Laserfiche WebLink
©2022 IRONRIDGE, INC. VERSION 3.6 FLUSH MOUNT INSTALLATION MANUAL - 18 <br />END CAPSWIRE CLIPS <br />:LUH&OLSVRႇHUDVLPSOHZLUHPDQDJHPHQWVROXWLRQ <br />Firmly press Wire Clip into top rail slot. Run electrical wire <br />through open clip. Snap closed once all wires have been <br />placed. <br />Press Clip <br />into Slot <br />Run Wire <br />Snap Clip <br />Closed <br />JAYBOX <br />A. <br />Prior to installation, use step drill bit to place pass through <br />holes for conduits or water-tight connectors. Drill bit <br />starter locations are provided on the sides and front of <br />enclosure. <br />➢ Do not install conduit facing up roof. <br />B (Rail). <br />8VHUDLOVSHFL¿F0/3(PRXQWLQJKDUGZDUHWRDWWDFK5DLO <br />+DQJHUVWRUDLO(QVXUHMXQFWLRQER[LVSXVKHGDVFORVH <br />WRWKHUDLODVSRVVLEOH7RUTXHWRLQOEV RU <br />socket). <br />➢Do not overtighten <br />➢If installing in areas with ground snow loads greater than <br />40 psf, install JayBox under module directly next to module <br />frame edge. <br />B (Shingle). <br />Align sealing oval of box to align with mating feature on <br />ÀDVKLQJ$Q(3'0IRDPJDVNHWLVSUHLQVWDOOHGWRWKH <br />XQGHUVLGHRIWKHMXQFWLRQER[WRVHDOWKHÀDVKLQJWRWKH <br />box without the need for additional sealant. Secure with <br />VXSSOLHG[ôGHFNVFUHZV [ XQWLOWKHMXQFWLRQ <br />ER[LVSXOOHGWLJKWWRWKHÀDVKLQJ'RQRWRYHUWLJKWHQ <br />screws to avoid stripping screws in OSB. <br />➢,ILQVWDOOLQJSDVVWKURXJK¿WWLQJVHQVXUHWKDWWKH-D\%R[DQG <br />URRIGHFNDUHERWKSURSHUO\SUHSDUHG&RPSOHWHLQVWDOODWLRQ <br />SURFHVVEHIRUHDWWDFKLQJWKH-D\ER[WRWKHGHFN <br />➢Do not install JayBox under shingle seam as illustrated below. <br />C. <br />,QVWDOOZLULQJFRQGXLWDQG¿WWLQJVSHU1(& <br />UHTXLUHPHQWVDQGIROORZLQJORFDO$+-JXLGDQFH <br />8VLQJ3KLOLSV+HDG'ULYHUWLJKWHQWKHEROW <br />➢ For additional details refer to the full QM Installation Manual. <br />.H\ZD\VDQG <br />shingle joints <br />Drill starter <br />locations <br />©2022 IRONRIDGE, INC. VERSION 3.6 FLUSH MOUNT INSTALLATION MANUAL - 19 <br />MICROINVERTER KITS <br />SYSTEMS USING ENPHASE MICROINVERTERS OR SUNPOWER AC MOD- <br />,URQ5LGJHV\VWHPVXVLQJDSSURYHG(QSKDVHSURGXFWVRU6XQ3RZHUPRGXOHVHOLPLQDWHWKHQHHGIRUOD\LQOXJVDQG¿HOG <br />LQVWDOOHGHTXLSPHQWJURXQGLQJFRQGXFWRUV (*& 7KLVVROXWLRQPHHWVWKHUHTXLUHPHQWVRI8/IRUERQGLQJDQG <br />grounding and is included in this listing. <br />COMPATIBLE PRODUCTS <br />Sunpower <br />0RGXOHVZLWKPRGHOLGHQWL¿HU$E[[[<<DQG,QYLVL0RXQW * PPIUDPHZKHUH³$´LVHLWKHU(RU;³E´FDQEHRU <br />and “YY” can be C-AC, D-AC, BLK-C-AC, or BLK-D-AC. <br />Enphase <br />Microinverters M250-72, M250-60, M215-60, C250-72, and Engage cables ETXX-240, ETXX-208, ETXX-277. <br />➢ A minimum of two inverters mounted to the same rail and connected to the same Engage cable are required. <br />➢ The microinverters or Sunpower AC modules must be used with a maximum 20 A branch rated overcurrent protection device (OCPD). <br />➢,IDQ$&PRGXOHLVUHPRYHGIURPDFLUFXLWIRUPDLQWHQDQFH\RXPXVW¿UVWGLVFRQQHFW$&SRZHUDQGWKHQLQVWDOODWHPSRUDU\(*&WR <br />EULGJHWKHJDSE\LQVHUWLQJDQ$&H[WHQVLRQFDEOH RUYLDRWKHU1(&FRPSOLDQWPHDQV LQRUGHUWRPDLQWDLQHႇHFWLYHJURXQGFRQWLQXLW\ <br />to subsequent modules. <br />One Microinverter <br />.LW5HTXLUHG <br />(80 in-lbs) <br />8VH,URQ5LGJH<br />V0LFURLQYHUWHU.LWWRERQGFRPSDWLEOH <br />microinverters and power optimizers to the racking system. <br />,QVHUW0LFURLQYHUWHU.LW7EROWLQWRWRSUDLOVORW3ODFH <br />compatible microinverter or power optimizer into position <br />and tighten hex nut to 80 in-lbs. <br />➢ If installing in areas with ground snow loads greater than 40 psf, <br />install MLPE devices directly next to module frame edge <br />On AP systems equipment, <br /> remove Grounding Washer <br />COMPATIBLE PRODUCTS <br />Enphase <br />M250-72, 250-60, M215-60, C250-72, S230, S280, IQ 6, IQ 6+, IQ <br />IQ7, IQ 7A, IQ 7+, IQ7 PD, IQ 7X, Q Aggregator; IQ8-60, <br />IQ8PLUS-72, IQ8A-72, IQ8H-208-72, IQ8H-240-72, IQ8M-72, may be <br />followed by -2-US <br />Darfon <br />MIG240, MIG300, G320, G640 <br />Solar Edge <br />M1600, P300, P320, P340, P370, P400, P401, P405, P485, P505, <br />P600, P700, P730, P750, P800p, P800s, P801, P850, P860, P950, <br />P960, P1100, P1101, S440, S500, S1200, S1201 <br />SMA <br />5RRI&RPP.LW3867650RGXOH5HWUR¿W.LWV 765676 <br />R-O, TS4-R-F) <br />Tigo <br />Tigo Access Point (TAP) <br />TS4-R-X (where X can be F, M, O, or S) <br />TS4-R-X-DUO (where X can be M, O, or S) <br />TS4-A-X (where X can be F, 2F, O, O-DUO, or S) <br />Generac <br />S2502 <br />AP Systems <br />DS3, QS1, QT2 and YC600 <br />NEP <br />BDM-300, BDM-300X2 and BDM-800 <br />Two Microinverter <br />.LWV5HTXLUHG <br />(80 in-lbs) <br />➢ Remove Grounding Washer on AP Systems QS1, QT2, DS3 and YC600 inverters before installing to XR rails. <br />➢ Remove the Stainless Steel Clip on Tigo-”A” MLPE Devices before attaching to XR rails. <br />➢8VHWKHQXPEHURI,URQ5LGJH0LFURLQYHUWHUNLWVDOORZHGE\WKH0/3(PRXQWLQJÀDQJH6RPHZLOOUHTXLUH <br />NLWDQGRWKHUVNLWV <br />1621 W Avalon <br />Ave08/07/23