Laserfiche WebLink
1. WHERE CONCEALED DUCT RUNS IN SOFFITS, JOIST BAYS, VERTICAL CHASES, OR <br />SHAFTS ARE OBSTRUCTED TO LESS THAN THE MINIMUM REQUIRED TO ALLOW THE <br />PASSAGE OF INDICATED ROUND DUCT, PROVIDE RECTANGULAR DUCTWORK OF <br />EQUIVALENT SIZE TO ALLOW PASSAGE OF THE DUCT RUN PAST THE OBSTRUCTION. <br />2. AN APPROVED SEISMIC GAS SHUTOFF VALVE SHALL BE INSTALLED ON THE FUEL <br />GAS LINE ON THE DOWN STREAM SIDE OF THE UTILITY METER AND BE RIGIDLY <br />CONNECTED TO THE EXTERIOR OF THE BUILDING OR STRUCTURE CONTAINING THE <br />FUEL GAS PIPING. <br />3. DRAWING SYMBOL REFERENCES ARE TYPICAL AND APPLY EQUALLY TO ALL SIMILAR <br />CONDITIONS UNLESS OTHERWISE NOTED OR OTHERWISE REFERENCED IN THE DESIGN <br />DRAWINGS. SEE THE SYMBOLS' LEGEND ON EACH SHEET FOR DEFINITION OF ALL <br />SYMBOLS USED IN THE DRAWINGS. <br />4. DETAIL REFERENCES ARE TYPICAL AND APPLY EQUALLY TO OTHER SIMILAR <br />CONDITIONS UNLESS OTHERWISE NOTED OR OTHERWISE REFERENCED IN THE DESIGN <br />DRAWINGS. <br />DO NOT DISREGARD UNREFERENCED OR MISREFERENCED DETAILS. SUCH DETAILS <br />SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND/OR OWNER FOR <br />INTERPRETATION OF APPLICABILITY & USAGE. <br />5. DO NOT SCALE DRAWINGS. <br />6.ALL DIMENSIONS SHALL BE VERIFIED IN FIELD. DISCREPANCIES SHALL BE BROUGHT <br />TO THE ATTENTION OF THE ARCHITECT AND/OR OWNER PRIOR TO PUTTING ANY <br />AFFECTED WORK IN PLACE. <br />7. WOOD FRAMED BUILDINGS: ALL EXTERIOR WALL DIMENSIONS ARE TO FACE OF <br />WOOD (FRAMING OR PLYWOOD SHEATHING WHERE OCCURS) UNLESS NOTED <br />OTHERWISE. <br />ALL INTERIOR WALL DIMENSIONS ARE TO FACE OF FRAMING UNLESS NOTED <br />OTHERWISE. DIMENSIONS NOTED OTHERWISE MAY BE NOTED AS ONE OF THE <br />FOLLOWING: <br />C.L. CENTERLINE <br />F.O.C. FACE OF CONCRETE <br />F.O.F. FACE OF FINISH <br />F.O.M. FACE OF MASONRY <br />CLR. FACE OF FINISH AND/OR OBSTRUCTION <br />8. ALL FINISHED GRADE AREAS AROUND BUILDINGS SHALL SLOPE AWAY FROM <br />BUILDINGS AT 2% MINIMUM. <br />9. PLUMBING FIXTURES ARE REQUIRED TO BE CONNECTED TO A SANITARY SEWER OR <br />AN APPROVED SEWAGE DISPOSAL SYSTEM. <br />10. KITCHEN SINKS, LAVATORIES, BATHTUBS, SHOWERS, BIDETS, LAUNDRY TUBS & <br />WASHING MACHINE OUTLETS SHALL BE PROVIDED WITH HOT & COLD WATER & <br />CONNECTED TO AN APPROVED WATER SUPPLY. <br />11. BATHTUB & SHOWER FLOORS, WALLS ABOVE THE BATHTUBS WITH A SHOWERHEAD <br />& SHOWERS SHALL BE FINISHED WITH A NONABSORBENT SURFACE. SUCH WALL <br />SURFACE SHALL EXTEND TO A HEIGHT OF NOT LESS THAN 72" ABOVE THE FLOOR. <br />12. PROVIDE A MINIMUM 70" HIGH APPROVED NON-ABSORBANT, SHATTER-RESISTANT <br />MATERIAL FOR SHOWER ENCLOSURES. <br />19B. VERTICAL DIMENSIONS ARE FROM TOP OF CONCRETE SLAB TO TOP OF PLATE <br />AND FROM TOP OF PLYWOOD FLOOR SHEATHING TO TOP OF PLATE UNLESS <br />OTHERWISE NOTED OR CALLED OUT IN THE DRAWINGS. <br />THE TERM "FINISH FLOOR" EXCLUDES ANY FLOORING MATERIALS THAT MAY BE <br />SCHEDULED AND MEANS THE TOP OF THE FINISHED CONSTRUCTION THAT IS TO <br />RECEIVE THE FLOORING MATERIALS SUCH AS TOP OF LEVEL CONCRETE SLAB OR TOP <br />OF LEVEL LIGHT WEIGHT FLOOR TOPPING. <br />20. VERIFY ALL BUILT-IN EQUIPMENT SIZES AND REQUIREMENTS PRIOR TO LAYOUT <br />AND CONSTRUCTION. BUILT-IN EQUIPMENT SHALL FIT TIGHTLY AS POSSIBLE WITHIN <br />MANUFACTURER'S REQUIRED TOLERANCES TO FINISHED OPENING. <br />21. HANDRAIL ASSEMBLIES AND GUARDS SHALL BE ABLE TO RESIST A SINGLE <br />CONCENTRATED LOAD OF 200 LBS. APPLIED IN ANY DIRECTION AT ANY POINT ALONG <br />THE TOP, AND HAVE ATTACHMENT DEVICES AND SUPPORTING STRUCTURE TO <br />TRANSFER THIS LOADING TO APPROPRIATE STRUCTURAL ELEMENTS OF THE BUILDING <br />PER 1607.7.1 AND 1607.7.1.1. <br />22. ALL CONCRETE SURFACES SHALL HAVE A LIGHT BROOM FINISHED, NON-SLIP <br />SURFACE UNLESS NOTED OTHERWISE. <br />23. PROVIDE GALVANIC ISOLATION BETWEEN DISSIMILAR METALS. <br />24.ALL PIPING IN CONNECTION WITH A PLUMBING SYSTEM SHALL BE SO INSTALLED <br />THAT PIPING OR CONNECTIONS WILL NOT BE SUBJECT TO UNDUE STRAINS OR <br />STRESSES, AND PROVISIONS SHALL BE MADE FOR EXPANSION, CONTRACTION, AND <br />STRUCTURAL SETTLEMENT. NO PIPING SHALL BE DIRECTLY EMBEDDED IN CONCRETE <br />OR MASONRY. NO STRUCTURAL MEMBER SHALL BE SERIOUSLY WEAKENED OR <br />IMPAIRED BY CUTTING, NOTCHING OR OTHERWISE. <br />25. AT LOCATIONS TO RECEIVE BUILT-IN CASEWORK, FIELD VERIFY ALL CLEAR <br />OPENINGS OF CONSTRUCTION AND ADDRESS IN SHOP DRAWINGS BEFORE <br />FABRICATION OF CASEWORK. <br />26. VERIFY ALL EQUIPMENT SIZES BEFORE FABRICATION OF CASEWORK. <br />RESIDENTIAL-TYPE AND BUILT-IN KITCHEN EQUIPMENT/APPLIANCES (REFRIGERATOR, <br />RANGE, MICROWAVE, ETC.) AND ALL OTHER BUILT-IN TYPE EQUIPMENT SHALL FIT <br />TIGHTLY AS POSSIBLE WITHIN EQUIPMENT/ APPLIANCE MANUFACTURER'S <br />REQUIREMENTS TO CASEWORK OPENINGS. <br />27. CASEWORK SHALL BE PROVIDED WITH REQUIRED HOLES, AND ACCESS PANELS <br />FOR ELECTRICAL CABLES, PIPES, AND LIKE PENETRATING ITEMS. <br />28. IN NEW CONSTRUCTION CARBON MONOXIDE/SMOKE DETECTORS SHALL RECEIVE <br />THEIR PRIMARY POWER SOURCE FROM THE BUILDING WIRING & SHALL BE EQUIPPED <br />WITH BATTERY BACK UP & LOW BATTERY SIGNAL. SMOKE ALARMS SHALL BE LOCATED <br />IN EACH SLEEPING ROOM, HALLWAY OR AREA