Laserfiche WebLink
Date: 12/02/2022 <br />Job Number: 11631 <br />Prepared for : ECO FORCE ELECTRIC INC., 17415 VILLA CORTA ST, LA PUENTE, CA 91744 <br />Project.: ELIZABETH ROMERO , 1424 N FLOWER ST, Santa Ana, CA, 92706 <br />The following calculations are for the structural engineering design of the photovoltaic panels and are valid only for the structural info referenced in the stamped plan set. The verification of such info is the responsibility of others. After review, I <br />certify that the roof structure has sufficient structural capacity for the applied PV loads. All PV mounting equipment shall be designed and installed per manufacturer's approved installation specifications. <br />Engineerinc.io <br />303 N Glenoaks Blvd Suite 200 <br />Burbank, CA 91502 <br />(747) 333 - 5991 <br />new@engineerinc.io <br />Date Certified and <br />Signed: 12/02/2022 <br />303 N. Glenoaks Blvd Suite #200 Burbank, CA 91502 | (747)333-5991 | new@engineerinc.io <br />1424 N Flower St <br />02/15/23