My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004 W Picasso - Plan
PBA
>
Building
>
ProjectDox
>
P
>
Picasso
>
2004 W Picasso
>
2004 W Picasso - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:00:15 PM
Creation date
6/1/2025 12:00:01 PM
Metadata
Fields
Template:
Plan
Permit Number
20180620
101116243
Full Address
2004 W Picasso
Document Relationships
101116243 - Permit
(Permit - Plan)
Path:
\Building\Permits\P\Picasso\2004 W Picasso
20180620 - Permit
(Permit - Plan)
Path:
\Building\Permits\P\Picasso\2004 W Picasso
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ENGINEERED POWER SOLUTIONS <br />72 SOUTH MAIN STREET, SUITE A <br />TEMPLETON, CA 93465 <br />Solar Warehouse Rail Analysis – Generic Packet <br />1.2 – Scope of Work, Results, and Limitations <br />• Scope of Work: <br />EPS has been hired by Solar Warehouse (SWH) to address the following items: <br />o Determination of the specified design loads on the flush mounted rail system <br />including dead loads, wind loads, snow loads, seismic loads, etc. based on the <br />parameters provided by SWH. <br />o Determination of the maximum allowable rail spans for the (2) proposed rail <br />profiles (Standard and Ecolite) based on multiple loading scenarios, the <br />section properties of the rails and racking components, and the geometry of <br />the array. <br />o Allowable locations of the proposed rail splice in regards to rail span <br />conditions. <br />Page 4 <br />2004 W Picasso - <br />2018062008/29/23
The URL can be used to link to this page
Your browser does not support the video tag.