Laserfiche WebLink
ADDRESS:CONTRACTOR:EQUIPMENT:DATE REV C <br />KW (DC) KW (AC) Delta M4-TL-US PV4 <br />GAF Energy Timberline Solar ES (46W)MOUNTING DETAIL <br />BY: ZDucatt <br />2006 Deodar Street (56) <br />1/22/2024 <br />Ronald Shepherd GAF Energy LLC (CA)2.576 <br />973-628-3411 125 Mitchell Blvd, Suite D <br />4 (1) <br />Santa Ana CA 92705 B #1062345 C-10 San Rafael CA 94903 <br />INSTALLATION NOTES <br />MINIMUM SHEATHING THICKNESS: 7/16" OSB or 15/32" PLYWOOD. <br />FULL TEAR OFF REQUIRED PRIOR TO INSTALLATION TO VERIFY DECKING THICKNESS, CONDITION, AND <br />CODE-COMPLIANT ATTACHMENT TO STRUCTURE. <br />PLEASE SEE ATTACHED STAMPED STRUCTURAL ENGINEERING LETTER FOR ADDITIONAL EXPLANATION <br />REGARDING PE REVIEW/ REQUIREMENTS FOR THE TIMBERLINE SOLAR PRODU CT. <br />BIPV SHINGLES (PV MODULES) <br />TOP VIEW <br />(NOT TO SCALE) <br />BIPV SHINGLES (PV MODULES) <br />SIDE VIEW <br />(NOT TO SCALE)NOTE: Please see attached Stamped Structural Engineering letter for additional explanation regarding PE <br />review/ requirements for the Timberline Solar product. <br />Compliance Report # 105171274LAX-001a <br />1 - 1/4" NAILS WILL BE USED TO SECURE SOLAR SHINGLE <br />Plan check NOTES: <br />See highlights for Key Specs. MAS (19) <br />2006 N Deodar St - 101118000 & <br />20181911 <br />6/11/2024