL <br />EQUIPMENT GROUND <br />BUSHINGS REQ. FOR <br />SYSTEMS OVER 250V <br />A GROUNDING MID CLAMP <br />EACH GROUNDING MID CLAMP PIERCES THROUGH THE <br />ANODIZED COATINGS OF BOTH THE MODULE FRAME AND <br />THE MOUNTING RAIL TO FORM SECURE ELECTRICAL BONDS, <br />WHICH ARE REPEATED THROUGHOUT THE ARRAY AND AT <br />LEAST TWICE PER PANEL. MODULE SHALL BE GROUNDED <br />AT LEAST TWICE OVER WITH A MINIMUM OF TWO <br />MIDCLAMPS. <br />-EVEREST GROUNDING MID CLAMP WITH SERRATED TEETH <br />MIDCLAMP TEETH <br />MODULE PENETRATION MAX. UTILIZATION OF RAIL <br />WITH 1/4" SPACING <br />SERRATED T-BOLT BONDS <br />CLAMP TO RAIL <br />1327 S Joane Way <br />11/04/22
The URL can be used to link to this page
Your browser does not support the video tag.