My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006 N Williams St - Plan
PBA
>
Building
>
ProjectDox
>
W
>
Williams St
>
2006 N Williams St
>
2006 N Williams St - Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2025 12:00:25 PM
Creation date
6/1/2025 12:00:13 PM
Metadata
Fields
Template:
Plan
Permit Number
20178629
101113734
Full Address
2006 N Williams St
Document Relationships
101113734 - Permit
(Permit - Plan)
Path:
\Building\Permits\W\Williams St\2006 N Williams St
20178629 - Permit
(Permit - Plan)
Path:
\Building\Permits\W\Williams St\2006 N Williams St
Text box
ID:
1
Creator:
Import Agent
Created:
6/1/2025 12:00 PM
Modified:
5/30/2025 2:26 PM
Text:
http://www.pzse.com
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PlugPV LLC <br />875 Broadway <br />Albany, NY, 12207 <br />Subject: Structural Certification for Installation of Solar Panels <br />Job Number: 23-00506 <br />Client: Hope Schroder - 010524 <br />Address: 2006 North Williams Street, Santa Anta, CA 92705 <br />Attn.: To Whom It May Concern <br />Design Criteria: <br />● <br />● Ground Snow Load = 0 psf; Roof Snow Load = 0 psf ALL ARRAYS <br />● Basic Wind Speed = 95 mph Exposure Category B <br />● Existing Roof Dead Load: ALL ARRAYS = 10 psf <br />● Existing Roof Live Load: 20 psf <br />PV System Assembly <br />Installation Requirements <br />Prepared By: <br />PZSE, Inc. - Structural Engineers <br />Roseville, CA <br />If you have any questions on the above, do not hesitate to call. <br />January 16, 2023 <br />PZSE’s scope of work is limited to performing a structural evaluation of loading at the address above. After review, PZSE certifies <br />that the alteration to the existing structure by installation of the PV system meets the requirements of the applicable codes and <br />criteria shown below: <br />The existing structure is adequate to support the PV alteration per 2022 CEBC §502.4 & 502.5. <br /> The PV module assembly including all structural supporting components shall be installed in accordance with the manufacturers <br />specifications and meet or exceed all requirements set forth by the referenced codes above. <br />The PV system shall be mounted flush to the existing roof surface. The contractor shall notify PZSE of any signs of damage to the <br />roof framing prior to commencing the installation. PZSE shall then determine if the existing roof is adequate to support the <br />applied loads. The electrical engineering and system waterproofing shall be addressed by others. <br />Applicable Codes = 2022 CBC, ASCE 7-16, and NDS-18 <br />2006 North Williams Street <br />Santa Anta, CA 92705 <br />1478 Stone Point Drive, Suite 190, Roseville, CA 95661 <br />T 916.961.3960 F 916.961.3965 W www.pzse.com <br />Experience | Integrity | Empowerment <br />2006 N Williams St <br />02/15/23
The URL can be used to link to this page
Your browser does not support the video tag.