Laserfiche WebLink
QuickMount PV® <br />Classic Composition Mounting Instructions <br />Installation Tools Required: tape measure, roofing bar, chalk line, stud finder, caulking gun, 1 tube of appropriate sealant, drill with <br />7/32" bit, drill or impact gun with 1/2" deep socket. <br />WARNING: Quick Mount PV products are NOT designed for and should NOT be used to anchor fall protection equipment. <br />1 3 <br />Locate, choose, and mark centers of rafters to be Carefully lift composition roofshinglewith roofing Slide mount into desired position. Remove any <br />mounted. Select the courses of roofing where bar, just above placement ofQuick Mount.nails that prevent getting the mount flush with <br />Quick Mounts will be placed.front edge of shingle course. Mark center for <br />drilling. <br />Using drill with 7/32" bit, drill pilot hole into roof Clean off any sawdust, and fill hole with roof Slide mount back into position. Prepare hanger bolt <br />and after, taking care to drill square to the roof.manufacturer's approved sealant.with 1 hex nut and 1 sealing washer, insert through <br />Do not use mountas a drill guide.block into hole and drive hanger bolt into after, <br />tighteningtoasolid snugfit.* <br />8 You are now ready forthe rack of your <br />choice. Follow all the directions of <br />the rack manufacturer as well as the <br />module manufacturer. <br />All roofing manufacturers' written <br />instructions must also be followed <br />by anyone modifying a roof system. <br />Pleaseconsulttheroofmanufacturer's <br />specs and instructions prior to <br />touching the roof. <br />Insert EPDM rubber washer over hanger bolt into Using the rackkit hardware, securethe rack of your * It isnot necessaryoradvisableto use nailsorother <br />block.choice. Tighten to 13 foot pounds.fasteners to secure the perimeter of the flashing. <br />B17.2.3-7 <br />925-478-8269 • www.quickmountpv.com • info@quickmountpv.com <br />2700 Mitchell Dr., Bldg 2 • Walnut Creek, CA 94598 May-2012, Rev 2