My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1931 W Deerefield Rd - 20180344 - Plan
PBA
>
Building
>
ProjectDox
>
D
>
Deerefield Rd
>
1931 W Deerefield Rd
>
1931 W Deerefield Rd - 20180344 - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2025 2:12:55 AM
Creation date
6/1/2025 11:59:57 AM
Metadata
Fields
Template:
Plan
Permit Number
20180344
Full Address
1931 W Deerefield Rd
Street Number
1931
Street Direction
W
Street Name
Deerefield
Street Suffix
Rd
Document Relationships
20180344 - Permit
(Permit - Plan)
Path:
\Building\Permits\D\Deerefield Rd\1931 W Deerefield Rd
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
· <br />RAPID SHUTDOWN SWITCH FOR <br />SOLAR PV SYSTEM <br />SOLAR PV SYSTEM EQUIPPED <br />WITH RAPID SHUTDOWN <br />TURN RAPID SHUTDOWN <br />SWITCH TO THE "OFF" <br />POSITION TO SHUT DOWN <br />AND REDUCE SHOCK <br />HAZARD IN THE ARRAY <br />SOLAR ELECTRIC <br />PV PANELS <br />SIGNAGE LOCATIONS: <br />· SHALL BE LOCATED ON OR NO MORE THAN 1 M (3 FT) <br />FROM THE SERVICE DISCONNECTING MEANS TO WHICH <br />THE PV SYSTEMS ARE CONNECTED. <br />AMPS <br />VOLTS <br />PHOTOVOLTAIC POINT OF <br />INTERCONNECTION <br />WARNING: DUAL POWER SOURCE. <br />SECOND SOURCE IS PHOTOVOLTAIC <br />SYSTEM <br />SIGNAGE LOCATIONS: <br />· MAIN SERVICE PANEL <br />· INDOOR / OUTDOOR SUBPANEL <br />MAXIMUM RATED AC OUTPUT CURRENT: <br />MAXIMUM OPERATING AC VOLTAGE: <br />51.2 A <br />240 V <br />1. MATERIAL USED FOR THE SIGNAGE SHALL BE REFLECTIVE, <br />WEATHER RESISTANT AND SUITABLE FOR THE <br />ENVIRONMENT. <br />2. ALL SIGNAGE SHALL HAVE ALL CAPITAL LETTERS WITH <br />MINIMUM 3 8" LETTER HEIGHT, WHITE ON RED BACKGROUND. <br />3. MAIN SERVICE DISCONNECT MARKING SHALL BE PLACED <br />ADJACENT TO MAIN SERVICE DISCONNECT IN A LOCATION <br />CLEARLY VISIBLE FROM THE LOCATION WHERE THE LEVER <br />IS OPERATED. <br />4. MARKING IS REQUIRED ON ALL INTERIOR AND EXTERIOR DC <br />CONDUIT, RACEWAYS, ENCLOSURES, CABLE ASSEMBLIES, <br />AND JUNCTION BOXES TO ALERT THE FIRE SERVICE TO <br />AVOID CUTTING THEM. MARKINGS SHALL BE PLACED EVERY <br />10', AT TURNS AND ABOVE AND/OR BELOW PENETRATIONS, <br />AND AT ALL DC COMBINER AND JUNCTION BOXES. <br />5. DO NOT USE SCREWS FOR SIGNAGE ATTACHMENT. USE <br />ONLY APPROVED ADHESIVE. <br />SIGNAGE NOTES <br />ELECTRICAL DATA & SPECIFICATIONS <br />SIGNAGE LOCATIONS: <br />· MAIN SERVICE PANEL <br />MAIN SERVICE <br />BREAKER <br />HAS BEEN DOWNSIZED TO (N) 200A. <br />NO UPSIZING IS PERMITTED <br />PV SOLAR BREAKER <br />DO NOT RELOCATE THIS OVERCURRENT DEVICE <br />NEC 705.12(B)(3)(2) <br />SIGNAGE LOCATIONS: <br />· MAIN SERVICE PANEL <br />· NEW INDOOR / OUTDOOR LOAD CENTER <br />· INDOOR / OUTDOOR SUBPANEL <br />PROJECT <br />INSTALLER <br />1 <br />4 <br /> <br />1 <br /> <br />4 <br /> <br /> <br />H <br />A <br /> R <br /> <br />B <br /> <br />O <br /> <br />U <br /> <br />R <br /> <br /> W <br /> <br />A <br /> Y <br /> <br /> S <br /> <br />O <br /> <br />U <br /> <br />T <br /> <br />H <br />R <br />I <br /> <br />C <br /> <br />H <br /> <br />M <br /> <br />O <br /> <br />N <br /> <br />D <br /> <br />, <br /> <br /> C <br /> <br />A <br /> <br /> <br /> <br />9 <br />4 <br /> <br />8 <br /> <br />0 <br /> <br />4 <br />( <br />5 <br /> <br />1 <br /> <br />0 <br /> <br />) <br /> <br /> 5 <br /> <br />4 <br /> <br />0 <br /> <br />- <br /> <br />0 <br /> <br />5 <br /> <br />5 <br /> <br />0 <br />C <br />O <br /> <br />R <br /> <br />P <br /> <br />O <br /> <br />R <br /> <br />A <br /> T <br /> <br />I <br /> <br />O <br /> <br />N <br /> <br />, <br /> <br /> <br /> <br />S <br />Y <br /> <br />S <br /> <br />T <br /> <br />E <br /> <br />M <br /> <br />S <br />R E V I S I O N S <br />SO <br />L <br />A <br />R <br /> <br />I <br />N <br />D <br />I <br />V <br />I <br />D <br />U <br />A <br />L <br /> <br />P <br />E <br />R <br />M <br />I <br />T <br /> <br />P <br />A <br />C <br />K <br />A <br />G <br />E <br />GR <br />I <br />D <br />- <br />T <br />I <br />E <br />D <br /> <br />P <br />H <br />O <br />T <br />O <br />V <br />OL <br />T <br />A <br />IC <br /> <br />S <br />Y <br />S <br />T <br />E <br />M <br />REV DESCRIPTION DATE DB <br />DRAWN BY: <br />DATE DRAWN <br />SCALE <br />01 AHJ REDLINES 06/15/23 JS <br />02 AHJ REDLINES 07/19/23 JS <br />03 AHJ REDLINES 08/01/23 JS <br />TH <br />O <br />M <br />A <br />S <br />N <br />G <br />U <br />Y <br />E <br />N <br />19 <br />3 <br />1 <br /> <br />W <br />E <br />S <br />T <br /> <br />D <br />E <br />E <br />R <br />E <br />F <br />I <br />E <br />L <br />D <br /> <br />R <br />O <br />A <br />D <br />SA <br />NT <br />A <br /> A <br />NA <br />, <br />C <br />A <br />LI <br />F <br />O <br />R <br />N <br />I <br />A <br /> 9 <br />2 <br />7 <br />0 <br />4 <br />RP-365293 <br />13 <br />. <br />6 <br />0 <br /> <br />k <br />W <br />SPRI - ANAHEIM <br />12-01-2022 <br />J. Serrano <br />JOSHUA SERRANO <br />SHEET <br />EL <br />E <br />C <br />T <br />R <br />I <br />C <br />A <br />L <br />D <br />A <br />TA <br /> & <br /> <br />S <br />P <br />E <br />C <br />I <br />F <br />I <br />C <br />A <br />TI <br />O <br />N <br />S <br />NTS <br />PVE-3 <br />1931 W Deerefield <br />Rd - 2018034408/07/23
The URL can be used to link to this page
Your browser does not support the video tag.