Laserfiche WebLink
GOVERNING CODES <br />THE INSTALLATION OF SOLAR ARRAYS AND <br />PHOTOVOLTAIC POWER SYSTEMS SHALL COMPLY WITH <br />THE FOLLOWING CODES: <br />· 2020 National Electrical Code <br />· 2022 California Building Code <br />· 2022 California Residential Code <br />· 2022 California Green Building Standard Code <br />· 2022 California Plumbing Code <br />· 2022 California Mechanical Code <br />· 2022 California Electrical Code <br />· 2022 California Fire Code <br />· 2022 California Energy Code <br />· 2016 International Property Maintenance Code <br />ALL OTHER ORDINANCE ADOPTED BY THE <br />LOCAL GOVERNING AGENCIES <br />NEW UPGRADED <br />UNIRAC <br />SITE MAP & PV LAYOUT <br />ELECTRICAL 1-LINE DIAGRAM <br /> ATTACHMENT LAYOUT <br />SYSTEM LABELING DETAIL <br />RSD DATA SHEET <br />INVERTER DATA SHEET <br />SHEET INDEX <br />PROPERTY PLAN <br />MODULE DATA SHEET <br />RACKING DATA SHEET <br />ATTACHMENT DATA SHEET <br />PV 1.0 <br />PV 2.0 <br />PV 3.0 <br />PV 4.0 <br />PV 5.0 <br />D 6.0 <br />D 7.0 <br />D 8.0 <br />D 9.0 <br />D 10.0 <br />SYSTEM RATING <br />EQUIPMENT SUMMARY <br />ELECTRICAL INFORMATION <br />MAIN SERVICE PANEL BUS SIZE: <br />MAIN SERVICE BREAKER SIZE: <br />MOUNTING SYSTEM: <br />BUILDING INFORMATION <br />CONSTRUCTION TYPE: V-B <br />OCCUPANCY: R-3 <br />ROOF: <br />Truss 2 x 4 @ 24" O.C. <br />COMP SHINGLE <br />Parcel Number: <br />VICINITY MAP (SCALE: NTS) <br />SATELLITE VIEW (SCALE: NTS) <br />GENERAL NOTES <br />1. All electrical materials shall be new and listed by recognized <br />electrical testing laboratory <br /> Custom made equipment shall have complete test data submitted <br />by the manufacturer attesting to its safety <br />2. Outdoor equipment shall be NEMA 3R rated or equivalent <br />3. All metallic equipment shall be grounded <br />4. Contractor shall obtain electrical permits prior to installation and <br />shall coordinate all inspections, testing commissioning and <br />acceptance with the client, <br /> utility co. and city inspectors as needed. <br />5. The electrical contractor shall verify the exact locations of service <br />points and service sizes with the serving utility company and <br />comply with all utility companies requirements. <br />6. Drawings are diagrammatic only, routing of raceways shall be <br />option of the contractor unless otherwise noted and shall be <br />coordinated with other trades. <br />7. If the roof material or the roof structure not adequate for PV <br />installation, call the engineer of record prior to installation. The <br />contractor is responsible to verify that the roof is capable of <br />withstanding the extra weight. <br />8. If the distances for cable runs are different than shown, the <br />contractor shall notify the electrical engineer to validate the wire <br />size. Final drawings will be red-lined and updated as appropriate. <br />9. Whenever a discrepancy in quality of equipment arises on the <br />drawing or specifications, the contractor shall be responsible for <br />providing and installing all materials and services required by the <br />strictest conditions noted on the drawings or in the specifications <br />to ensure complete compliance and longevity of the operable <br />system required by the engineer of record. <br />PHOTOVOLTAIC NOTES: <br />1. Rooftop mounted photovoltaic panels and modules shall be tested, <br />listed and identified by recognized testing laboratory <br />2. Solar system shall not cover any plumbing or mechanical vents <br />3. Modules and support structures shall be grounded <br /> unless racking has integrated ground. <br />4. Removal of an interactive inverter or other equipment shall not <br />disconnect the bonding connection between the grounding <br />electrode conductor and the photovoltaic source and/or output <br />circuit grounded conductors. <br />5. All PV modules and associated equipment and wiring shall be <br />protected from physical damage. <br />6. Live parts of PV source circuits and PV output circuits over 150v to <br />ground shall not be accessible to other than qualified persons <br /> while energized. <br />7. Inverter is equipped with integrated DC disconnect, thus providing <br />ground fault protection <br />8. All conductors shall be copper and 75 deg rated <br />9. A single conductor shall be permitted to be used to perform the <br />multiple functions of dc grounding, AC grounding and bonding <br />between AC and DC systems. <br />10.Non-current carrying metal parts of equipment shall be effectively <br />bonded together. Bond both ends of raceways. <br />125A <br />02/20/2023 <br />Property Address: <br />Owner: <br />39638217 <br />Vincent Piarulli <br />Property Type:Single Family Residence <br />Drawn by:New@engineerinc.io <br />Date: <br />DC 6.400 KW STC <br />AC 4.640 KW STC <br />16 HANWHA 400 WATT MODULES <br />WITH IQ8+ MICROINVERTERS <br />1601 Beechwood St, Santa Ana, CA 92705 <br />CONTRACTOR <br />ECB DATA SHEET D 11.0 <br />Flagship Holdings LLC <br />Address: 15911 canterbury ct. <br />Bakersfield, CA 93314 <br />Phone number: 661-428-9293 <br />License:CSLB #1094787 <br />100A <br />Tyler Crosby <br />Wind Speed: 110 mph. <br />Date Certified and <br />Exp. Date : 3/31/2024 <br />Signed:02/20/2023 <br />Professional Certification. I hereby certify that these documents <br />were prepared or approved by me, and that I am a duly licensed <br />professional engineer under the laws of the State of California. <br />License No. ____________, Expiration Date: _______________ 88083 03/31/2024 <br />G <br />Bldg permit #101114194 <br />Elect permit #20178964 <br />Issued on 3/8/23 <br /> ***The scope of the plans is for the installation of the solar photovoltaic system <br />only and the approval is subject to compliance with all applicable city and state <br />codes and regulations regarding construction. The approval of the plans does not <br />constitute any certification of the accuracy, completeness, or building permit status <br />of the existing buildings and structures as shown.*** <br />1601 E Beechwood <br />St03/09/23