GIVING ACCESS TO A SLEEPING ROOM, <br />AND ON EACH STORY AND BASEMENT FOR DWELLINGS WITH MORE THAN ONE STORY. <br />DETECTORS SHALL BE INTERCONNECTED SO THAT ACTUATION OF ONE ALARM WILL <br />ACTIVATE ALL THE ALARMS WITHIN THE INDIVIDUAL DWELLING UNIT. <br />29. STORAGE TYPE WATER HEATERS SHALL BE STRAPPED TO THE WALL (INTO 2x <br />BLOCKING), PER CODE. <br />30. BUILDING SHALL HAVE APPROVED ADDRESS NUMBERS, BUILDING NUMBERS OR <br />APPROVED BUILDING IDENTIFICATION PLACED IN A POSITION THAT IS PLAINLY LEGIBLE <br />& VISIBLE FROM THE STREET OR ROAD FRONTING THE PROPERTY. <br />31. DUCTS PENETRATING THE WALLS OR CEILINGS SEPARATING THE DWELLING FROM <br />THE GARAGE SHALL BE CONSTRUCTED OF A MINIMUM No.26 GAUGE SHEET STEEL OR <br />OTHER APPROVED MATERIAL & THERE SHALL BE NO OPENINGS FROM THE DUCT INTO <br />THE GARAGE. <br />32. OTHER PENETRATIONS OF GARAGE/DWELLING CEILINGS & WALLS ARE TO BE <br />PROTECTED AS REQUIRED FOR ONE HOUR ASSEMBLY <br />33. HEATER SHALL BE CAPABLE OF MAINTAINING A MINIMUM ROOM TEMPERATURE OF <br />68°F AT A POINT 3' ABOVE THE FLOOR 7 2' FROM EXTERIOR WALLS IN ALL HABITABLE <br />ROOMS AT THE DESIGN TEMPERATURE. <br />ENERGY AND WATER CONSERVATION <br />1. CAULK AND SEAL AROUND ALL PLUMBING AND ELECTRICAL PENETRATIONS INTO <br />THE BUILDING ENVELOPE. <br />2. CAULK AND SEAL AROUND ALL WINDOW AND DOOR FRAMES, BETWEEN WALL SOLE <br />PLATES AND FLOORS, AND BETWEEN EXTERIOR WALL PANELS. SEE TYPICAL EXTERIOR <br />WALL MEASURES. <br />3. ALL INSULATION MATERIALS SHALL BE CERTIFIED BY THE MANUFACTURER AS <br />COMPLYING WITH THE CALIFORNIA QUALITY STANDARDS FOR INSULATING MATERIAL. <br />4. DOORS AND WINDOWS BETWEEN CONDITIONED SPACE AND OUTSIDE SPACE OR <br />BETWEEN CONDITIONED SPACE & UNCONDITIONED SPACE SHALL BE FULLY <br />WEATHER-STRIPPED. <br />5. MANUFACTURED DOORS AND WINDOWS SHALL BE CERTIFIED AND LABELED IN <br />COMPLIANCE WITH THE APPROPRIATE INFILTRATION STANDARDS. ALL EXTERIOR <br />OPENINGS SHALL BE PROPERLY WEATHERSTRIPPED, CERTIFIED, AND LABELED. <br />6. DUCTS SHALL BE CONSTRUCTED, INSTALLED, AND INSULATED PER THE <br />REQUIREMENTS OF THE U.M.C. ALL JOINTS OF THE DUCT SYSTEM SHALL BE TIGHTLY <br />SEALED WITH MASTIC OR TAPE SUITABLE FOR THE PURPOSE. <br />7. ALL SPACE CONDITIONING EQUIPMENT SHALL BE C.E.C. CERTIFIED. <br />8.ALL WATER HEATING EQUIPMENT, SHOWER HEADS, FAUCETS, AND PLUMBING <br />FIXTURES SHALL BE C.E.C. CERTIFIED UNLESS OTHERWISE NOTED OR APPROVED. <br />SHOWER HEADS SHALL BE LOW FLOW TYPE. <br />9. GENERAL LIGHTING IN KITCHENS AND BATHROOMS SHALL HAVE A MINIMUM OF 40 <br />LUMENS/WATT EFFICIENCY (FLUORESCENT