©2022 IRONRIDGE, INC. VERSION 3.6 FLUSH MOUNT INSTALLATION MANUAL - 18
<br />END CAPSWIRE CLIPS
<br />:LUH&OLSVRႇHUDVLPSOHZLUHPDQDJHPHQWVROXWLRQ
<br />Firmly press Wire Clip into top rail slot. Run electrical wire
<br />through open clip. Snap closed once all wires have been
<br />placed.
<br />Press Clip
<br />into Slot
<br />Run Wire
<br />Snap Clip
<br />Closed
<br />JAYBOX
<br />A.
<br />Prior to installation, use step drill bit to place pass through
<br />holes for conduits or water-tight connectors. Drill bit
<br />starter locations are provided on the sides and front of
<br />enclosure.
<br />➢ Do not install conduit facing up roof.
<br />B (Rail).
<br />8VHUDLOVSHFL¿F0/3(PRXQWLQJKDUGZDUHWRDWWDFK5DLO
<br />+DQJHUVWRUDLO(QVXUHMXQFWLRQER[LVSXVKHGDVFORVH
<br />WRWKHUDLODVSRVVLEOH7RUTXHWRLQOEVRU
<br />socket).
<br />➢Do not overtighten
<br />➢If installing in areas with ground snow loads greater than
<br />40 psf, install JayBox under module directly next to module
<br />frame edge.
<br />B (Shingle).
<br />Align sealing oval of box to align with mating feature on
<br />ÀDVKLQJ$Q(3'0IRDPJDVNHWLVSUHLQVWDOOHGWRWKH
<br />XQGHUVLGHRIWKHMXQFWLRQER[WRVHDOWKHÀDVKLQJWRWKH
<br />box without the need for additional sealant. Secure with
<br />VXSSOLHG[ôGHFNVFUHZV[XQWLOWKHMXQFWLRQ
<br />ER[LVSXOOHGWLJKWWRWKHÀDVKLQJ'RQRWRYHUWLJKWHQ
<br />screws to avoid stripping screws in OSB.
<br />➢,ILQVWDOOLQJSDVVWKURXJK¿WWLQJVHQVXUHWKDWWKH-D\%R[DQG
<br />URRIGHFNDUHERWKSURSHUO\SUHSDUHG&RPSOHWHLQVWDOODWLRQ
<br />SURFHVVEHIRUHDWWDFKLQJWKH-D\ER[WRWKHGHFN
<br />➢Do not install JayBox under shingle seam as illustrated below.
<br />C.
<br />,QVWDOOZLULQJFRQGXLWDQG¿WWLQJVSHU1(&
<br />UHTXLUHPHQWVDQGIROORZLQJORFDO$+-JXLGDQFH
<br />8VLQJ3KLOLSV+HDG'ULYHUWLJKWHQWKHEROW
<br />➢ For additional details refer to the full QM Installation Manual.
<br />.H\ZD\VDQG
<br />shingle joints
<br />Drill starter
<br />locations
<br />©2022 IRONRIDGE, INC. VERSION 3.6 FLUSH MOUNT INSTALLATION MANUAL - 19
<br />MICROINVERTER KITS
<br />SYSTEMS USING ENPHASE MICROINVERTERS OR SUNPOWER AC MOD-
<br />,URQ5LGJHV\VWHPVXVLQJDSSURYHG(QSKDVHSURGXFWVRU6XQ3RZHUPRGXOHVHOLPLQDWHWKHQHHGIRUOD\LQOXJVDQG¿HOG
<br />LQVWDOOHGHTXLSPHQWJURXQGLQJFRQGXFWRUV(*&7KLVVROXWLRQPHHWVWKHUHTXLUHPHQWVRI8/IRUERQGLQJDQG
<br />grounding and is included in this listing.
<br />COMPATIBLE PRODUCTS
<br />Sunpower
<br />0RGXOHVZLWKPRGHOLGHQWL¿HU$E[[[<<DQG,QYLVL0RXQW*PPIUDPHZKHUH³$´LVHLWKHU(RU;³E´FDQEHRU
<br />and YY can be C-AC, D-AC, BLK-C-AC, or BLK-D-AC.
