Laserfiche WebLink
13. <br />14. <br />15. <br />16. <br />47. <br />18. <br />18. <br />110. <br />1.15. <br />1.16. <br />447. <br />1.18. <br />4.19. <br />4.20. <br />4.21. <br />4.22. <br />1.23. <br />1.24, <br />4.25. <br />1.26. <br />1.27. <br />1.28. <br />1.29. <br />- WORI 7 <br />PV ROOF ATTACHMENTS - UNIRAC FLASHLOC MOUNT FOR COMP SHINGLE & <br />PROJECT NOTES: <br />THIS PHOTOVOLTAIC (PV} SYSTEM SHALL COMPLY WITH THE NATIONAL <br />ELECTRICAL CODE (NEC) ARTICLE 690, ALL MANUFACTURERS?S LISTING AND <br />INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED <br />BY THE AUTHORITY HAVING JURISDICTION'S (AHJ) APPLICABLE CODES. <br />THE UTILITY INTERCONNECTION APPLICATION MUST BE APPROVED AND <br />PV SYSTEM INSPECTED PRIOR TO PARALLEL OPERATION <br />GROUND FAULT DETECTION AND INTERRUPTION (GFDI) DEVICE iS <br />INTEGRATED WITH THE MICROINVERTER IN ACCORDANCE WITH NEC <br />690.5(A) <br />ALL PV SYSTEM COMPONENTS; MODULES, UTILITY-INTERACTIVE <br />INVERTERS, AND SOURCE CIRCUIT COMBINER BOXES ARE IDENTIFIED AND <br />LISTED FOR USE IN PHOTOVOLTAIC SYSTEMS AS REQUIRED BY NEC 690.4 <br />& NEC 690.60: PV MODULES: UL1703, IEC61730, AND IEC61215, AND NFPA 70 <br />CLASS C FIRE INVERTERS: UL 1741 CERTIFIED, IEEE 1547, 929, 519 <br />COMBINER BOX(ES): UL 1703 OR UL 1741 AGCESSORY <br />MAX DC VOLTAGE CALCULATED USING MANUFACTURER PROVIDED TEMP <br />COEFFICIENT FOR VOC. IF UNAVAILABLE, MAX DC VOLTAGE CALCULATED <br />ACCORDING TO NEC 690.7. <br />ALL INVERTERS, PHOTOVOLTAIC MODULES, PHOTOVOLTAIC PANELS, AND <br />SOURCE CIRCUIT COMBINERS INTENDED FOR USE IN A PHOTOVOLTAIC <br />POWER SYSTEM WILL BE IDENTIFIED AND LISTED FOR THE APPLICATION <br />PER 690.4 (D), SHALL BE INSTALLED ACCORDING TO ANY INSTRUCTIONS <br />FROM LISTING OR LABELING [NEC 110.3]. <br />ALL SIGNAGE TO BE PLACED IN ACCORDANCE WITH LOCAL BUILDING <br />CODE, IF EXPOSED TO SUNLIGHT, IT SHALL BE UV RESISTANT. ALL <br />PLAQUES AND SIGNAGE WILL BE INSTALLED AS REQUIRED BY THE NEC <br />AND AHJ. <br />SCOPE OF WORK: <br />PRIME CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND <br />SPECIFICATIONS OF THE GRID-TIED PHOTOVOLTAIC SYSTEM RETROFIT. <br />PRIME CONTRACTOR WILL BE RESPONSIBLE FOR COLLECTING EXISTING <br />ONSITE REQUIREMENTS TO DESIGN, SPECIFY, AND INSTALL THE <br />EXTERIOR ROOF-MOUNTED PORTION OF THE PHOTOVOLTAIC SYSTEMS. <br />DETAILED IN THIS DOCUMENT. <br />(CLUDES: <br />QUICKMOUNT PV QMLSH FOR TAR AND GRAVEL ROOF <br />PV RACKING SYSTEM INSTALLATION - UNIRAC SM ROOF MOUNT <br />RACKING HARDWARE <br />PV MODULE AND INVERTER INSTALLATION - CANADIAN SOLAR CS3N <br />395MS(395W) [BLK] MODULES MODULES /ENPHASE (Q-8M-72-2-US. <br />MICROINVERTERS <br />PV EQUIPMENT GROUNDING <br />PV SYSTEM WIRING TO A ROOF-MOUNTED JUNCTION BOX <br />PV LOAD CENTERS (IF INCLUDED) <br />PV METERING/MONITORING (IF INCLUDED) <br />PV DISCONNECTS <br />PV GROUNDING ELECTRODE & BONDING TO (E} GEC <br />PV FINAL COMMISSIONING <br />{E) ELECTRICAL EQUIPMENT RETROFIT FOR PV <br />SIGNAGE PLACED IN ACCORDANCE WITH LOCAL BUILDING CODE <br />SITE NOTES: <br />A LADDER WILL BE IN PLACE FOR INSPECTION iN COMPLIANCE WITH OSHA <br />REGULATIONS. <br />THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS <br />SYSTEM IS A UTILITY INTERACTIVE SYSTEM WITH NO STORAGE <br />BATTERIES. <br />THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, <br />MECHANICAL, OR BUILDING ROOF VENTS. <br />PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND. <br />PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED AS PER SECTION <br />NEC 