LIGHTS OR LED WITH 3000 KELVIN MAX). <br />10. PROVIDE ULTRA FLUSH WATER CLOSETS FOR ALL NEW CONSTRUCTION. EXISTING <br />SHOWER HEADS AND TOILETS MUST BE ADAPTED FOR LOW WATER CONSUMPTION. <br />SCHEDULE IS IMPACTED BY OWNER RELATED CHANGES OR REQUESTS. <br />AT THE TIME OF PRICING & PROIR TO CONSTRUCTION PROCEEDING. <br />THAT ALL REQUIRED CLEARANCE FOR INSTALLATION AND <br />TO INCLUDE ALL PIPING, DUCT WORK AND CONDUITS) <br />LIGHTING, PLUMBING AND SPRINKLER EQUIPMENT <br />OF ANY AND ALL MECHANICAL, TELEPHONE, ELECTRICAL, <br />ANY CONFLICTS PRIOR TO CONSTRUCTION THAT EXIST IN LOCATIONS <br />3. GENERAL CONTRACTOR SHALL INFORM ARCHITECT OF <br />PROCEEDING WITH WORK OR RELATED WORK IN QUESTION. <br />OBTAINING A CLARIFICATION FROM ARCHITECT BEFORE <br />QUESTIONS, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR <br />QUESTIONS REGARDING THESE OR OTHER COORDINATION <br />BEFORE PROCEEDING WITH CONSTRUCTION. IF THERE ARE ANY <br />ACCURACY AND CONFIRMING WORK IS BUILDABLE AS SHOWN <br />CONTRACT DOCUMENTS, FIELD CONDITIONS AND DIMENSIONS FOR <br />1. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CHECKING <br />MAINTENANCE OF ABOVE EQUIPMENT ARE PROVIDED. <br />AND DETAILS. <br />CONNECTION WITH THE WORK. <br />REQUIREMENTS. <br />CONTRACTORS WORK. <br />DISCIPLINE OF ALL WORKERS ON THE PROJECT. <br />ALL OVERTIME COSTS EXCEPT WHEN THE APPROVED CONSTRUCTION <br />4. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING <br />DOCUMENTS SHALL BE FURNISHED AND INSTALLED IN <br />6. ALL WORK NOT SPECIFICALLY COVERED IN THE CONSTRUCTION <br />MAINTAINING, AND SUPERVISING ALL SAFETY PRECAUTIONS IN <br />GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, <br />PROPERTY DAMAGE FOR THE LIMITS AS REQUIRED BY LAW. THE <br />RESPECT TO WORKMAN'S COMPENSATION, PUBLIC LIABILITY AND <br />PURCHASE AND MAINTAIN CERTIFICATIONS OF INSURANCE WITH <br />5. THE GENERAL CONTRACTOR AND SUBCONTRACTORS SHALL <br />REGULATORY AGENCIES, APPLICABLE BUILDING CODES AND <br />ALL WORK AND MATERIALS IN ACCORDANCE WITH ALL LOCAL <br />13. GENERAL CONTRACTOR SHALL HAVE ON-SITE, THE APPROVED <br />AND THE OBTAINING OF A FINAL CERTIFICATE OF OCCUPANCY. <br />DEPARTMENT INSPECTIONS AND APPROVALS IN ALL FIELDS OF HIS WORK, <br />OF WORK, THE REQUESTING AND COORDINATION OF BUILDING <br />REQUIRED PERMITS PRIOR TO COMMENCEMENT <br />12. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL <br />SECURITY OF PROJECT AND SHALL BE RESPONSIBLE FOR <br />11. