Laserfiche WebLink
SHEET TITLE <br />SHEET NUMBER <br />OWNER <br />PROJECT TITLE <br />JOBSITE ADDRESS <br />GARIBAY <br />RESIDENCE <br />1 401 <br />W SANTA <br />CLARA AVE <br />SANTA ANA, CA <br />92706 <br />CONTRACTOR <br />820 THOMPSON AVE, UNIT 28 <br />GLENDALE CA 91201 <br />PHONE: 818-634-6527 <br />C10 CA LICENSE # 978687 <br />LA POWER CENTER <br />CORPORATION <br />ARMIN GHARIBIAN SAKI, LICENSE HOLDER <br />DATE DESCRIPTION <br />REVISION <br />DATE <br />DRAWN08-18-22 DESIGN <br />REVISION <br />DESIGN BY: LG/SC <br />CAD <br />F O R C A L I I N C . <br />SHELLEY V CALUAG <br />cadforcali@gmail.com <br />323-698-4207 <br />5.600 DC kW <br />5.045 kW CEC-AC Rating <br />MICRO INVERTER SYSTEM <br />A0 <br />PROJECT INFO <br />VICINITY MAP <br />PV NOTES <br />ARRAY AREA: 20.41 SQFT x 19 = 387.84 SQFT <br />PROJECT SCOPE <br />INSTALLATION OF ROOF MOUNT SOLAR PV SYSTEM <br />PV EQUIPMENT QTY MODEL NO AND MANUFACTURER <br />MODULES:14 400W Q.PEAK DUO BLK ML-G10+ 400 <br />HANHWA Q.CELL MODULES <br />INVERTER:14 IQ7PLUS-72-2-US (240V) <br />ENPHASE MICRO INVERTERS <br />SYSTEM SIZE: 5.600 DC kW RATING <br />5.045 CEC AC RATINGVICINITY MAP <br />PROJECT SITE <br />OWNER: OSCAR GARIBAY <br />ADDRESS:1401 W SANTA CLARA AVE <br />SANTA ANA, CA 92706 <br />PHONE: 530-746-8077 <br />EMAIL: OSCARGARIBAY92@GMAIL.COM <br />APN:00127203 <br />(ORANGE COUNTY) <br />UTILITY: SCE <br />SHEET INDEX <br />A0 VICINITY MAP, PROJECT INFO, PV NOTES <br />A1 SITE PLAN <br />A2 MOUNTING PLAN <br />E1 SINGLE LINE DIAGRAM <br />E2 ELECTRICAL CALCULATIONS <br />E3 REQUIRED SIGNAGE <br />E4 MODULE DATA SHEET <br />E5 - E5.1 INVERTER DATA SHEET & CERTIFICATION <br />E6 OPTIMIZER DATA SHEET <br />S1-S1.1 STANCHION DATA SHEET <br />S2 RACKING DATA SHEET <br />S3 RACKING ENGINEERING <br />S4 RACKING GROUNDING <br />S5 RACKING CERTIFICATION <br />5.600 DC KW SOLAR PV MICRO INVERTER SYSTEM - ROOF MOUNT <br />GARIBAY RESIDENCE <br />1401 W SANTA CLARA AVE SANTA ANA, CA 92706 <br />AERIAL VIEW <br />SOLAR PHOTOVOLTAIC SYSTEM NOTES <br />1. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED TESTING LABORATORY AND INSTALLED PER THE <br />LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS, CEC 110.2, 110.3, 690.4(B) AND 690.12(D). <br />2. ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND <br />SWITCHES. <br />3. ALL EQUIPMENT SHALL BE PROPERLY GROUNDED AND BONDED IN ACCORDANCE WITH CEC ARTICLE 250. <br />4. ALL PV CIRCUITS CONNECTED TO MORE THAN ONE SOURCE SHALL HAVE PROTECTION AGAINST OVERCURRENT PER <br />CEC 690.9. <br />5. DISCONNECTING MEANS OF THE PV SYSTEM (INCLUDING RAPID SHUTDOWN INITIATION) SHALL BE LOCATED IN READILY <br />ACCESSIBLE LOCATION NEAR THE EQUIPMENT, CEC 690.13, 690.15. <br />6. ENERGY STORAGE SYSTEMS TERMINALS LOCATED MORE THAN 5 FEET AWAY OR ON OPPOSITE SIDE OF WALL FROM <br />CONNECTED EQUIPMENT MUST HAVE DISCONNECTING MEANS IN ACCORDANCE WITH CEC 706.7(E) AND LABELED PER <br />706.7(D). A SECOND DISCONNECTING MEANS LOCATED AT THE CONNECTED EQUIPMENT SHALL BE INSTALLED WHERE <br />THE DISCONNECTING MEANS AT THE ESS END OF THE CIRCUIT IS NOT WITHIN SIGHT. <br />7. RAPID SHUTDOWN EQUIPMENT TO COMPLY WITH CEC 690.12. <br />8. THE UTILITY-INTERACTIVE INVERTERS SHALL AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE CONNECTED <br />ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THE SYSTEM AND SHALL REMAIN <br />IN THAT STATE UNTIL THE ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED, <br />CEC 705.40. <br />9. ALL CONDUCTORS IN EXPOSED OUTDOOR LOCATIONS SHALL BE LISTED AND IDENTIFIED FOR USE IN DIRECT SUNLIGHT <br />AND FOR THE APPLICATION. CEC310.10(D) AND 690.31(C) THROUGH (F). <br />10. INSULATION OF EXPOSED CONDUCTORS UNDER THE MODULES SHALL BE USE-2 OR PV-WIRE TYPE FOR PV SYSTEMS, <br />CEC 690.31(C). <br />11. FINE-STRANDED CABLE CONNECTIONS MUST BE MADE IN LUGS AND TERMINALS LISTED AND MARKED FOR THE USE, <br />CEC 110.14. <br />12. ALL PV CIRCUIT CONDUCTORS SHALL BE MARKED ON EACH END AND GROUPED FOR UNIQUE IDENTIFICATION, CEC <br />690.31(B). <br />13. ALL GROUNDED, (NEUTRAL), CONDUCTORS' INSULATION SHALL BE SOLID WHITE, GRAY, OR WITH 3-WHITE STRIPES, CEC <br />200.6, 200.7, & 400.22; AND ALL GROUNDING CONDUCTORS SHALL BE OF BARE WIRE WITHOUT COVERING, OR WITH <br />INSULATION OF GREEN OR GREEN WITH YELLOW STRIPES, CEC 250.119 & 400.23. THE COLOR OF UNGROUNDED <br />CONDUCTORS SHALL BE OTHER THAN FOR GROUNDED, (NEUTRAL), AND GROUNDING CONDUCTORS, CEC 310.110(C). <br />14. MAXIMUM CONDUCTOR LENGTH BETWEEN SUPPLY SIDE CONNECTION AND OVERCURRENT PROTECTION IS 10 FEET, <br />CEC 705.31. <br />15. CONNECTIONS ON THE LOAD SIDE OF THE SERVICE DISCONNECTING MEANS OF THE OTHER SOURCE(S) AT ANY <br />DISTRIBUTION EQUIPMENT ON THE PREMISES SHALL MEET THE FOLLOWING, CEC 705.12(B). <br />16. DC WIRING INSIDE A BUILDING MUST BE IN METALLIC TYPE RACEWAYS, CONDUITS, ENCLOSURES, OR CABLE <br />SHEATHINGS, CEC 690.31(G). <br />17. METALLIC TYPE RACEWAYS, CONDUITS, ENCLOSURES, AND CABLE SHEATHS CONTAINING CIRCUITS OVER 250-VOLTS <br />TO GROUND MUST BE BONDED IN ACCORDANCE WITH CEC 250.97. <br />18. ALL EXTERIOR CONDUIT, FITTINGS AND BOXES SHALL BE RAIN TIGHT AND APPROVED FOR USE IN WET LOCATIONS, CEC <br />314.15 <br />19. FLEXIBLE, FINE-STRANDED CABLES