110.26, <br />ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN <br />ACCORDANCE WITH THIS CODE AND THE APPROVED MANUFACTURER'S: <br />INSTRUCTIONS SUCH THAT THE ROOF COVERING SERVES TO PROTECT <br />THE BUILDING OR STRUCTURE. <br />1.30. <br />1.31. <br />1.32. <br />1.33. <br />1.34, <br />1.35. <br />1.36. <br />4.37. <br />1.38. <br />1.39. <br />1.40. <br />1.41. <br />1.42. <br />1.43. <br />1.44. <br />1.45. <br />1.48. <br />1.47. <br />1.48. <br />1.49. <br />1.50. <br />1.54. <br />1.52. <br />1.53. <br />1.54, <br />1.55. <br />EQUIPMENT LOCATIONS: <br />ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED 8Y NEC <br />110.26, <br />WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR <br />EXPECTED OPERATING TEMPERATURE AS SPECIFIED BY NEC 690.31 (A),{C) <br />AND NEG TABLES 310.15 (B)(2}(A) AND 310.15 (BX3)(C) <br />JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES <br />ACCORDING TO NEC 690.34. <br />ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE <br />INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT. <br />ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED <br />PERSONNEL ACCORDING TO NEC APPLICABLE CODES. <br />ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR <br />OUTDOOR USAGE WHEN APPROPRIATE. <br />STRUCTURAL NOTES: <br />RACKING SYSTEM <br />PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT <br />INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE <br />BETWEEN MODULES, AND RAILS MUST ALSO EXTEND. <br />A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, <br />ACCORDING TO RAIL MANUFACTURER'S INSTRUCTIONS. <br />JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS? <br />SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED <br />SEALED PER LOCAL REQUIREMENTS. <br />ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND <br />SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED <br />CONTRACTOR. <br />ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN <br />THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. <br />WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE <br />STAGGERED AMONGST THE ROOF FRAMING MEMBERS. <br />WIRING & CONDUIT NOTES <br />ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR <br />PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM <br />CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. <br />CONDUCTORS SIZED ACCORDING TO NEC 690.8, NEC 690.7. <br />VOLTAGE DROP LIMITED TO 1.5%. <br />DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WiRING <br />SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH <br />SUITABLE WIRING CLIPS. <br />AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: PHASE A OR L1- <br />BLACK PHASE 8 OR L2- RED, OR OTHER CONVENTION IF THREE PHASE <br />PHASE C OR L3- BLUE, YELLOW, ORANGE", OR OTHER CONVENTION <br />NEUTRAL- WHITE OR GREY IN 4-WIRE DELTA CONNECTED SYSTEMS THE <br />PHASE WITH HIGHER VOLTAGE TO BE MARKED ORANGE [NEC 110.15 <br />GROUNDING NOTES: <br />GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR <br />PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL <br />BE RATED FOR SUCH USE. <br />PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO NEC 690.43 AND <br />MINIMUM NEC TABLE 250.122. <br />METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES <br />CONSIDERED GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). <br />EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO. <br />NEC 690.45 AND MICROINVERTER MANUFACTORERS' INSTRUCTIONS. <br />1.56. <br />1.57. <br />1.58. <br />1.59, <br />1.60. <br />1.61. <br />1.62. <br />1.63. <br />1.64, <br />1.65. <br />1.66. <br />1.67. <br />1.68. <br />1.69. <br />1.70. <br />174. <br />1.72, <br />1.73. <br />4.74, <br />4.75. <br />EACH MODULE WiLL BE GROUNDED USING WEEB GROUNDING CLIPS AS <br />SHOWN IN MANUFACTURER DOCUMENTATION AND APPROVED BY THE <br />AHJ. IF WEEBS ARE NOT USED, MODULE GROUNDING LUGS MUST BE <br />INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES PER THE <br />MANUFACTURERS? INSTALLATION REQUIREMENTS. <br />THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH <br />THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING <br />CONDUCTOR TO ANOTHER MODULE. <br />GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE <br />COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER [NEC 250.119] <br />THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH NEC 690.47 AND <br />NEC 250.50 THROUGH 250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR <br />INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED ACCORDING <br />TO NEC 250, NEC 690.47 AND AHJ. <br />GROUND-FAULT DETECTION SHALL COMPLY WiTH NEC 690.5 IN GENERAL <br />AND NEC 690.5 (A)(1) SPECIFICALLY. <br />URRENT PROTECTION NOTE! <br />DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE, <br />SWITCH IS OPENED THE CONDUCTORS REMAINING ENERGIZED ARE <br />CONNECTED TO THE TERMINALS MARKED ?LINE SIDE? (TYPICALLY THE <br />UPPER TERMINALS). <br />DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE <br />LOCKABLE, AND BE A VISIBLE-BREAK SWITCH <br />RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV <br />ARRAY OR5 FT INSIDE A BUILDING WITHIN 10 SECONDS, CONTROLLED <br />CONDUCTORS <30V AND <240VA [NEC 690.12]. LOCATION OF LABEL <br />ACCORDING TO AHJ <br />ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO NEC 690.8, <br />690.9, AND 240. <br />MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR <br />GROUPED FUSES IN ACCORDANCE WITH NEC 110.3(B). <br />IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT <br />PROTECTION ACCORDING TO NEC 690.11 AND UL1699B. <br />INTERCONNECTION NOTES: <br />LOAD-SIDE INTERCONNECTION SHALL BE iN ACCORDANCE WITH [NEG <br />690.64 (B)] <br />THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY <br />NOT EXCEED 120% OF BUSBAR RATING [NEC 705.12(D)(2)(3)} <br />WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV <br />DEDICATED BACKFFED BREAKERS MUST BE LOCATED OPPOSITE END OF <br />THE BUS FROM THE UTILITY SOURCE OCPD {NEG 705.12(D}2\(3)]. <br />AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL <br />OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. <br />HOWEVER, THE COMBINED OVERCURRENT DEVICE MAY 8E EXCLUDED <br />ACCORDING TO NEG 705.12 (D)(2)(3\(C). <br />FEEDER TAP INTERCONECTION (LOAD SIDE) ACCORDING TO NEC 705.12 <br />(x2\(1) <br />SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO NEC 705.12 (A) WITH <br />SERVICE ENTRANCE CONDUGTORS IN ACCORDANCE WITH NEC 230.42 <br />BACKFEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS. <br />EXEMPT FROM ADDITIONAL FASTENING [NEC 705.12 (D5). <br />Signed 10/10/202: <br />C o m p l e t e S o l a r <br />A B r i g h t e r Way. <br />3000 EXECUTIVE PKWY, <br />STE 504 SAN RAMON, <br />C A 94583 <br />LICENSE TYPE C10 <br />LICENSE # 961988 <br />PHONE# (877) 299-4943 <br />J <br />D E S I G N E R : O D J <br />NOAH G U A R D A D O <br />RESIDENCE <br />1623 E FRUIT ST, <br />SANTA ANA, <br />CA 92701 <br />APN:40029515 <br />DATE:11/2/2022 <br />SHEET <br />T-2 <br />PLAN NOTES <br />1623 E Fruit St <br />03/16/23