Laserfiche WebLink
(M-19), Santa Ana, CA 92 <br />quests: (714) 667-2738 lns <br />Unit: <br />Block: NA <br />Bldg <br />Tractr 6 <br />CitY of Santa Ana 2o Civic center <br />Permit Counter: (714) 647-5800 lnspection <br />Project Address: 2602 N Alona St <br />Assessor's Parcel: 001-293-05 Lot: 64 <br />Owner: <br />Address <br />Leo Hwong <br />2502 N ALONA ST <br />Santa Ana, CA 927061/131 <br />(213) 709-s568 <br />Tenant Name: <br />Conlractor <br />Address: <br />Tesla Energy Operations <br />2102 Alton Parkway <br />lrvine, CA 92606 <br />(714) 496-0588 <br />State Lic #: 888104 <br />Lic Type: B, A, C-10, C-20, C46 <br />Bus. Lic #: 324801 <br />Workers' Compensation lnsurance:Carrier: Zurich American <br />Policy #: WC107458303 <br />Expires: 1ol3'll2o21 <br />Single Family Dwelling <br />Solar Roof <br />Solar Roof <br />Occupanc.y: <br />Constr Type <br />Code: <br />Planning Conditions <br />Plan Checked By <br />Permit lssued By <br />Subject to Field: <br />Smith, Mark <br />Amsden. Julie <br />03/ <br />0 <br />Buildins Permit #: 101 1 03086 <br />Every permil issued shall becofie invdlid unloss the wolk o, tl,e s/te <br />authonzed by such pennit is commenced wilhin360 days aftet ils <br />issuance, ot if the wod< authonzed on the site by such pemit is susponded <br />or abandoned fot o penod of360 days aftet tha hfie the woft is <br />commenced <br />lnspector MID#: 2020-157658 <br />Misc. Receipt: <br />Misc. Receipt: <br />Misc. Receipt: <br />Total <br />01 <br />01 <br />R-3, U <br />VB <br />cEc 2019 <br />20 <br />21 <br />u nt# <br />Electrical Permit #:'iO17O754 <br />Pin #: 915O7r Section: (714) 647-5853 <br />0 <br />Address Range: <br />Hisloric: No <br />Suite Range <br />Zonang: Rl <br />Foe Type <br />6002 51600 General Plan Update <br />6002 57770 Microfllm Records <br />Amount <br />23.79 <br />4.05 <br />Qty <br />000 <br />0.00 <br />Fee <br />- $0.00 <br />$0.00 <br />frr"D <br />2ot 7 z1+9 <br />Remove existing roo, malerials, install 2layers of new <br />underlayment ESR-3979, & new solar roof system. <br />"'lnstaller MUST obtain f33 roof-sheathing inspection <br />approval prior to roofing material install."* All fees <br />paid on #101103086 <br />$0.00 <br />$0.00 <br />$0.00 <br />Fee Total; <br />Paid to Datel <br />Balance Due: <br />Phone: <br />Building Use: <br />Job Type: <br />Nalure of Work: <br />Phone: <br />Planning Approval By:Date: <br />Date: <br />Dale: <br />Notes