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR <br />8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY AND <br />CONSTRUCTION TIME FOR ALL SUBCONTRACTORS AND GENERAL <br />SPECIFIC CONSTRUCTION SCHEDULE INDICATING THE REQUIRED <br />CONTRACTOR SHALL ALSO SUBMIT A SCHEDULE OF VALUES AND A <br />7. UPON SUBMITTAL OF CONSTRUCTION COSTS, THE GENERAL <br />ACCORDANCE WITH BUILDING STANDARD MATERIALS <br />PERSONNEL.) <br />CONSTRUCTION DRAWINGS AND BUILDING PERMIT. <br />ASSISTANCE AND COORDINATION OF VARIOUS TRADES. <br />COMPLETION. <br />SUCH INSTALLATION. <br />JOB INCLUDING REVISIONS. <br />CONTRACTOR SHALL COORDINATE AND COOPERATE TO EFFECT <br />AND/OR EQUIPMENT SHALL BE PROVIDED BY OTHERS. <br />15. WHERE WORK OR EQUIPMENT IS INDICATED N.I.C., SUCH WORK <br />SHALL SUBMIT CERTIFICATES OF INSPECTION OF SATISFACTORY <br />20. UPON COMPLETION OF THE JOB, THE GENERAL CONTRACTOR <br />RESPONSIBILITY AT ALL TIMES DURING THE PROGRESS OF THE <br />DRAWINGS TO ALL TRADES FALLING UNDER THEIR <br />CONTRACTOR TO DISTRIBUTE ADEQUATE COPIES OF ALL <br />19. IT SHALL BE THE RESPONSIBILITY OF THE GENERAL <br />AND NOTIFICATION SHALL BE MADE PRIOR TO INSTALLATION. <br />USED, IT SHALL BE BY JUDGEMENT AND APPROVAL OF THE ARCHITECT <br />MANUFACTURERS ARE SPECIFIED. WHERE APPROVED EQUAL IS <br />SUBSTITUTIONS FOR ANY MATERIAL WHERE SPECIFIC <br />18. THE CONTRACTOR SHALL NOTE THAT THERE SHALL NOT BE <br />CUTTING AND RUBBISH REMOVAL WITH BUILDING MANAGEMENT <br />BUILDING MANAGEMENT PERSONNEL. (I.E.: DEMOLITION, <br />17. GENERAL CONTRACTOR SHALL COORDINATE ANY OVERTIME WITH <br />14. THE GENERAL CONTRACTOR SHALL PROVIDE ALL SUPERVISION, <br />BROUGHT TO THE ATTENTION OF THE ARCHITECT & THE OWNER <br />16. DISCREPANCIES FOUND BETWEEN NOTES AND DRAWINGS SHALL BE <br />GENERAL NOTES - PART B <br />FURTHERMORE, FOR EXISTING CONDITIONS ON REMODEL/ADDITIONS, <br />THE ARCHITECT CANNOT REALISTICALLY VERIFY ALL EXISTING <br />CONDITIONS ACCURATELY. AS SUCH THE PREPARATION OF <br />CONSTRUCTION DOCUMENTS ARE BASED ON TYPE V WOOD FRAME <br />CONSTRUCTION FOR CONVENTIONAL FRAMING AND WHERE THE <br />GENERAL CONTRACTOR MAY DISCOVER SOME DISCREPANCIES IN THE <br />ARCHTIECT AND ENGINEERS DESIGN WITH RESPECT TO THE NEW FOUND <br />EXISTING CONDITIONS ON SITE. THESE DISCPREPANCIES ARE EXPECTED <br />AND A NATURAL PROCESS BECAUSE ARCHITECTURE SERVICES PRECEDES <br />DEMOLITION OF THE PROJECT. GENERAL CONTRACTOR SHALL NOTIFY <br />THE ARCHITECT AND/OR ENGINEER IF ANY OF THE DESIGN IS IN <br />CONFLICT WITH THE EXISTING CONDITIONS. <br />10.NOT USED <br />THESE ARE GENERAL NOTES AND SOME ITEMS MAY <br />NOT APPLY TO THE SPECIFIC SCOPE. G.C. SHALL IN <br />THE BEST OF JUDGEMENT, APPLY ITEMS THAT ARE <br />RELEVANT