Laserfiche WebLink
ENGINEERED POWER SOLUTIONS <br />72 SOUTH MAIN STREET, SUITE A <br />TEMPLETON, CA 93465 <br />Solar Warehouse Rail Analysis – Generic Packet <br />2.3 – Allowable Splice Locations <br />Rail Splices are to be located within a 1ft length at 25% of the span away from an <br /> exterior anchor or 2ft length at 25% of the span for interior anchor. (See figure <br /> below) <br />Single Span <br />Continuous Span (3 spans or greater) <br />Page 60 <br />2004 W Picasso - <br />2018062008/29/23