My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1621 W Avalon Ave - Plan
PBA
>
Building
>
ProjectDox
>
A
>
Avalon Ave
>
1621 W Avalon Ave
>
1621 W Avalon Ave - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 11:59:41 AM
Creation date
6/1/2025 11:59:32 AM
Metadata
Fields
Template:
Plan
Permit Number
20180475
101116060
Full Address
1621 W Avalon Ave
Document Relationships
101116060 - Permit
(Permit - Plan)
Path:
\Building\Permits\A\Avalon Ave\1621 W Avalon Ave
20180475 - Permit
(Permit - Plan)
Path:
\Building\Permits\A\Avalon Ave\1621 W Avalon Ave
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
© 2022 IRONRIDGE, INC. VERSION 3.6 FLUSH MOUNT INSTALLATION MANUAL - 8 <br />EXPANSION JOINTS <br />BOSS <br />,QVHUW%266LQWR¿UVW5DLOXSWRWKH$OLJQPHQW&LUFOH6OLGH <br />second Rail over BOSS to the second Alignment Circle, <br />OHDYLQJDJDSEHWZHHQWKH5DLOV <br />7KHUHPXVWEHDRIVSDFHEHWZHHQWKHHGJHRIWKH5DLO <br />and the edge of the panel to allow proper installation of the <br />UFO and Stopper Sleeve. <br />No Modules Over Gap <br />One Bonding Strap Per Break In <br />Array <br />No Modules Over Gap <br />No Bonding Strap required for <br />BOSS <br />([SDQVLRQ-RLQWVDUHUHTXLUHGHYHU\<br />RIFRQWLQXRXVUDLOWRDOORZIRUWKHUPDOH[SDQVLRQDQGFRQWUDFWLRQRIWKHV\VWHP <br /> ➢Do not install modules over expansion joint. <br />*DS$OLJQPHQW <br />Circles <br />END CAPS (OPTIONAL) <br />© 2022 IRONRIDGE, INC. VERSION 3.6 FLUSH MOUNT INSTALLATION MANUAL - 9 <br />ELECTRICAL DIAGRAM <br />UFO Grounding Lug Minimum 10 AWG <br />Copper Wire <br />Fault Current <br />Ground Path <br />Bonded Splice (Rail Connection) <br />* <br />* <br /> 2QH0RGXOH*URXQGLQJ/XJRU5DLO*URXQGLQJOXJLVUHTXLUHGSHUURZRIDV\VWHP <br /> <br /> 7KHXVHRIWKH%RQGLQJ-XPSHUHOLPLQDWHVWKHQHHGIRUURZWRURZERQGLQJ$PLQLPXPRIRQHJURXQGLQJOXJ <br />per continuous array is required for earth ground. <br />*URXQGLQJ/XJVDQGZLUHDUHQRWUHTXLUHGLQV\VWHPVXVLQJFHUWDLQ(QSKDVHPLFURLQYHUWHUVRUFHUWDLQ6XQSRZHU <br />modules. Equipment grounding is achieved with the Engage cable for Enphase or the AC module cable system for <br />Sunpower via their integrated EGC. <br />CAMO <br /> or UFO or <br />CAMO <br />%RQGLQJ-XPSHUAlternative row to row bond)** <br />Rail Grounding Lug* <br />Module Grounding Lug* <br />1621 W Avalon <br />Ave08/07/23
The URL can be used to link to this page
Your browser does not support the video tag.