My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1705 W Cubbon St - Plan
PBA
>
Building
>
ProjectDox
>
C
>
Cubbon St
>
1705 W Cubbon St
>
1705 W Cubbon St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:00:00 PM
Creation date
6/1/2025 11:59:45 AM
Metadata
Fields
Template:
Plan
Permit Number
20179314
101114650
Full Address
1705 W Cubbon St
Document Relationships
101114650 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Cubbon St\1705 W Cubbon St
20179314 - Permit
(Permit - Plan)
Path:
\Building\Permits\C\Cubbon St\1705 W Cubbon St
Text box
ID:
1
Creator:
Import Agent
Created:
6/1/2025 11:59 AM
Modified:
5/30/2025 1:30 PM
Text:
http://www.ahzengineers.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Job Code: PET MARTINEZ <br />6 of 6 <br />Existing structure is assumed to have been designed and constructed following appropriate codes at <br />time of erection, and assumed to have appropriate permits. The calculations produced are only for the <br />roof framing supporting the proposed PV installation referenced in the stamped planset and were <br />completed according to generally recognized structural analysis standards and procedures, professional <br />engineering and design experience, opinions and judgements. Existing deficiencies which are unknown or <br />were not observable during time of inspection are not included in this scope of work. All PV modules, <br />racking, and mounting equipment shall be designed and installed per manufacturer's approved <br />installation specifications. The Engineer of Record and the engineering consulting firm assume no <br />responsibility for misuse or improper installation. This analysis is not stamped for water leakage. <br />Framing was determined based on information in provided plans and/or photos, along with engineering <br />judgement. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and <br />spans noted in the stamped plans, calculations, and cert letter (where applicable) and notify the <br />Engineer of Record of any discrepancies prior to starting construction. Contractor shall also verify that <br />there is no damaged framing that was not addressed in stamped plans, calculations, and cert letter <br />(where applicable) and notify the Engineer of Record of any concerns prior to starting construction. <br />www.ahzengineers.com <br />1705 W Cubbon St <br />04/14/23
The URL can be used to link to this page
Your browser does not support the video tag.