Laserfiche WebLink
SHEET INDEX <br />DESCRIPTION <br />GENERAL NOTES <br />APPLICABLE CODES <br />PHOTOVOLTAIC NOTES <br />AERIAL VIEW <br />VICINITY MAP <br />UNIT INDEX <br />PV-0 <br />Inverter (INV) <br />Main Service Panel (MSP) <br />Utility Meter (UM) <br />Production Meter (PM) <br />Itron Meter (IM) <br />IQ Combiner Box (IQ) <br />Junction Box (J/B) <br />FIRE SETBACK (36'' TYP) <br />FIRE SETBACK (18'' TYP) <br />Service Sub Panel (SSP) <br />PV Load Center (PV) <br />AC Disconnect (ACD) <br />Conduit <br />Solar Module <br />PROJECT DESCRIPTION:SCOPE: <br />2.40 KW DC Roof Mounted <br />PV Electrical System <br />6 - Ureco 400W PV Modules <br />6 - IQ8+ Enphase Microinverters <br />DATE:03/10/2023 <br />SCALE:AS NOTED PAPER SIZE:17"x11" <br />CUSTOMER INFORMATION <br />BUILDING INFO: <br />ONE STORY BUILDING <br />ROOF TYPE: COMPOSITION SHINGLE <br />ROOF STRUCTURE: <br />2''X4'' RAFTERS 24'' O/C <br />MOUNTING SYSTEM: <br />IRONRIDGE RACKING <br />PARCEL NUMBER: 10936105 <br />LOT AREA: 6,272 SQFT <br />LIVING AREA: 1,139 SQFT <br />COMPANY NAME: SKYSOLARPRO <br />ANDREY LITVINOV: #867980 TYPE: C10 <br />DATE: 11/30/2023 <br />ADDRESS: 11208 DONA LOLA DRIVE <br />STUDIO CITY, CA 91604 <br />PHONE: (323) 428-4892 <br />SIGNATURE <br />NAME: PET MARTINEZ <br />ADDRESS: 1705 W CUBBON ST, <br />SANTA ANA, CA 92703 <br />CITY OF SANTA ANA <br />UTILITY: SCE <br />SOLAR MODULES: <br />INVERTERS: <br />EXISTING: <br />MSP BUS: <br />MAIN BREAKER: <br />1P, 3W, 120/240V <br />100A <br />100A <br />ELECTRICAL INFORMATION <br />NEW PV BREAKER: 20A <br />COVER PAGE <br />INDEX NO. <br />PV-0 <br />PV-1 <br />PV-2 <br />PV-3 <br />PV-4 <br />PV-5 <br />PV-6 <br />D-1 <br />D-2 <br />D-3 <br />D-4 <br />D-5 <br />D-6 <br />D-7 <br />COVER PAGE <br />SITE PLAN <br />THREE LINE DIAGRAM <br />ELECTRICAL CALCULATION <br />ATTACHMENT LAYOUT <br />STRUCTURAL DETAIL <br />CODE REQUIRED SIGNAGE <br />MODULE DATA SHEET <br />INVERTER DATA SHEET <br />IQ COMBINER BOX DATA SHEET <br />SYSTEM SIZE: DC STC: 2.40 kW <br /> AC CEC: 2.14 kW <br />1. ROOFTOP MOUNTED PHOTOVOLTAIC PANELS AND MODULES SHALL BE TESTED, LISTED AND IDENTIFIED UL 1703. <br />2. SOLAR SYSTEM SHALL NOT COVER ANY PLUMBING OR MECHANICAL VENTS. <br />3. MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED. <br />4. SOLAR INVERTER MUST HAVE A MANUFACTURE INSTALLED DISCONNECTING MEANS THAT PREVENTS PARALLEL FEEDING UTILITY LINES DURING POWER OUTAGE. <br />5. REMOVAL OF AN INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE <br />PHOTOVOLTAIC SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTORS. <br />6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE. <br />7. LIVE PARTS OF PV SOURCE CIRCUITS AND PV OUTPUT CIRCUITS OVER 150V TO GROUND SHALL NOT BE ACCESSIBLE TO OTHER THAN QUALIFIED PERSONS WHILE ENERGIZED. <br />8. INVERTER IS EQUIPPED W/ INTEGRATED GFDI, THUS PROVIDING GROUND FAULT PROTECTION. <br />9. ALL CONDUCTORS SHALL BE COPPER AND 90 DEG RATED. <br />10. ALL ELECTRICAL EQUIPMENT SHALL BE LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY OR APPROVED BY THE DEPARTMENT. <br />11. CONDUITS SHOULD BE PAINTED TO MATCH EXISTING ROOF AND WALL COLORS. <br />12. ALL WORK SHALL BE IN ACCORD WITH THE 2022 CBC, 2022 CEC AND 2022 NEC WITH SPECIAL EMPHASIS ON ARTICLE 690. <br />13. THE OUTPUT OF A UTILITY INTERACTIVE-INVERTER SHALL BE PERMITTED TO BE CONNECTED TO THE SUPPLY SIDE OF THE SERVICE DISCONNECTING MEANS AS PER 230.82(6). <br />14. A SINGLE CONDUCTOR