<br />Enphase
<br />Microinverters M250-72, M250-60, M215-60, C250-72, and Engage cables ETXX-240, ETXX-208, ETXX-277.
<br />➢ A minimum of two inverters mounted to the same rail and connected to the same Engage cable are required.
<br />➢ The microinverters or Sunpower AC modules must be used with a maximum 20 A branch rated overcurrent protection device (OCPD).
<br />➢,IDQ$&PRGXOHLVUHPRYHGIURPDFLUFXLWIRUPDLQWHQDQFH\RXPXVW¿UVWGLVFRQQHFW$&SRZHUDQGWKHQLQVWDOODWHPSRUDU\(*&WR
<br />EULGJHWKHJDSE\LQVHUWLQJDQ$&H[WHQVLRQFDEOHRUYLDRWKHU1(&FRPSOLDQWPHDQVLQRUGHUWRPDLQWDLQHႇHFWLYHJURXQGFRQWLQXLW\
<br />to subsequent modules.
<br />One Microinverter
<br />.LW5HTXLUHG
<br />(80 in-lbs)
<br />8VH,URQ5LGJH<br />V0LFURLQYHUWHU.LWWRERQGFRPSDWLEOH
<br />microinverters and power optimizers to the racking system.
<br />,QVHUW0LFURLQYHUWHU.LW7EROWLQWRWRSUDLOVORW3ODFH
<br />compatible microinverter or power optimizer into position
<br />and tighten hex nut to 80 in-lbs.
<br />➢ If installing in areas with ground snow loads greater than 40 psf,
<br />install MLPE devices directly next to module frame edge
<br />On AP systems equipment,
<br /> remove Grounding Washer
<br />COMPATIBLE PRODUCTS
<br />Enphase
<br />M250-72, 250-60, M215-60, C250-72, S230, S280, IQ 6, IQ 6+, IQ
<br />IQ7, IQ 7A, IQ 7+, IQ7 PD, IQ 7X, Q Aggregator; IQ8-60,
<br />IQ8PLUS-72, IQ8A-72, IQ8H-208-72, IQ8H-240-72, IQ8M-72, may be
<br />followed by -2-US
<br />Darfon
<br />MIG240, MIG300, G320, G640
<br />Solar Edge
<br />M1600, P300, P320, P340, P370, P400, P401, P405, P485, P505,
<br />P600, P700, P730, P750, P800p, P800s, P801, P850, P860, P950,
<br />P960, P1100, P1101, S440, S500, S1200, S1201
<br />SMA
<br />5RRI&RPP.LW3867650RGXOH5HWUR¿W.LWV765676
<br />R-O, TS4-R-F)
<br />Tigo
<br />Tigo Access Point (TAP)
<br />TS4-R-X (where X can be F, M, O, or S)
<br />TS4-R-X-DUO (where X can be M, O, or S)
<br />TS4-A-X (where X can be F, 2F, O, O-DUO, or S)
<br />Generac
<br />S2502
<br />AP Systems
<br />DS3, QS1, QT2 and YC600
<br />NEP
<br />BDM-300, BDM-300X2 and BDM-800
<br />Two Microinverter
<br />.LWV5HTXLUHG
<br />(80 in-lbs)
<br />➢ Remove Grounding Washer on AP Systems QS1, QT2, DS3 and YC600 inverters before installing to XR rails.
<br />➢ Remove the Stainless Steel Clip on Tigo-A MLPE Devices before attaching to XR rails.
<br />➢8VHWKHQXPEHURI,URQ5LGJH0LFURLQYHUWHUNLWVDOORZHGE\WKH0/3(PRXQWLQJÀDQJH6RPHZLOOUHTXLUH
<br />NLWDQGRWKHUVNLWV
<br />1621 W Avalon
<br />Ave08/07/23
|