My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1430 N Baker St - Plan
PBA
>
Building
>
ProjectDox
>
B
>
Baker St
>
1430 N Baker St
>
1430 N Baker St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 11:58:24 AM
Creation date
6/1/2025 11:58:15 AM
Metadata
Fields
Template:
Plan
Permit Number
20179833
101115373
Full Address
1430 N Baker St
Document Relationships
101115373 - Permit
(Permit - Plan)
Path:
\Building\Permits\B\Baker St\1430 N Baker St
20179833- Permit
(Permit - Plan)
Path:
\Building\Permits\B\Baker St\1430 N Baker St
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3' <br />- <br />1 <br />0 <br />" <br />20 <br />' <br />- <br />9 <br />" <br />3' <br />- <br />3 <br />" <br /> <br />ACD <br />JB <br />CB <br />MS <br />P <br />UM <br />6'-4"11'-6" 1'-6" <br />REV <br />SHEET NAME <br />SHEET NUMBER <br />DATE DESCRIPTION <br />VERSION <br />PV-2 <br />PROJECT NAME <br />UR04/27/2023 INITIAL RELEASE <br />HE <br />R <br />A <br />S <br />, <br /> <br />M <br />O <br />U <br />R <br />E <br />E <br />N <br />14 <br />3 <br />0 <br /> <br />N <br /> <br />B <br />A <br />K <br />E <br />R <br /> <br />S <br />T <br />, <br />SA <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />, <br /> <br />C <br />A <br /> <br />9 <br />2 <br />7 <br />0 <br />6 <br /> <br />U <br />S <br />A <br />AP <br />N <br /># <br /> <br />4 <br />0 <br />5 <br />2 <br />5 <br />1 <br />1 <br />3 <br />UT <br />I <br />L <br />I <br />T <br />Y <br />: <br /> <br />S <br />C <br />E <br />AH <br />J <br />: <br /> <br />C <br />I <br />T <br />Y <br /> <br />O <br />F <br /> <br />S <br />A <br />N <br />T <br />A <br /> <br />A <br />N <br />A <br />SHEET SIZE <br />ANSI B <br />11" X 17" <br />ENERGY RENOVATION CENTER <br />11731 Sterling Avenue, Unit G <br /> Riverside, CA 92503 <br />LIC:- 1009326 <br />PH:- 8886040226 <br />pm@energyrenovationcenter.com <br />ROOF PLAN WITH <br />MODULES <br />ROOF PLAN WITH MODULES <br />SCALE: 1/8" = 1'-0"1 <br />MODULE TYPE, DIMENSIONS & WEIGHT <br />NUMBER OF MODULES = 14 MODULES <br />MODULE TYPE = HANWHA Q.CELLS Q.PEAK DUO BLK-G6+/AC (340W) MODULES <br />MODULE WEIGHT = 47.2 LBS / 21.5 KG. <br />MODULE DIMENSIONS = 68.50"X 40.60" = 19.31 SF <br />UNIT WEIGHT OF ARRAY = 2.44 PSF <br />· PLUMBING VENTS, SKYLIGHTS AND MECHANICAL VENTS SHALL <br /> NOT BE COVERED, MOVED, RE-ROUTED OR RE-LOCATED. <br />NOTE: ACTUAL ROOF CONDITIONS AND RAFTERS (OR SEAM) <br />LOCATIONS MAY VARY. INSTALL PER MANUFACTURER(S) <br />INSTALLATION GUIDELINES AND ENGINEERED SPANS FOR <br />ATTACHMENTS <br />LEGEND <br />UTILITY METER <br />AC DISCONNECT <br />JUNCTION BOX <br />UM <br />ACD <br />JB <br />MSP MAIN SERVICE PANEL <br />CONDUIT <br />VENT, ATTIC FAN <br />(ROOFOBSTRUCTION) <br />ENPHASE IQ COMBINER 3CB <br />RAFTERS <br />ROOF ATTACHMENT <br />NOTE: * 3/4" OR GREATER IMC, RMC, FMC, LFMC, PVC, <br />HDPE, NUCC, RTRC, LFNC, FMT, ENT OR EMT <br />CONDUIT RUN EXPOSED CONDUIT RUN SHALL BE <br />MIN. 7/8" ABOVE ROOF. * ROMEX RUN INSIDE ATTIC <br />R324.6.2 - PROVING ARRAYS TAKE <br />LESS THAN 33% OF TOTAL ROOF <br />AREA.WHEN THE ARRAYS TAKE LESS <br />THAN 33% WE CAN JUSTIFY AN 18" <br />SETBACK ON BOTH SIDES OF THE <br />RIDGE. WHEN IT TAKES MORE THAN <br />33% OF THE ROOF AREA WE MUST <br />USE A 3' SETBACKS AT THE RIDGE. <br />TOTAL ROOF AREA: <br />2082.27 sqft <br />AREA OF ARRAYS: <br />68.50"X 40.60" ( PANEL DIMENSIONS) <br />68.50"X 40.60" = 19.31 sqft (PER PANEL) <br />19.31 sqft <br />panel X 14 panels = 270.38 sqft <br />(TOTAL PANEL AREA) <br />PERCENTAGE OF TOTAL ROOF AREA: <br />(270.38 sqft / 2082.27 sqft)(100)= 12.99% <br />∴ THE PANELS USE 12.99% OF <br />THE TOTAL ROOF AREA <br />BILL OF MATERIALS <br />EQUIPMENT QTY DESCRIPTION <br />RAIL 07 UNIRAC SM LIGHT RAIL 168" DARK <br />SPLICE 04 BND SPLICE BAR PRO SERIES DRK <br />MID CLAMP 22 UNIVERSAL AF SERIES MID CLAMP <br />END CLAMP 12 UNIVERSAL AF SERIES END CLAMP <br />ATTACHMENT 24 UNIRAC FLASHLOC <br />GROUNDING LUG 03 GROUND LUG <br />ARRAY AREA & ROOF AREA CALC'S <br />ROOF # OF <br />MODULES <br />ARRAY <br />AREA <br />(Sq. Ft.) <br />ROOF <br />AREA <br />(Sq. Ft.) <br />ROOF <br />AREA <br />COVERED BY <br />ARRAY (%) <br />#1 14 270.38 539.22 50.14 <br />ROOF DESCRIPTION <br />ROOF TYPE ASPHALT SHINGLE <br />ROOF <br />ROOF ROOF <br />TILT AZIMUTH RAFTERS <br />SIZE <br />RAFTERS <br />SPACING <br />#1 18°270° 2"x12" 16" O.C. <br />N <br />B <br />A <br />K <br />E <br />R <br /> <br />S <br />T <br />FR <br />O <br />N <br />T <br /> <br />Y <br />A <br />R <br />D <br />RE <br />A <br />R <br /> <br />Y <br />A <br />R <br />D <br />18 <br />" <br /> <br />F <br />I <br />R <br />E <br /> <br />P <br />A <br />T <br />H <br />W <br />A <br />Y <br />18 <br />" <br /> <br />F <br />I <br />R <br />E <br /> <br />P <br />A <br />T <br />H <br />W <br />A <br />Y <br />36" FIRE PATHWAY <br />36" FIRE PATHWAY <br />3' <br />- <br />0 <br />" <br />36" FIRE PATHWAY <br />18 <br />" <br />18" FIRE PATHWAY <br />36" FIRE PATHWAY <br />ROOF #1 <br />TILT - 18° <br /> AZIMUTH - 270°ROOF #1 <br />(14) HANWHA Q.CELLS Q.PEAK DUO BLK-G6+/AC (340W) MODULES <br />INTEGRATED WITH ENPHASE ENERGY IQ7PLUS-72-ACM-US OR <br />IQ7PLUS-72-E-ACM-US MICRO-INVERTERS <br />(E) UTILITY METER <br />(N) 30A NON FUSED AC DISCONNECT <br />(E) 200A MAIN SERVICE PANEL <br />WITH (E) 200A MAIN BREAKER <br />(N) ENPHASE IQ COMBINER BOX 3 <br />(N) 3/4" OR GREATER EMT CONDUIT <br />RUN (7/8 INCHES ABOVE ROOF) <br />(N) JUNCTION BOX (E) ASPHALT SHINGLE ROOF (TYP.) <br />(N) (24) UNIRAC FLASHLOC ATTACHMENTS <br />SPACED AT 64" O.C. <br />(N) UNIRAC SM LIGHT RAIL(TYP.) <br />(E) 2"X12" RAFTERS @ 16" O.C. (TYP.) <br />68.50" <br />40 <br />. <br />6 <br />0 <br />" <br />PHOTOVOLTAIC MODULES <br />HANWHA Q.CELLS Q.PEAK DUO <br />BLK-G6+/AC (340W) <br />27 Apr 2023 <br />EXP : 30 Sep 2023 <br />STRUCTURAL ONLYNOTE:CONTRACTOR TO VERIFY <br />EXISTING FRAMING AND <br />STRUCTURAL LETTER NOTIFY <br />EOR INCASE OF DISCRIPENCIES <br />1430 N Baker St <br />06/12/23
The URL can be used to link to this page
Your browser does not support the video tag.