SHALL BE TERMINATED ONLY WITH TERMINALS, LUGS, DEVICES OR CONNECTOR <br />THAT ARE IDENTIFIED AND LISTED FOR SUCH USE, CEC 690.31(H) & 110.14. <br />20. CONNECTORS SHALL BE OF LATCHING OR LOCKING TYPE. CONNECTORS THAT ARE READILY ACCESSIBLE AND <br />OPERATING AT OVER 30 VOLTS SHALL REQUIRE TOOL TO OPEN AND MARKED DO NOT DISCONNECT UNDER <br />LOAD OR NOT FOR CURRENT INTERRUPTING , CEC 690.33(C) & (E)(2). <br />21. EQUIPMENT GROUNDING CONDUCTOR FOR PV MODULES SMALLER THAN 6 AWG SHALL BE PROTECTED FROM <br />PHYSICAL DAMAGE BY A RACEWAY OR CABLE ARMOR, CEC 690.46 & 250.120(C). <br />22. THE INTERCONNECTION POINT SHALL BE ON THE SUPPLY SIDE OF ALL GROUND-FAULT PROTECTION EQUIPMENT, CEC <br />705.32. <br />23. CABLES/WIRES THAT ARE SUBJECT TO PHYSICAL DAMAGE, SUCH AS THOSE NOT LOCATED UNDER THE MODULES, <br />MUST BE PROTECTED, CEC 300.4. <br />24. PROPOSED LOCATIONS OF ELECTRICAL SERVICE REPLACEMENTS MUST ALSO BE APPROVED BY THE ELECTRICAL <br />UTILITY COMPANY. <br />25. FOR ELECTRICAL SERVICE REPLACEMENTS, BONDING TO THE METAL PIPES OF NATURAL GAS, HOT WATER, AND COLD <br />WATER MUST BE PROVIDE, CEC 250.104. <br />26. GROUNDING ROD ELECTRODES SHALL BE MINIMUM 5/8 IN DIAMETER AND INSTALLED 8 MINIMUM IN CONTACT WITH <br />SOIL, CEC 250.52(A)(5), 250.53(G). <br />27. MINIMUM 7/8 CLEARANCE FROM ROOF TO BOTTOM OF CONDUIT OR USE A TEMPERATURE ADDER OF 33 DEGREES <br />C. CEC 310.15(B)(3)(C) <br />28. EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, & VENTILATIONS INTAKE AIR OPENINGS SHALL NOT BE <br />COVERED OR BLOCKED BY THE SOLAR PHOTOVOLTAIC SYSTEM. <br />29. EXISTING DWV PLUMBING VENT TERMINATIONS THAT ARE HORIZONTALLY LOCATED CLOSER THAN 12" FROM THE <br />PROPOSED MODULES, MUST BE REROUTED, OR MUST BE EXTENDED A MINIMUM OF 6" ABOVE THE SURFACE OF THE <br />MODULES, CPC 906.1. <br />30. EXISTING B-VENT TERMINATIONS, FOR FUEL BURNING APPLIANCES, WHERE ADJACENT TO THE PROPOSED MODULES, <br />MUST BE EXTENDED 12" ABOVE THE MODULES' TOP SURFACE, CMC 802.6.1(1) & CPC 509.6.1(1). <br />31. THE MARKINGS, "WARNING: PHOTOVOLTAIC POWER SOURCE", FOR DC RACEWAYS AND CABLE ASSEMBLIES MUST BE <br />AT 10' O.C.; AND BENDS, ABOVE OR BELOW PENETRATIONS OF ROOFS, CEILINGS, WALLS, OR BARRIERS, CEC <br />690.31(G)(4). <br />32. PV COMBINER PANELBOARDS MUST HAVE PERMANENT MARKINGS INDICATING THAT THEY ARE DEDICATED FOR PV <br />CIRCUITS ONLY NO LOADS ARE TO BE CONNECTED. <br />33. WORKING CLEARANCES TO BE PROVIDED AT NEW AND EXISTING ELECTRICAL EQUIPMENT, CEC 110.26. <br />34. A LADDER MUST BE PROVIDED FOR INSPECTIONS IN ACCORDANCE WITH CAL-OSHA REGULATIONS, SECURED AND <br />EXTENDING 3' ABOVE THE