My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1610 E First St - 101118465 & 20182250 - Plan
PBA
>
Building
>
ProjectDox
>
F
>
First St
>
1610 E First St
>
1610 E First St - 101118465 & 20182250 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 12:56:23 AM
Creation date
6/1/2025 11:59:30 AM
Metadata
Fields
Template:
Plan
Permit Number
20182250
101118465
Full Address
1610 E First St
Street Number
1610
Street Direction
E
Street Name
First
Street Suffix
St
Text box
ID:
1
Creator:
Import Agent
Created:
6/1/2025 11:59 AM
Modified:
5/30/2025 1:15 PM
Text:
Purlin to Beam Connection
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Job Name: Indo Chinese Islamic Center Solar Canopy . <br />Job No.: 24-0076 Sheet No.: . <br />By: JKC Date: Jan-24 . <br />Design Screw Size = #14 Thickness of Material in Connection =0.135 in <br />d =nominal screw diameter (in.)=0.25 <br />dw =larger of head or washer diameter, not larger than 5/16" (in.)=0.5 <br />Ω =factor of safety =3.00 <br />Pns =nominal shear strength of sheet per screw <br />Pss =nominal shear strength of screw (lb/screw)=2440 (Worst case for ESR-2196, 1271, 1976) <br />Pnot =nominal pull-out strength of sheet per screw <br />Pnov =nominal pull-over strength of sheet per screw <br />Pts =nominal tension strength of screw (lb/screw)=3658 (Worst case for ESR-2196, 1271, 1976) <br />t1 =thickness of member in contact with screw head =0.058 in <br />t2 =thickness of member not in contact with screw head =0.135 in <br />tc =Lesser of depth of penetration and thickness t2 =0.135 in <br />Fu1 =tensile strength of member in contact with screw or washer (psi)=85000 <br />Fu2 =tensile strength of member not in contact with screw or washer (psi)=90000 <br />For t2 / t1 ≤ 1.0, Pns shall be taken as the smallest of:For t2 / t1 > 2.5, Pns shall be taken as the smaller of: <br />Pns =4.2 (t2 <br />3d)(1/2)Fu2 (Eq. E/J 4.3.1-1) = 9375 lb Pns =2.7 t1 <br /> d Fu1 (Eq. E/J 4.3.1-4)= 3328 lb <br />Pns =2.7 t1 <br /> d Fu1 (Eq. E/J 4.3.1-2)= 3328 lb Pns =2.7 t2 <br /> d Fu2 (Eq. E/J 4.3.1-5)= 8201 lb <br />Pns =2.7 t2 <br /> d Fu2 (Eq. E/J 4.3.1-3)= 8201 lb Min = 3328 lb <br />For 1.0< t2 / t1 > 2.5, Pns shall be determined by linear interpolation between the above two cases. <br />For t2 / t1 =2.33 Pns =3328 lb 1109 lb <br />Pns =Pss / Ω =813 lb <br />Shear Capacity = P/Ω =813 lb / screw <br />Pnot =0.85 tc d Fu2 (Eq. E/J 4.4.1-1) =2581.9 lb / Ω = <br />Pnov =1.5 t1 d'w Fu1 (Eq. E/J 4.4.2-1) =3697.5 lb / Ω =where dw shall be taken not larger than 3/4 in. <br />Pts =Pts / Ω =1219 lb <br />Tension Capacity = P/Ω =861 lb / screw <br />NOTE: 1. Based on the AISI "North American Specification for the Design of Cold-Formed Steel Structural Members" AISI S100. <br /> 2. Minimum spacing of screws shall not be less than 3d. Minimum edge distance of screws shall not be less than 1.5d. <br />Sheet Updated 7/14/22 <br /> 3. The head of the screw or the washer shall have a diameter, dw of not less than 5/16 inch. Washers shall be at least 0.050 inch thick for t1 greater than <br />0.027 in and at least 0.024 in for t1 equal to or less than 0.027 in. The washer shall be at least 0.063 in thick when 5/8 < dw < 3/4 in. <br />Screw Connection: Definitions and Design Values (PURLIN TO BEAM DIRECT CONNECT) <br />0.058 in connected to <br />Section E4.3.1 Connection Shear Limited by Tilting and Bearing <br />Min = 3328 lb <br />lb / Ω = <br />Section E4.3.2 Shear in Screws <br />Section E4.4.1 Pull-Out <br />861 lb <br />Section E4.4.2 Pull-Over <br />1233 lb <br />Section E4.4.3 Tension in Screws <br />&R&RF:\_CTS ENG JOBS 2024\240076 Indo Chinese Islamic Center Solar Canopy - Santa Ana, CA - DEE - ENG\Calculations\Purlin Beam Connection\Purlin to Beam <br />Connection Design1 <br />F:\_CTS ENG JOBS 2024\240076 Indo Chinese Islamic Center Solar Canopy - Santa Ana, CA - DEE - ENG\Calculations\Purlin Beam Connection\Purlin to Beam Connection <br />Design1 <br />47 1610 E First St - 101118465 & <br />201822505/7/2024
The URL can be used to link to this page
Your browser does not support the video tag.