TO THE SCOPE DISPLAYED IN THE <br />DRAWINGS. <br />FOR REMODELS/ADDITIONS, IN CASES WHERE A LAND SURVEY WAS NOT <br />PERFORMED EITHER BECAUSE IT WAS NOT REQUIRED AND/OR CLIENT HAS <br />NOT ELECTED TO FURNISH A SURVEY, ARCHITECT SHALL BASE SITE <br />PROPERTY MEASUREMENTS FROM PERCEIVED PROPERTY LINES <br />REPRESENTED BY FENCES, WALLS AND PLANTINGS. EVERY EFFORT WILL BE <br />MADE TO PROVIDE AN ACCURATE MEASUREMENT HOWEVER SUCH <br />MEASUREMENT CANNOT GUARANTEE ACCURACY DURING CONSTRUCTION. <br />AS SUCH, IT IS UNDERSTOOD BY ALL PARTIES, OWNER, ARCHITECT, AND <br />GENERAL CONTRACTOR, THAT DISCREPANCIES ARE POSSIBLE AND AT NO <br />FAULT TO ANY PARTY. CLIENT MAY INCUR A MINOR CHANGE ORDER DUE TO <br />THIS EVENT DUE TO ADJUSTMENTS IN THE DESIGN AFTER PERMIT. <br />MATERIAL SPECIFICATIONS <br />G.CHARLES DESIGN OFFERS ARCHITECTURE SERVICES WHERE A MAJORITY <br />OF THE PACKAGES ARE BASED ON 'MINIMALLY TO PROCURE A BUILDING <br />PERMIT'. THE PACKAGES ARE BASED ON THE MINIMUM REQUIREMENTS OF <br />THE BUILDING CODES IN PLACE AT EACH JURISDICTION AND WHICH ARE <br />LARGELY BASED ON MAINTAINING PUBLIC SAFETY. <br />BECAUSE OUR CONSTRUCTION DRAWING PACKAGES ARE BASED ON MINIMUM <br />REQUIREMENTS ESTABLISHED BY EACH BUILDING DEPARTMENT, OUR <br />DETAILS ARE GENERAL AND MAY BE ADAPTED AND/OR APPLIED TO A VARIETY <br />OF FIELD CONDITIONS. IN SOME CASES, OUR DRAWINGS WILL INDICATE <br />MATERIAL SPECIFICATIONS FOR ITEMS SUCH AS WATER PROOF MEMBRANES <br />THAT HELP PROTECT FROM WATER PENETRATION. IF SUCH ITEMS ARE NOT <br />FOUND IN OUR SHEET SET, OR ARE UNCLEAR, THE GENERAL CONTRACTOR <br />SHALL NOTIFY THE ARCHITECT TO REQUEST A DETAIL AND/OR A <br />SPECIFICATION. IN ALL CIRCUMSTANCES, THE GENERAL CONTRACTOR <br />SHALL UTILIZE GOOD JUDGEMENT OF THE INSTALLATION OF VARIOUS <br />MATERIALS. <br />AS SUCH, ALL INSTALLATIONS SHALL BE COMPLETED WITH STRICT <br />CONFORMANCE WITH MANUFACTURER'S RECOMMENDATIONS, WRITTEN <br />INSTRUCTIONS, INDUSTRY STANDARDS, AND BUILDING CODES. <br />GCD 2018 <br />GENERAL NOTES - PART A / MEANS METHODS SEQUENCES, AND TECHNIQUE <br />21. WORK SHALL COMPLY WITH ALL LAWS, RULES AND REGULATIONS <br />AS REQUIRED BY THE STATE OF CALIFORNIA, THE COUNTY OF LOS <br />ANGELES, THE CITY OF LOS ANGELES, AND ANY AND ALL OTHER <br />GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE WORK. <br />THIS WILL APPLY TO ANY OTHER JURISDICTIONS SPECIFIC TO THE <br />PROJECT SITE LOCATION OUTSIDE OF THE GREATER COUNTY OF LOS <br />ANGELES. <br />22. WORK SHALL COMPLY WITH THE MODEL CODES AS ADOPTED BY <br />LOCAL JURISDICTION, TO INCLUDE, BUT NOT LIMITED