Laserfiche WebLink
SCOPE OF WORK <br />SYSTEM SIZE: STC: 87 X 450W = 39.150KW <br />PTC: 87 X 426.6W = 37.114KW <br />(87) YOTTA YSM-B450-1 <br />(22) YOTTA DPI-208 <br />ATTACHMENT TYPE: UNIRAC BALLASTED MOUNT RM10 EVO <br />MSP UPGRADE: NO <br />OWNER <br />NAME: AZ-3320 <br />PROJECT MANAGER <br />NAME: ANTHONY BARO <br />PHONE: <br />CONTRACTOR <br />NAME:E2SOL <br />PHONE:401-489-2273 <br />AUTHORITIES HAVING JURISDICTION <br />BUILDING: SANTA ANA CITY <br />ZONING: SANTA ANA CITY <br />UTILITY: <br />DESIGN SPECIFICATIONS <br />OCCUPANCY: MERCANTILE GROUP M <br />CONSTRUCTION TYPE: V-B <br />CONSTRUCTION: TRUSS 2'-0" O.C. <br />TOTAL BUILDING AREA: 5516 SQ. FT. <br />ZONNING: COMMERCIAL <br />GROUND SNOW LOAD: 0 PSF <br />WIND EXPOSURE: B <br />WIND SPEED: 95 MPH <br />APPLICABLE CODES & STANDARDS <br />BUILDING: CBC 2022 <br />ELECTRICAL: CEC 2022 <br />FIRE: CFC 2022 <br />PROJECT INFORMATION <br />NEW PV SYSTEM: 39.150 kWp <br />AZ-3320 <br />2007 S MAIN ST, <br />SANTA ANA, CA 92707 <br />ASSESSOR'S #: 403-164-31 <br />C2019G <br />2.1.1 SITE NOTES: <br />2.1.2 A LADDER WILL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. <br />2.1.3 THE PV MODULES ARE CONSIDERED NON-COMBUSTIBLE AND THIS SYSTEM IS A UTILITY <br />INTERACTIVE SYSTEM WITH NO STORAGE BATTERIES. <br />2.1.4 THE SOLAR PV INSTALLATION WILL NOT OBSTRUCT ANY PLUMBING, MECHANICAL, OR BUILDING <br />ROOF VENTS. <br />2.1.5 PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL <br />EQUIPMENT WILL BE PROVIDED AS PER SECTION CEC 110.26. <br />2.1.6 ROOF COVERINGS SHALL BE DESIGNED, INSTALLED, AND MAINTAINED IN ACCORDANCE WITH <br />THIS CODE AND THE APPROVED MANUFACTURER'S INSTRUCTIONS SUCH THAT THE ROOF <br />COVERING SERVES TO PROTECT THE BUILDING OR STRUCTURE. <br />2.2.1 EQUIPMENT LOCATIONS: <br />2.2.2 ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS AS REQUIRED BY CEC 110.26. <br />2.2.3 WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING <br />TEMPERATURE AS SPECIFIED BY CEC 690.31 (A),(C) AND CEC TABLE 310.15 (B)(1). <br />2.2.4 JUNCTION AND PULL BOXES PERMITTED INSTALLED UNDER PV MODULES ACCORDING TO CEC <br />690.34. <br />2.2.5 ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN <br />SIGHT OF THE AC SERVICING DISCONNECT. <br />2.2.6 ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL ACCORDING TO <br />CEC APPLICABLE CODES. <br />2.2.7 ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN <br />APPROPRIATE. <br />2.3.1 STRUCTURAL NOTES: <br />2.3.2 RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT <br />INSTALLATION MANUAL. TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, <br />AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE <br />ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER’S INSTRUCTIONS. <br />2.3.3 JUNCTION BOX WILL BE INSTALLED PER MANUFACTURERS' SPECIFICATIONS. IF <br />ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. <br />2.3.4 ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED W/ APPROVED <br />CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. <br />2.3.5 ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE <br />SPECIFIED BY THE RACKING MANUFACTURER. <br />2.3.6 WHEN POSSIBLE, ALL PV RELATED RACKING ATTACHMENTS WILL BE STAGGERED AMONGST <br />THE ROOF FRAMING MEMBERS. <br />2.4.1 WIRING & CONDUIT NOTES: <br />2.4.2 ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND <br />WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT <br />TO LIMIT UP-SIZING. <br />2.4.3 CONDUCTORS SIZED ACCORDING TO CEC 690.8, CEC 690.7. <br />2.4.4 VOLTAGE DROP LIMITED TO 1.5%. <br />2.4.5 DC WIRING LIMITED