SHALL BE PERMITTED TO BE USED TO PERFORM THE MULTIPLE FUNCTIONS OF DC GROUNDING, AC GROUNDING AND BONDING BETWEEN AC AND DC SYSTEMS <br />SIZED AS PER SEC 250.122 <br />15. EQUIPMENT GROUND CONDUCTOR REQUIRED IN RACEWAYS SIZED PER CEC 250-122. <br />16. PER ART NON-CURRENT CARRYING METAL PARTS OF EQUIPMENT SHALL BE EFFECTIVELY BONDED TOGETHER. <br />(13) ENPHASE IQ8PLUS-72-2-US [240] [SI1] (120/240V) <br />MICROINVERTERS <br />(13) URECO 400W (FBM400MFG-BB) <br />RACKING DATA SHEET <br />ATTACHMENT DATA SHEET <br />GROUNDING SPECS <br />RACKING CERTIFICATION <br />RACKING DETAILSD-8 <br />2022 CALIFORNIA ELECTRICAL CODE <br />2022 CALIFORNIA BUILDING CODE <br />2022 CALIFORNIA GREEN BUILDING STANDARDS CODE <br />2022 CALIFORNIA ENERGY CODE <br />2022 CALIFORNIA MECHANICAL CODE <br />2022 CALIFORNIA PLUMBING CODE <br />2022 CALIFORNIA RESIDENTIAL CODE <br />2022 CALIFORNIA FIRE CODE <br />2022 NATIONAL ELECTRICAL CODE <br />ALL OTHER ORDINANCE ADOPTED BY THE <br />LOCAL GOVERNING AGENCIES <br />ALL ELECTRICAL WORK TO BE INSTALLED BY A QUALIFIED AND LICENSED <br />ELECTRICAL CONTRACTOR. <br />ALL SOLAR MODULES SHALL BE UL LISTED 1703 & CEC APPROVED. ALL <br />INVERTERS SHALL BE UL LISTED 1741 CERTIFIED & CEC APPROVED. ALL <br />ELECTRICAL COMPONENTS AND MATERIALS SHALL BE LISTED FOR IT'S <br />PURPOSE AND INSTALLED IN A WORKMAN LIKE MANNER. ALL OUTDOOR <br />EQUIPMENT SHALL MEET APPROPRIATE NEMA STANDARDS. <br />THE ELECTRICAL CONTRACTOR IS ADVISED THAT ALL DRAWINGS AND <br />COMPONENT MANUALS ARE TO BE UNDERSTOOD PRIOR TO INSTALLATION. <br />THE CONTRACTOR IS ADVISED TO HAVE ALL SWITCHES IN THE OFF POSITION <br />AND FUSES REMOVED PRIOR TO INSTALLATION OF FUSE-BEARING <br />COMPONENTS. <br />THIS SYSTEM IS INTENDED TO BE OPERATED IN PARALLEL WITH THE UTILITY <br />SERVICE PROVIDER. ANTI-ISLANDING PROTECTION IS A REQUIREMENT OF UL <br />1741 AND IS INTENDED TO PREVENT THE OPERATION OF THE PV SYSTEM <br />WHEN THE UTILITY GRID IS NOT OPERATIONAL. <br />PERMISSION TO OPERATE THE SYSTEM IS NOT AUTHORIZED UNTIL FINAL <br />INSPECTIONS AND APPROVALS ARE OBTAINED FROM THE LOCAL AUTHORITY <br />HAVING JURISDICTION AND THE LOCAL UTILITY SERVICE PROVIDER. <br />THE METHOD OF ATTACHMENT CREATES A UNIFIED STRUCTURE TO MEET <br />DEAD LOAD, WIND LOAD, AND SEISMIC REQUIREMENTS. SOLAR MODULES <br />WILL BE SECURED TO THE EXISTING ROOF AS SPECIFIED ON THE <br />STRUCTURAL SHEETS. EXISTING ROOF EQUIPMENT WILL NOT BE EFFECTED <br />BY THE PV SYSTEM. ALL STRUCTURAL DESIGN AND INSTALLATION <br />COMPONENTS ARE THE RESPONSIBILITY OF OTHERS AND OUTSIDE THE <br />SCOPE OF THIS DOCUMENT. <br />ALL FASTENERS SHALL BE CORROSION RESISTANT APPROPRIATE FOR SITE <br />CONDITIONS. CONNECTORS SHALL BE TORQUED PER DEVICE LISTING OR <br />ENGINEERING RECOMMENDATIONS. <br />ALL ROOFING REPAIR MUST MAINTAIN EXISTING CLASS AND TYPE OF ROOF <br />AND ALL WORK SHALL BE IN ACCORDANCE WITH THE ROOF IN <br />MANUFACTURER'S INSTALLATION REQUIREMENTS. <br />The scope of the plans is for the installation of the solar <br />photovoltaic system only and the approval is subject to <br />compliance with all applicable city and state codes and <br />regulations regarding construction. The approval of the plans <br />does not constitute any certification of the accuracy, <br />completeness, or building permit status of the existing <br />buildings and structures as shown. <br />Bldg# 101114650 <br />Elec# 20179314 <br />Issued 04/13/23 <br />1705 W Cubbon St <br />04/14/23