ROOF. <br />35. ALL OF THE REQUIRED MARKINGS, SIGNS, AND LABELS MUST BE INSTALLED ON ALL EQUIPMENT PRIOR TO ANY <br />INSPECTIONS. <br />36. LABELS SHALL BE REFLECTIVE, AND ALL LETTERS SHALL BE CAPITALIZED AND SHALL BE A MINIMUM HEIGHT OF 3/8'' IN <br />WHITE ON A RED BACKGROUND. CEC 690.31(G)(4) <br />37. IDENTIFICATION OF POWER SOURCE RAPID SHUTDOWN AND LABELING SHALL BE IN ACCORDANCE WITH CEC 690.56(C). <br />38. WHEN THE MAIN CIRCUIT BREAKER IS DERATED, A PERMANENT MARKING MUST BE PROVIDED ON THE PANELBOARD TO <br />INDICATE THAT THE MAIN CIRCUIT BREAKER HAS BEEN DOWNSIZED TO _______ AMPS, DO NOT UPSIZE IT. <br />39. PANELS AND MODULES NOT TO BE INSTALLED ON ROOF BELOW AN EMERGENCY ESCAPE AND RESCUE OPENING. CRC <br />R324.6.2.2 <br />40. GROUND-MOUNTED PV SYSTEMS MUST HAVE A CLEAR, BRUSH-FREE AREA OF 10-FEET AND A FIRE SEPARATION <br />DISTANCE OF 5-FEET MINIMUM TO OTHER STRUCTURES AND PROPERTY LINES, CRC R324.7 & R302.1. <br />41. PLAN CHECK AND PERMIT FOR PV SYSTEM AND ASSOCIATED EQUIPMENT ONLY. <br />42. ALL PROJECTS SUBJECT TO FIELD VERIFICATION FOR CODE COMPLIANCE. <br />43. APPROVED SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIRED WITHIN THE DWELLING UNIT AND SHALL BE <br />FIELD VERIFIED EITHER THROUGH FINAL BUILDING INSPECTION. SMOKE ALARMS ARE REQUIRED TO BE <br />INSTALLED IN ALL BEDROOMS, OUTSIDE EACH BEDROOM, AND AT LEAST ONE ON EACH FLOOR OF THE HOUSE. <br />CARBON MONOXIDE ALARMS ARE REQUIRED OUTSIDE EACH BEDROOM AND AT LEAST ONE ON EACH FLOOR OF <br />THE HOUSE. R314.1, R315.1 <br />44. NOTIFY SERVING UTILITY BEFORE ACTIVATION OF PV SYSTEM. <br />APPLICABLE CODES <br />ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALL <br />COMPLY WITH THE FOLLOWING APPLICABLE CODES <br />2019 CA BUILDING CODES (CBC) <br />2019 CA RESIDENTIAL CODES (CRC) <br />2019 CA MECHANICAL CODES (CMC) <br />2019 CA PLUMBING CODES (CPC) <br />2019 CA FIRE CODES (CFC) <br />2019 CA ELECTRICAL CODES (CEC) <br />2019 CA ENERGY CODES (CEnC) <br />2019 CALIFORNIA GREEN BUILDING STANDARDS CODE (CALGreen) <br />OCCUPANCY: R3-SFD CONSTRUCTION TYPE: VB <br /># OF STORIES: 1 BLDG AREA (SQFT):1152 <br />SPRINKLERS: NONE ROOF AREA (SQFT):1936 <br />MAIN SERVICE PANEL INFORMATION <br />EXISTING: YES UPGRADE: NO <br />BUS RATING: 125A MAIN BREAKER SIZE: 100A <br />UTILITY FED: OH MB POSITION: CENTER <br />DERATE?: NO DERATE SIZE: N/A <br />PROJECT SITE <br />ENGINEERING CRITERIA FOR RACKING <br />DESIGN WIND SPEED: 110 MPH <br />WIND EXPOSURE CATEGORY: B <br />GROUND SNOW LOAD: 0 PSF <br />9-23 <br />Bldg# 101112549 <br />Elec# 20177781 <br />Issued: 10/28/22 <br />1401 W Santa Clara <br />Ave10/31/22