TO, (CITY OF LOS <br />ANGELES BUILDING CODE, CALIFORNIA BUILDING CODE, INTERNATIONAL <br />BUILDING CODE, CALIFORNIA RESIDENTIAL CODE, CALIFORNIA GREEN <br />BUILDING STANDARDS, UNIFORM MECHANICAL CODE, UNIFORM <br />PLUMBING CODE, NATIONAL ELECTRICAL CODE, ETC.) LOCALLY IN <br />FORCE AT THE TIME OF BUILDING PERMIT ISSUANCE, INCLUDING ALL <br />REVISIONS AND AMENDMENTS ADOPTED BY THE GOVERNING <br />JURISDICTION(S). <br />WHERE REFERENCE IS MADE TO MODEL CODE SECTIONS AND PARTS, <br />THE CONTRACTOR SHALL BECOME FAMILIAR WITH THE MODEL CODE <br />SECTIONS AND PARTS CITED PRIOR TO INSTALLATION OF ANY <br />AFFECTED WORK. <br />23. FULLY REVIEW THE ENTIRE SET OF CONSTRUCTION DOCUMENTS <br />PRIOR TO CONSTRUCTION. THE CONSTRUCTION DOCUMENTS MAY <br />INCLUDE THE FOLLOWING: <br />CIVIL DRAWINGS, DESIGN DRAWINGS, STRUCTURAL DRAWINGS, <br />MECHANICAL DRAWINGS <br />PLUMBING DRAWINGS, ELECTRICAL DRAWINGS, SECURITY SYSTEM <br />DRAWINGS AND SPECIFICATIONS (DEFERRED SUBMITTAL), FIRE <br />PROTECTION SHOP DRAWINGS AND SPECIFICATIONS (DEFERRED <br />SUBMITTAL) <br />24. WHERE CONFLICT OCCURS BETWEEN THE DRAWINGS OF ANY OF <br />THE DESIGN DISCIPLINES INVOLVED, THE MOST RESTRICTIVE <br />INTERPRETATION WILL GOVERN THE WORK. ARCHITECT AND/OR <br />OWNER WILL RESOLVE DESIGN CONFLICTS BASED ON THE DESIGN <br />INTENT. <br />25. COORDINATE ALL CHANGES AND ADJUSTMENTS TO THE WORK <br />WHICH VARY FROM THE CONSTRUCTION DOCUMENTS WITH ARCHITECT <br />AND/OR PRIOR TO PUTTING WORK IN PLACE. <br />26. ALL PRODUCT AND COMPONENT BRANDS AND TRADEMARKS NAMED <br />ARE USED TO SET THE LEVEL OF QUALITY REQUIRED FOR THE WORK <br />AND ARE UNDERSTOOD TO BE "OR EQUAL" REFERENCES SUBJECT TO <br />THE FORMAL APPROVAL PROCESS AS DESCRIBED AND SET FORTH IN <br />THE SPECIFICATIONS UNLESS NOTED OTHERWISE. <br />27.THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK, USING <br />CONTRACTOR'S BEST SKILL AND ATTENTION. THE CONTRACTOR SHALL <br />BE SOLELY RESPONSIBLE FOR, AND HAVE CONTROL OVER, <br />CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND <br />PROCEDURES AND FOR COORDINATING ALL PORTIONS OF THE WORK <br />UNDER THE CONTRACT, UNLESS THE CONTRACT DOCUMENTS GIVE <br />OTHER SPECIFIC INSTRUCTIONS CONCERNING THESE MATTERS. <br />13. MATERIAL SHALL BE JOINED TO UNIFORM, ACCURATE FITS SO THEY MEET WITH <br />NEAT, STRAIGHT LINES, FREE OF SMEARS, OVERLAPS AND IMPERFECTIONS. INSTALL <br />EXPOSED MATERIALS . APPROPRIATELY LEVEL, PLUM AND AT RIGHT ANGLES OR FLUSH <br />WITH ADJOINING MATERIALS. WORK OF EACH TRADE SHALL MEET OR EXCEED ALL <br />NATIONAL STANDARDS PUBLISHED BY THAT TRADE