TO MODULE FOOTPRINT. MICROINVERTER WIRING SYSTEMS SHALL BE <br />LOCATED AND SECURED UNDER THE ARRAY W/ SUITABLE WIRING CLIPS. <br />2.4.6 AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: <br />PHASE A OR L1- BLACK <br />PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE <br />PHASE C OR L3- BLUE, YELLOW, ORANGE**, OR OTHER CONVENTION <br />NEUTRAL- WHITE OR GRAY <br />IN 4-WIRE DELTA CONNECTED SYSTEMS THE PHASE WITH HIGHER VOLTAGE TO BE MARKED <br />ORANGE [CEC 110.15]. <br />2.5.1 GROUNDING NOTES: <br />2.5.2 GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING <br />DEVICES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. <br />2.5.3 PV EQUIPMENT SHALL BE GROUNDED ACCORDING TO CEC 690.43 AND MINIMUM CEC TABLE <br />250.122. <br />2.5.4 METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES CONSIDERED <br />GROUNDED IN ACCORD WITH 250.134 AND 250.136(A). <br />2.5.5 EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO CEC 690.45 AND <br />MICROINVERTER MANUFACTURERS' INSTRUCTIONS. <br />2.5.6 EACH MODULE WILL BE GROUNDED USING WEEB GROUNDING CLIPS AS SHOWN IN <br />MANUFACTURER DOCUMENTATION AND APPROVED BY THE AHJ. IF WEEBS ARE NOT USED, <br />MODULE GROUNDING LUGS MUST BE INSTALLED AT THE SPECIFIED GROUNDING LUG HOLES <br />PER THE MANUFACTURERS' INSTALLATION REQUIREMENTS. <br />2.5.7 THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL <br />OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. <br />2.5.8 GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR <br />MARKED GREEN IF #4 AWG OR LARGER [CEC 250.119] <br />2.5.9 THE GROUNDING ELECTRODE SYSTEM COMPLIES WITH CEC 690.47 AND CEC 250.50 THROUGH <br />250.106. IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE <br />SYSTEM PROVIDED ACCORDING TO CEC 250, CEC 690.47 AND AHJ. <br />2.5.10 GROUND-FAULT DETECTION SHALL COMPLY WITH CEC 690.41(B)(1) THROUGH (3) TO REDUCE <br />FIRE HAZARDS <br />2.6.1 DISCONNECTION AND OVER-CURRENT PROTECTION NOTES: <br />2.6.2 DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED THE <br />CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED “LINE <br />SIDE” (TYPICALLY THE UPPER TERMINALS). <br />2.6.3 DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A <br />VISIBLE-BREAK SWITCH <br />2.6.4 PV SYSTEM CIRCUITS INSTALLED ON OR IN BUILDINGS SHALL INCLUDE A RAPID SHUTDOWN <br />FUNCTION TO REDUCE SHOCK HAZARD FOR EMERGENCY RESPONDERS IN ACCORDANCE WITH <br />690.12(A) THROUGH (D). <br />2.6.5 ALL OCPD RATINGS AND TYPES SPECIFIED ACCORDING TO CEC 690.8, 690.9, AND 240. <br />2.6.6 MICROINVERTER BRANCHES CONNECTED TO A SINGLE BREAKER OR GROUPED FUSES IN <br />ACCORDANCE WITH CEC 110.3(B). <br />2.6.7 IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION ACCORDING TO <br />CEC 690.11 AND UL1699B. <br />2.7.1 INTERCONNECTION NOTES: <br />2.7.2 LOAD-SIDE INTERCONNECTION SHALL BE IN ACCORDANCE WITH CEC 705.12 <br />2.7.3 THE SUM OF 125 PERCENT OF THE POWER SOURCE(S) OUTPUT CIRCUIT CURRENT AND THE <br />RATING OF THE OVERCURRENT DEVICE PROTECTING THE BUSBAR SHALL NOT EXCEED 120 <br />PERCENT OF THE AMPACITY OF THE BUSBAR, PV DEDICATED BACKFEED BREAKERS MUST BE <br />LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD [CEC 705.12(B)(3)(2)]. <br />2.7.4 AT MULTIPLE ELECTRIC POWER SOURCES OUTPUT COMBINER PANEL, TOTAL RATING OF ALL <br />OVERCURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. HOWEVER, THE <br />COMBINED OVERCURRENT DEVICE MAY BE EXCLUDED ACCORDING TO CEC 705.12 (B)(3)(3). <br />2.7.5 FEEDER TAP INTERCONNECTION (LOAD SIDE) ACCORDING TO CEC 705.12 (B)(1) AND (2) <br />2.7.6 SUPPLY SIDE TAP INTERCONNECTION