Laserfiche WebLink
By: J.R. <br />Date: 12/13/23 <br />Gravity Loads: <br />DEMAND DECREASED BY 6.43% = OK! <br />Lateral Loads: <br />DEMAND INCREASED BY 2.99% < 10% = OK! <br />Anchorage: <br />DEMAND OF 646.5LB. < CAPACITY OF 851.2LB. = OK! <br />USE (1) 5/16IN. DIA. LAG SCREW(S) AT 6FT. MAX. O.C. W/ 2.5IN. MIN. PENETRATION <br />Summary: <br />STRUCTURE IS ADEQUATE FOR THE PROPOSED PV ARRA <br />ANCHORS ON EAVES/OVERHANGS ARE OK! <br />Summary <br />12/13/2023  2:14 PM <br />7 of 7 <br />©McPherson Engineering <br />1817 W Meriday Ln- <br />201819032/22/2024