EXCEPT WHERE THE CONTRACT <br />DOCUMENTS ARE MORE STRINGENT. IN SUCH CASES, WORK SHALL MEET OR EXCEED <br />THE STANDARDS ESTABLISHED BY THE CONTRACT DOCUMENTS. <br />14.THE CONTRACTOR SHALL , AT ALL TIMES, KEEP PREMISES FREE FROM <br />ACCUMULATION OF DEBRIS CAUSED BY HIS OPERATIONS/WORK. <br />15.THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING ANY <br />DEFECTS FOUND IN EXISTING BASE BUILDING CONSTRUCTION WHICH INTERFACES WITH <br />NEW CONSTRUCTION. THIS INCLUDES BUT IS NOT LIMITED TO, UNEVEN SURFACES AND <br />FINISHES AT PLASTER OR GYPSUM BOARD. THE GENERAL CONTRACTOR SHALL PATCH <br />AND REPAIR SURFACES TO MATCH ADJACENT ADJOINING SURFACES. <br />28.CONTRACTOR MAY MAKE MINOR CHANGES IN THE WORK <br />AUTHORIZED BY THE ARCHITECT IN ACCORDANCE THE SPECIFICATIONS <br />AND SUBMITTALS. THE CONTRACTOR MAY MAKE SUBSTITUTIONS ONLY <br />WITH THE CONSENT OF THE OWNER, AFTER EVALUATION BY THE <br />ARCHITECT AND IN ACCORDANCE WITH A CHANGE ORDER OR CHANGE <br />DIRECTIVE. <br />16. GENERAL CONTRACTOR TO VERIFY SIZES OF BUILDING ACCESS OPENINGS BEFORE <br />PROCEEDING WITH WORK. <br />17.UPON COMPLETION OF THE JOB, GENERAL CONTRACTOR SHALL CLEAN ENTIRE AREA <br />, INCLUDING GLASS, CARPET, AND ALL OTHER FINISHED SURFACES IN A MANNER <br />ACCEPTABLE TO OWNER. <br />18.GENERAL CONTRACTOR IS RESPONSIBLE FOR DISPOSING OF OFF SITE PACKAGING <br />CARTONS OR CONTAINERS, TRASH AND DEBRIS IN A SAFE, ACCEPTABLE MANNER, AND <br />TO NO COST OR INCONVENIENCE TO OTHER PARTIES. <br />19.GENERAL CONTRACTOR SHALL PROVIDE PROTECTIVE COVERINGS FOR CARPET, <br />FURNISHINGS AND EXISTING FINISHES IN AREAS OF DEMOLITION AND CONSTRUCTION <br />AND SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE CAUSED BY THE WORK <br />OF THE GENERAL CONTRACTOR AND ANY SUBCONTRACTOR. <br />CONSTRUCTION SITE PROTOCOL FOR GENERAL CONTRACTOR <br />CONTRACTOR IS RESPONSIBLE FOR HAVING THE ORIGINAL <br />APPROVED SET ON SITE AT ALL TIMES, AND ANY COPIES ARE <br />REQUIRED TO BE FROM THE ORIGINAL FINAL SET OF PLANS. <br />CONTRACTOR SHOULD NOT UN-STAPLE ANY BINDED SETS. <br />9.NOT USED <br />Scale <br />Project number <br />Date <br />Drawn by <br />A-0.1 <br />GENERAL <br />NOTES <br />37-23 <br />08/2024 <br />JENNY PARADA <br />613 S EASTBURY AVE, <br />COVINA CA 91723 <br />No.Description Date <br />jenny_parada@verizon.net <br />Owner <br />Address <br />NANCY CALTAGIRONE <br />Main House: <br />1506 E CLEMENSEN AVE <br />SANTA ANA, CA 92705 <br />ADU: <br />1506 E CLEMENSEN AVE # 2 <br />SANTA ANA, CA 92705 <br />PHONE: <br />714-997-0313 <br />1506 E Clemensen Ave & <br />#212/12/2024