Laserfiche WebLink
McPherson Engineering By: T.C. <br />Date: 1/30/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 11.67% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 5.31% < 10% = OK! <br />Anchorage: <br />DEMAND OF 533.6LB. < CAPACITY OF 788.5LB. = OK! <br />USE (2) #12IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRAY <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />1/30/2023 8:53 AM <br />7 of 7 <br />©McPherson Engineering <br />1644 W McFadden <br />Ave08/31/23