Laserfiche WebLink
BE <br />T <br />T <br />E <br />R <br /> <br />E <br />A <br />R <br />T <br />H <br /> <br />E <br />L <br />E <br />C <br />T <br />R <br />I <br />C <br /> <br />I <br />N <br />C <br />. <br />16 <br />7 <br />2 <br />0 <br /> <br />M <br />A <br />R <br />Q <br />U <br />A <br />R <br />D <br />T <br /> <br />A <br />V <br />E <br /> <br />C <br />E <br />R <br />R <br />I <br />T <br />O <br />S <br />CE <br />R <br />R <br />I <br />T <br />O <br />S <br />, <br /> <br />C <br />A <br /> <br />9 <br />0 <br />7 <br />0 <br />3 <br />PH <br />O <br />N <br />E <br /> <br /># <br />: <br /> <br />( <br />8 <br />8 <br />8 <br />) <br /> <br />3 <br />7 <br />3 <br />- <br />9 <br />3 <br />7 <br />9 <br />LI <br />C <br /> <br /># <br />: <br /> <br />C <br />1 <br />0 <br />- <br />1 <br />0 <br />2 <br />4 <br />4 <br />6 <br />0 <br />MMINV <br />SCALE: 1/16" = 1' <br />SITE PLAN <br />N <br />(E) 200A MAIN SERVICE PANEL <br />(N)SOLAREDGE 3800H-US Non-RGM INVERTER <br />ROOF ACCESS POINT <br />PER CRC 2019 (R324.7.1) <br />ARRAY 3 - <br />(N)2 Canadian MODULES <br />TILT:23° <br />AZIMUTH: 91° <br />1) ALL EQUIPMENT SHALL BE INSTALLED IN <br />ACCORDANCE WITH THE MANUFACTURER'S <br />INSTALLATION INSTRUCTIONS. <br />2) ALL OUTDOOR EQUIPMENT SHALL BE RAIN TIGHT <br />WITH MINIMUM NEMA 3R RATING. <br />3) ALL LOCATIONS ARE APPROXIMATE AND REQUIRE <br />FIELD VERIFICATION. <br />4) THE SOLAR INSTALLATION SHALL NOT OBSTRUCT <br />ANY PLUMBING OR MECHANICAL VENTS. <br />5) A LADDER WILL BE IN PLACE FOR INSPECTIONS IN <br />COMPLIANCE WITH CAL OSHA REGULATIONS. <br />6) MODULE MOUNTING STRUCTURE WILL BE TIED <br />DIRECTLY INTO STRUCTURAL ELEMENTS OF SINGLE <br />FAMILY DWELLING ROOF TRUSSES / RAFTERS OR <br />BEAMS ACCORDING TO MOUNTING STRUCTURE <br />DIRECTIONS. <br />7) ROOF COVERING PENETRATIONS SHALL BE <br />DESIGNED, INSTALLED AND MAINTAINED IN <br />ACCORDANCE WITH BUILDING CODE AND THE <br />APPROVED MANUFACTURER'S INSTRUCTIONS SUCH <br />THAT THE ROOF COVERINGS SHALL SERVE TO <br />PROTECT THE BUILDING STRUCTURE. <br />8) CONDUIT, WIRING SYSTEMS AND RACEWAYS FOR <br />PHOTOVOLTAIC CIRCUITS SHALL BE LOCATED AS <br />CLOSE AS POSSIBLE TO THE RIDGE, HIP, OR VALLEY <br />AS DIRECTLY AS POSSIBLE TO POSSIBLE TO AN <br />OUTSIDE WALL TO REDUCE TRIP HAZARDS AND <br />MAXIMIZE VENTILATION OPPORTUNITIES. <br />SITE PLAN <br />P2 <br />(E) DRIVEWAY <br />(E)PROPERTY LINE <br />Nathan Draeger <br />REV: DESCRIPTION:BY: DATE: <br />DRAWING TITLE: <br />DESIGNER: <br />DESIGN MGR: <br />DWG PAGE: <br />ENGINEER OF RECORD <br />Tino Marufu <br />NE <br />W <br /> <br />P <br />V <br /> <br />S <br />Y <br />S <br />T <br />E <br />M <br />: <br /> <br />4 <br />, <br />6 <br />8 <br />0 <br /> <br />D <br />C <br /> <br />/ <br /> <br />3 <br />8 <br />0 <br />0 <br /> <br />A <br />C <br />Lo <br />r <br />e <br />n <br />z <br />o <br /> <br />A <br />b <br />r <br />e <br />g <br />o <br />1 <br />3 <br />0 <br />2 <br /> <br />E <br /> <br />1 <br />5 <br />t <br />h <br /> <br />S <br />t <br />, <br /> <br />S <br />a <br />n <br />t <br />a <br /> <br />A <br />n <br />a <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />1 <br />AP <br />N <br />: <br /> <br />4 <br />0 <br />0 <br />2 <br />3 <br />2 <br />1 <br />4 <br />1. 18. 2023 <br />1. 18. 2023 <br />DATE: TIME: <br />01:26 PM <br />01:26 PM <br />CONSTRUCTION NOTES <br />FIRE CODE PATHWAY <br />COMBO METER/MAIN <br />UTILITY METER <br />MAIN SERVICE PANEL <br />PRODUCTION METER <br />UM <br />MM <br />MSP <br />PV <br />INVERTER <br />SUB PANEL <br />AC DISCONNECT <br />AC LOAD CENTER <br />INV <br />SUB <br />ACL <br />AC <br />EV CHARGER <br />BATTERY BACKUP <br />BACKUP INTERFACE <br />BACKUP GATEWAY <br />EV <br />BB <br />BG <br />BI <br />MODULE STRINGING <br />3 <br />4" EMT CONDUIT <br />OPTIMIZER <br />JB JUNCTION BOX <br />LEGEND CALLOUTS <br />PROPERTY LINE <br />INSTALLER NOTES <br />UTILITY HAS 24 HR UNRESTICTED ACCESS TO ALL <br />PHOTOVOLTAIC SYSTEM COMPONENTS LOCATED AT <br />SERVICE ENTRANCE <br />WORKSPACE IN FRONT OF AC ELECTRICAL SYSTEM <br />COMPONENTS SHALL BE IN ACCORDANCE WITH APS <br />AND NEC REQUIREMENTS. FOR APS REQUIREMENTS, <br />REFERENCE SECTION 300 OF THE APS ESRM AND <br />SECTION 8.2 OF THE APS INTERCONNECTION <br />REQUIREMENTS <br />REFERENCE SECTION 301.15 OF THE APS ESMR FOR <br />ELECTRIC METER SEPERATION BETWEEN WATER AND <br />GAS <br />1 1 <br />4" PVC TRENCH <br />ARRAY 1 - <br />(N)7 Canadian MODULES <br />TILT: 23° <br />AZIMUTH: 181° <br />ARRAY 2 - <br />(N)3 Canadian MODULES <br />TILT: 23° <br />AZIMUTH: 271° <br />3'-0 <br />" <br />3'-0" <br />3'-0 <br />" <br />3' <br />-0 <br />" <br />1302 E 15th St <br />02/02/23