Laserfiche WebLink
Limits of Scope of Work and Liability: <br />The calculations produced are only for the roof framing supporting the proposed PV installation <br />referenced in the stamped planset and were completed according to generally recognized structural <br />analysis standards and procedures, professional engineering and design experience, opinions and <br />judgments. Existing deficiencies which are unknown or were not observable during time of inspection <br />are not included in this scope of work. This analysis is not stamped for water leakage. Prior to <br />commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the <br />stamped plans, calculations, and cert letter (where applicable) and notify the Engineer of Record of any <br />discrepancies prior to starting construction. Contractor shall also verify that there is no damaged framing <br />that was not addressed in stamped plans, calculations, and cert letter (where applicable) and notify the <br />Engineer of Record of any concerns prior to starting construction. <br />Page 8 of 8 <br />Celia Meneses <br />1760 Chicago Ave Suite J13, Riverside, CA 92507 (951) 405-1733info@currentrenewableseng.com <br />1617 W Carriage <br />Dr05/23/23