ACCORDING TO CEC 705.11 WITH SERVICE ENTRANCE <br />CONDUCTORS IN ACCORDANCE WITH CEC 230.42 <br />2.7.7 BACKFEEDING BREAKER FOR ELECTRIC POWER SOURCES OUTPUT IS EXEMPT FROM <br />ADDITIONAL FASTENING [CEC 705.12 (E)]. <br />*CEC2022M <br />*CEC2022M <br />GENERAL NOTES <br />A-201 <br />01 <br />E MAIN ENTRANCE DOOR PROPERTY LINE <br />SOLAR (PV) MODULE <br />EQUIPMENT GROUND <br />CONDUIT <br />FIRE CLEARANCE <br />(E) UTILITY METERM <br />S <br />PNL <br />V MEP <br />AC DISCONNECT <br />AC PANELBOARD <br />PV REVENUE METERMAIN ELECTRICAL PANEL <br />DC/AC INVERTER <br />DC DISCONNECT <br />COMBINER BOX <br />JUNCTION BOX <br />INV <br />DCSW <br />CBR <br />JB U UTILITY POLE <br />TB <br />RSD <br />TAP BOX <br />RAPID SHUTDOWN <br />SUB (AC) PANEL <br />METER/MAIN <br />SUB <br />M/M <br />CBR <br />MODULE STRINGING <br />(DC) COMBINER BOX <br />MODULE STRINGING <br />MODULE STRINGING <br />ATTACHMENTS <br />RAILS <br />ROOF RAFTERS <br />N <br />EW <br />S <br />S-501 <br />D1 <br />26 <br />SYMBOL LEGEND <br />MODULE STRINGING <br />MODULE STRINGING <br />SHEET KEYNOTE INDICATOR <br />DETAIL INDICATOR <br />ELEVATION INDICATOR <br />NORTH INDICATOR <br />DISCLAIMER: PLEASE NOTE THAT THE ABBREVIATIONS, ANNOTATIONS, AND SYMBOLS LISTED ARE INTENDED TO ILLUSTRATE THOSE THAT ARE COMMONLY USED; NOT ALL ARE NECESSARILY UTILIZED WITHIN THIS SET OF DRAWINGS. <br />A <br />B <br />C <br />D <br />A <br />B <br />C <br />D <br />SETBACK <br />G-1 <br />COVER PAGE <br />01 AERIAL PHOTO <br />NOT TO SCALE <br />N <br />EW <br />S <br />02 PLOT MAP <br />NOT TO SCALE <br />N <br />EW <br />S <br />ENGINEER OF RECORD <br />DATE: 8.21.2023 <br />DESIGN BY: V.D. <br />CHECKED BY: D.A. <br />AZ-3320 <br />2007 S MAIN ST, <br /> SANTA ANA, CA 92707 <br />PAPER SIZE: 36" x 24" (ARCH D) <br />A B C D E F G H I J K L M N O <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />A B C D E F G H I J K L M N O <br />CONTRACTOR <br />E2SOL <br />PHONE: <br />LIC. NO.: <br />UNAUTHORIZED USE OF THIS <br />DRAWING SET WITHOUT WRITTEN <br />PERMISSION FROM CONTRACTOR IS IN <br />VIOLATION OF U.S. COPYRIGHT LAWS <br />AND WILL BE SUBJECT TO CIVIL <br />DAMAGES AND PROSECUTIONS. <br />P <br />P <br />NO. DESCRIPTION DATE <br />PROJECT <br />REVISION / RELEASE <br />SHEET NUMBER: <br />SHEET TITLE: <br />401-489-2273 <br />APN: 403-164-31 <br />REPC-134 <br />NEW PV SYSTEM: 39.150 kWp <br />1 REVISION 1 01.10.2024 <br />SHEET LIST TABLE <br />SHEET NUMBER SHEET TITLE <br />G-1 COVER PAGE <br />PV-1 SITE PLAN <br />PV-2 ELECTRICAL ROOF PLAN <br />PV-3 ARRAY PLAN <br />PV-4 THREE LINE DIAGRAM <br />PV-5 PLACARDS <br />PV-6 RESOURCE DOCUMENTS <br />PV-7 RESOURCE DOCUMENTS <br />S <br />M <br />A <br />I <br />N <br /> <br />S <br />T <br />REVISION 1: 01.10.2024 <br />- SHEET G-1: VERIFIED BUILDING SPECS <br />- SHEET PV-1: PROPERTY LINE TAG ADDED <br />-SHEET PV-3: LAYOUT AND CALCULATIONS <br />UPDATED WITH SEISMIC ATTACHMENTS <br />1 <br />Signed 1/10/2024 <br />Bldg#: 101117244 <br />Elec#: 20181345 <br /> <br />Approvals: <br />Planning: FArias <br />Bldg: JLo <br />Elec: MSmith <br />The scope of the plans is for the installation of the <br />solar photovoltaic system only and the approval is <br />subject to compliance with all applicable city and state <br />codes and regulations regarding construction. The <br />approval of the plans does not constitute any <br />certification of the accuracy, completeness, or building <br />permit status of the existing buildings and structures <br />as shown. <br /> <br />2007 S Main St - 101117244 & <br />20181345 <br />3/20/2024